Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Appendix B

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Design office: E W Cox Middle East L L C

Person in charge: SHA


Construction project: SEVEN HOTEL AND APARTMENTS, THE PALM
Number: CGME-7120-cal-002
Position: RESTRAINT TYPE - R Date: 26/05/2021

APPENDIX - B

Input data: Page 1 / 4

Concrete: Static / quasi-static


cracked concrete action
concrete grade: C35/45 Tensile load:
Reinforcement: NSd = 0.00 kN
normal or no reinforcement Shear load:
without edge reinforcement Vx,Sd = 1.00 kN
with limitation of crack width wk ≤ 0.3mm Vy,Sd = 0.00 kN
Anchor bending: Moments:
without anchor bending Mx,Sd = 0.00 kNm
Installation conditions: My,Sd = 0.07 kNm
hammer-drilled hole Mz,Sd = 0.00 kNm

Eccentric load
e x = 0.0 mm
e y = 0.0 mm

Anchor plate: 0.07


x = 30 mm
y = 110 mm
lx1 = 15 mm 0
lx2 = 15 mm 1 .0
ly1 = 15 mm cy1
ly2 = 15 mm
sy1 z
Distance between anchors:
sy1 = 80 mm h x
cy2 y
Edge distances:
1
cy1 = 120 mm
2
cy2 = 120 mm
Thickness of base material: ly1
h = 500 mm
sy1
y ly2 lx1lx2
x

[ kN, kNm ]
Wedge Anchor BZ plus A4 M8 hef 46
Designed acc. to ETAG 001, Annex C
Assessment ETA-99/0010: MKT BZ plus / BZ-IG
The anchorage is verified. Boundary
Tension loads Shear loads Interaction conditions:
bN [%] bV [%] bN,V [%]
Static / quasi-static action 62.3 4.8 50.2 OK

The calculation applies if the hints on the last page are observed.

Anchor Design Program Version 4.30

MKT Metall-Kunststoff-Technik GmbH & Co.KG - Auf dem Immel 2 - D-67685 Weilerbach - Tel.: +49 (0) 63 74 / 91 16 -0 - Fax: +49 (0) 63 74 / 91 16 60
Design office: E W Cox Middle East L L C
Person in charge: SHA
Construction project: SEVEN HOTEL AND APARTMENTS, THE PALM
Number: CGME-7120-cal-002
Position: RESTRAINT TYPE - R Date: 26/05/2021

APPENDIX - B

Wedge Anchor BZ plus A4 M8 hef 46 Page 2 / 4


Assessment ETA-99/0010: MKT BZ plus / BZ-IG

Required proofs of tensile loads

Anchor loads:
Anchor 1 2
NSd [kN] 2.79 2.79

Proof steel failure


h
N Sd ≤ NRk,s / gMs = NRd,s Utilisation:
2.79 ≤ 16.00 / 1.50 = 10.67 26.1%

Proof pullout failure


h
N Sd ≤ NRk,p / gMp = NRd,p Utilisation:
2.79 ≤ 6.71 / 1.50 = 4.47 62.3%
NRk,p YC,(C35/45)
5.00 kN 1.34

Proof concrete cone failure


g
N Sd ≤ NRk,c / gMc = NRd,c Utilisation:
5.57 ≤ 23.80 / 1.50 = 15.87 35.1%
o
N Rk,c YA,c,N Ys,N Yre,N Yec,N
15.07 kN 1.58 1.00 1.00 1.00
o
k1 Ac,N A c,N hef fck,cube ccr,N ec1,N ec2,N
2 2 2
7.2 30084 mm 19044 mm 46 mm 45 N/m m 69.0 mm 0.0 mm 0.0 mm

Proof splitting failure


No proof of splitting failure is required because the following condition is fulfilled:
The characteristic resistance for concrete cone failure and pull-out failure is calculated for cracked
concrete and reinforcement resists the splitting forces and limits the crack width to wk ≤ 0,3mm
taking into account the splitting forces according to chapter 7.3.

