PPL MDL R00
PPL MDL R00
PPL MDL R00
C1-42 Cable Schedule of Entire Plant - Electrical Report Power Protech PPL/DE/23-24/41/Plant-Code
Cable Schedule of Entire Plant - Control System C1-16 Open
C1-43 Work Contract for Electrical Installation C1-16 Report Power Protech PPL/DE/23-24/42/Plant-Code Open
C1-44 Master Bills of Material for Electrical Infra C1-16 BOM Power Protech PPL/DE/23-24/43/Plant-Code Open
C1-45 List of Approved Makes for Deliverables of Supply C1-16 Report Power Protech PPL/DE/23-24/44/Plant-Code Open
D-40 Design of AMF Panel & Control Scheme arrangement C1-18 Report Power Protech PPL/DE/23-24/45/Plant-Code Open
D-41 Design of DG Sizing With Installation Plan C1-18 Report Power Protech PPL/DE/23-24/46/Plant-Code Open
D-42 Design of Power Factor consumption of Entire Plant and Calculation C1-18 Report Power Protech PPL/DE/23-24/47/Plant-Code Open
D-43 Design of APFCR Panel for Entire Plant C1-20 Report Power Protech PPL/DE/23-24/48/Plant-Code Open
D OEM input : For Detailed Engineering Open
D-01 Equipment/Load Datasheet B-7 Datasheet Vendor - Open
D-02 Equipment/Load Installation Manual B-7 Report Vendor - Open
D-03 Equipment/Load Test Report B-7 Report Vendor Open
D-05 Transformer-GA LAYOUT - Detailed drawing C1-2 Drawing Vendor - Open
D-06 Transformer-GTP - As built C1-2 GTP Vendor - Open
D-07 Transformer-Recommended Foundation Drawing D-05 Drawing Vendor - Open
D-08 Transformer-Routine Test Report - Report Vendor - Open
D-09 Transformer-Type Tesr Report - Report Vendor - Open
D-10 RMU-GA LAYOUT - Detailed drawing C1-4 Drawing Vendor - Open
D-11 RMU-GTP -As built C1-4 GTP Vendor - Open
D-12 RMU-Recommended Foundation Drawing D-10 Drawing Vendor - Open
D-13 RMU-Routine Test Report - Report Vendor - Open
D-14 RMU-Type Tesr Report - Report Vendor - Open
D-15 LT Panel-GA LAYOUT - Detailed drawing C1-6 Drawing Vendor - Open
D-16 LT Panel-GTP -As built C1-6 GTP Vendor - Open
D-17 LT Panel-Recommended Foundation Drawing D-15 Drawing Vendor - Open
D-18 LT Panel-Routine Test Report - Report Vendor - Open
D-19 LT Panel-Type Tesr Report - Report Vendor - Open
D-20 PSS -GA LAYOUT - Detailed drawing C1-7 Drawing Vendor - Open
D-21 PSS-GTP - As built C1-7 GTP Vendor - Open
D-22 PSSl-Recommended Foundation Drawing D-20 Drawing Vendor - Open
D-23 PSS-Routine Test Report D-21 Report Vendor - Open
D-24 PSS-Type Tesr Report D-21 Report Vendor - Open
D-25 ACDB Panel -GA LAYOUT - Detailed drawing C1-10 Drawing Vendor - Open
D-26 ACDB Panel-GTP C1-11 GTP Vendor - Open
D-27 ACDB Panel-Recommended Foundation Drawing D-25 Drawing Vendor - Open
D-28 ACDB Panel-Routine Test Report D-26 Report Vendor - Open
D-29 ACDB Panel-Type Tesr Report - Report Vendor - Open
D-30 Aux. Panel-GA LAYOUT C1-9 Drawing Vendor - Open
D-31 Aux. Panel-GTP C1-9 GTP Vendor - Open
D-32 Aux. LT Panel-Recommended Foundation Drawing D-30 Drawing Vendor - Open
D-33 Aux. LT Panel-Routine Test Report D-31 Report Vendor - Open
D-34 Power Cable-GTP C1-12 GTP Vendor - Open
D-35 Power Cable-Routine Test report C1-12 Report Vendor - Open
