ANPQP - PROCESS / FACILITY SITE CHANGE REQUEST (PFCR)

R / N Project: Nissan Impt A Impt B Impt C OBD Doc. Ref. No./Ver.:


Safety
Doc Rev. Date:
Regulation Renault 1 2
Doc. Origin Date:
Supplier Name: Supplier Code: E-mail:
Supplier Plant: Author: Tel:
Part Name: Drawing No.:
Part No. & Issue Level: Affected Vehicle(s):
Design Note No. / DEVO LUP No. (Renault Only):

DETAIL OF CHANGE No. of affected R / N Plants:

1. Date of Proposed Change:


List of affected R / N Plants:
2. Reason for Request:
1) Change at 2) Type of Change
Tier 1 Material Source Tooling Process Method Packaging
Facility Site Gauge Storage Method Other
Tier N Equipment Inspection Method Logistic

3. Explanation of Process / Facility Site Change (for Facility Site Change include Why Where from / to):

4. Risk Analysis of Change: Criteria Y N


Is Important / homologation specific feature affected?
Is a new tool or process required?

Does the change introduce a new manufacturing site or


new second tier manufacturing site?

5. Timing Plan Details (append copy of Timing Plan):

6. Predicted Date of Delivery to Customer(s):

7. How will Quality and Capacity Requirements be Assured? (Include details of any planned safety stock):

8. Other(s):

Name: Position: Date: Signed:


Note: This document should be submitted to Renault / Nissan (as appropriate) at least 3 months before the date of the proposed change.

APPROVAL TO PROCEED WITH PROCESS / FACILITY SITE CHANGE Renault Unique R / N use only
Parts DCL-Logistics and Packaging Data Sheet
NOT APPROVED
Control Plan Supplier EDI Agreement
APPROVED Process Flow Chart EDI Submission Warrant
Inspection Report Nissan Unique

Product Validation Test Report Appearance Approval Report


Part Submission Warrant (PSW)
Process Capability Study Result Completed DRBFM Worksheet
Engineering Drawings Packaging Specification
Component Supply Chain Chart (CSCC) Logistic Data
Gauge Specification & Approval Sheet Material Certification
Submit Part Submission Updated Production Capacity Plan Other Requirement
Warrant to Renault / Nissan
together with attachments Audit by Renault and / or Nissan
indicated prior to shipment
of post-change product Process FMEA

Signed: Position: Date:


Signed: Position: Date:
Signed: Position: Date:
Signed: Position: Date:
Note: Approval by Renault and / or Nissan shall not relieve the supplier in any way from its responsibilities

NOTIFICATION OF COMPLETION

Date of Completion: Date of First Production shipment into Renault / Nissan:


Reference of First Production Shipment into Renault / Nissan:
Name: Position: Date: Signed:
We hereby warranty that the process change / facility transfer has been carried out in line with the requirements detailed in this Process / Facility Change Request
document, and that the product will meet all appropriate Renault / Nissan specifications and requirements.