Anchor Design Program Version 4.30

MKT Metall-Kunststoff-Technik GmbH & Co.KG - Auf dem Immel 2 - D-67685 Weilerbach - Tel.: +49 (0) 63 74 / 91 16 -0 - Fax: +49 (0) 63 74 / 91 16 60
Design office: E W Cox Middle East L L C
Person in charge: SHA
Construction project: SEVEN HOTEL AND APARTMENTS, THE PALM
Number: CGME-7120-cal-002
Position: RESTRAINT TYPE - R Date: 26/05/2021

APPENDIX - B

Wedge Anchor BZ plus A4 M8 hef 46 Page 3 / 4


Assessment ETA-99/0010: MKT BZ plus / BZ-IG

Required proofs of shear loads

Anchor loads:
Anchor 1 2
VSd [kN] 0.50 0.50
Vx,Sd [kN] 0.50 0.50
Vy,Sd [kN] 0.00 0.00

Proof steel failure without lever arm


h
V Sd ≤ VRk,s / gMs = VRd,s Utilisation:
0.50 ≤ 13.00 / 1.25 = 10.40 4.8%

Proof steel failure with lever arm


No proof required.
Fixture is made of metal and is fixed without intermediate layer
or with a levelling layer of mortar with a thickness e ≤ d/2 (compression strength ≥ 30N/mm²)
e d
0 mm 8 mm

Proof concrete pryout failure


g
V Sd ≤ VRk,cp / gMc = VRd,cp Utilisation:
1.00 ≤ 57.13 / 1.50 = 38.09 2.6%
o
N Rk,c YA,c,N Ys,N Yre,N Yec,N k
15.07 kN 1.58 1.00 1.00 1.00 2.40
o
k1 Ac,N A c,N hef fck,cube ccr,N ec1,N ec2,N
2 2 2
7.2 30084 mm 19044 mm 46 mm 45 N/m m 69.0 mm 0.0 mm 0.0 mm

Proof concrete edge failure (closest edge) Edge cy2


g
V Sd ≤ VRk,c / gMc = VRd,c Utilisation:
1 0.50 ≤ 53.26 / 1.50 = 35.51 1.4%
2 1.00 ≤ 108.94 / 1.50 = 72.63 1.4%
o
V Rk,c YA,c,V Ys , V Yh,V YaV Yec,V Yre,V
1 21.31 kN 1.00 1.00 1.00 2.50 1.00 1.00
2 43.58 kN 1.00 1.00 1.00 2.50 1.00 1.00
o
Anchor c1 Ac , V A c,V aV eV
2 2
1 2 120 mm 64800 m m 64800 m m 90 0.00 mm
2 2
2 1,2 200 mm 1800 cm 1800 cm 90 0.00 mm
k1 dnom lf fck,cube
2
1.7 8 mm 46 mm 45 N/m m

Interaction, combined load in most unfavourable case


a a
bN + bV ≤ 1,0 Utilisation:
1.5 1.5
0.62 + 0.05 = 0.50 ≤ 1,0 50.2%

Anchor Design Program Version 4.30

MKT Metall-Kunststoff-Technik GmbH & Co.KG - Auf dem Immel 2 - D-67685 Weilerbach - Tel.: +49 (0) 63 74 / 91 16 -0 - Fax: +49 (0) 63 74 / 91 16 60
Design office: E W Cox Middle East L L C
Person in charge: SHA
Construction project: SEVEN HOTEL AND APARTMENTS, THE PALM
Number: CGME-7120-cal-002
Position: RESTRAINT TYPE - R Date: 26/05/2021

APPENDIX - B

Wedge Anchor BZ plus A4 M8 hef 46 Page 4 / 4


Assessment ETA-99/0010: MKT BZ plus / BZ-IG

Installation parameters
Thread M = 8 mm
Diameter of drilled hole d0 = 8 mm
Depth of drilled hole h0(1) = 60 mm
Effective anchorage depth hef = 46 mm
Diameter of clearence hole
in the fixture df ≤ 9 mm
Tightening torque Tinst = 20 Nm
Width across nut SW = 13 mm

Remarks
The anchors are without influence of edge distance, if: c ≥ max ( 10 h ef ; 60 d )
Correspond the diameter df of the clearance hole not the specified in Table 4.1 in [1]
or with the design of slotted holes follow the hints in chapter 1.1 in [1].
The calculation regards data for standard thickness of concrete slab.
The design is based on the assumption that the anchor plate remains flat under the acting
forces.
The proof of the capacity of the anchor base component shall be shown according to chapter 7 in [1].

The temperature ranges are specified in [2].


For the proof of concrete edge failure not all load cases (e.g. torsion with shear load parallel to the edge)
are clearly described in the above guidelines.
For these cases the calculation method is applied with latest engineering judgement.

[1] ETAG 001, Annex C


[2] ETAG 001-1

Anchor Design Program Version 4.30

MKT Metall-Kunststoff-Technik GmbH & Co.KG - Auf dem Immel 2 - D-67685 Weilerbach - Tel.: +49 (0) 63 74 / 91 16 -0 - Fax: +49 (0) 63 74 / 91 16 60

You might also like