D-36 Control Cable -GTP C1-13 GTP Vendor - Open
D-37 Control Cable -Routine Test report C1-14 Report Vendor - Open
D-38 Earthing Material -GTP C1-14 GTP Vendor - Open
D-39 Earthing Material -Routine Test report C1-15 Report Vendor - Open
D-40 Design of AMF Panel & Control Scheme arrangment C1-16 Report Vendor Open
D-41 Design of DG Sizing With Installation Plan C1-17 Report Vendor Open
E Engineering Deliverables : Civil & Structural Open
E-10 BOM for Switchyard Foundation - BOM Power Protech PPL/DE/23-24/47/Plant-Code Open
E-14 Meter Room & RMU detailed drawing - Drawing Power Protech PPL/DE/23-24/51/Plant-Code Open
E-15 Cable Trench Layout (Switchyard , Electrical Room , LT panel) D-06 Drawing Power Protech PPL/DE/23-24/52/Plant-Code Open
E-16 Transformer -Foundation Drawing D-07 Drawing Power Protech PPL/DE/23-24/53/Plant-Code Open
E-17 RMU - Foundation drawing D-12 Drawing Power Protech PPL/DE/23-24/54/Plant-Code Open
E-18 LT Panel- Foundation drawing D-17 Drawing Power Protech PPL/DE/23-24/55/Plant-Code Open
E-19 PSS Foundation drawing D-22 Drawing Power Protech PPL/DE/23-24/56/Plant-Code Open
E-20 Fire Wall for Transformer- Detailed Drawings - Drawing Power Protech PPL/DE/23-24/57/Plant-Code Open
E-21 Bus Duct Support member Foundation - Drawing Power Protech PPL/DE/23-24/58/Plant-Code Open
E-22 Motor and Other Equipment Foundation/ Stand Drawing D-02 Drawing Power Protech PPL/DE/23-24/59/Plant-Code Open
E-25 Work Contract for Civil & Structural work - Report Power Protech PPL/DE/23-24/62/Plant-Code Open
E-26 Raceway & Cable Tray Structural drawing with Members and Support with Part BOM Report Power Protech PPL/DE/23-24/63/Plant-Code Open
F Security & Safety Open
F-1 CCTV camera Layout Drawing Power Protech PPL/DE/23-24/63/Plant-Code Open
F-2 Camera Installation and Zone Coverage layout with Placement of DVR C1-18 Drawing Power Protech PPL/DE/23-24/64/Plant-Code Open
F-3 Internet - LAN distribution layout with Router arrangment C1-20 Drawing Power Protech PPL/DE/23-24/65/Plant-Code Open
G Testing Activity – Electrical – Additional Activity to be done apart from MDL. Open
G-1 Providing Testing Reports of Electrical Panels in SAT Format C1-22 BOM Power Protech PPL/DE/23-24/47/Plant-Code Open
G-2 Providing Testing Reports of HV Switchgear in SAT Format - Drawing Power Protech PPL/DE/23-24/51/Plant-Code Open
G-3 Providing Testing Reports of Transformers in SAT Format C1-24 Drawing Power Protech PPL/DE/23-24/52/Plant-Code Open
G-4 Providing Testing Reports of Cables HT in SAT Format D-25 Drawing Power Protech PPL/DE/23-24/53/Plant-Code Open
G-5 Providing Testing Reports of Cables LT in SAT Format D-30 Drawing Power Protech PPL/DE/23-24/54/Plant-Code Open
G-6 Providing Testing Reports of Lighting Fixtures in SAT Format D-35 Drawing Power Protech PPL/DE/23-24/55/Plant-Code Open
G-7 Providing Testing Reports of Earthing in SAT Format E Drawing Power Protech PPL/DE/23-24/56/Plant-Code Open
G-8 Providing Testing Reports of DG in SAT Format - Drawing Power Protech PPL/DE/23-24/57/Plant-Code Open