Activity No. 1 RIP v.2
Activity No. 1 RIP v.2
Activity No. 1 RIP v.2
1
Routing Information Protocol v.2
Yr./Sec. : ________ Switching and Routing
Course: ___________________________ Date Started : ______________
I. OBJECTIVES:
1. To configure RIP v.2 network
2. To connect Makati to Ortigas routers
3. Identify routing information in each router
4. Test successful connection
II. MATERIALS:
1. Working PC
2. Cisco Simulator software
3. Lab. Activity No.1 data Sheet
4. Diagram/Figure 1
III. Procedures:
1. Using packet Tracer, construct the diagram in figure 1.
2. Configure Terminal 1-4 according to their network belong.
3. Configure each router according to its location (Makati, Mandaluyong and Ortigas)
Sample configuration:
Makati.
Mandaluyong.
Example:
6. After successfully connected the RIP network, provide sample screenshots of your ouyput
Output 1.
Output 2.
7. Save your work as your group number and activity number (ex. Grp1_Lab.Act1_RIPv.2)
8. Submit this document in TBL hub together with the working PKT file with the same filename.
____________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________
_______________________________________________________________________________________