Daily Check List For STP Operations
Daily Check List For STP Operations
Daily Check List For STP Operations
Time
S.NO. Installation Description Parameters Frequency 8.0 12.0 4.00 8.00 12.0 4.00
AM PM PM PM AM AM
Low/Normal/
1 Daily
Inlet flow meter high
2 Bar screen chamber-Screen Cleaning Yes/No Shift vise
3 Oil & grease Trap Cleaning-Yes/No Shift vise
4 Equalization tank Level Indicator % % tank full
6 Volume of MBBR batch KL Batch wise
7 Time of MBBR batch Minute Batch wise
8 DO percentage TBD
9 MLSS percentage Daily
10 SVI percentage Daily
11 Diffuser Healthiness Nos. Daily
12 ACF, PCF Pressure level KG 4 Hours
13 ACF, PCF Pressure level before & after backwash KG Each Operation
14 ACF, PCF backwash timing Minutes Each Operation
15 pH value value 8 Hours
16 Input water quantity KL Daily
17 Product water quantity KL Daily
18 Outlet water quantity KL Daily
19 Ozonator start & stop timing Minutes Daily
20 BOD PPM Monthly
21 COD PPM Monthly
22 TSS PPM Monthly
23 Sludge Transfer Lot Daily
Remarks
Sign of shift in charge A Shift B Shift C shift