Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

T638397002P0F2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

UP STANDARD DETAIL REFERENCE DRAWINGS

DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175

N
AWAY AWAY
Remark: Shop Weld CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911

SHOP MATERIALS INSULATION DETAILS FOR COLD PIPING AA-036913

INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630


Filed Weld
TOWARD TOWARD PT N.B.
NOTES
NO DESCRIPTION (INS) STOCK CODE QTY
1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
DOWN
PIPE FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

1 PIPE , CS API 5L-X65Q-PSL2 , SMLS , BE , 4 PPPCS3SMBESTD2S 0F2 1.1 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.


STD , B36.10M , NACE MR0175/ISO 15156 (B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.

5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.

FITTINGS 6. GASKET ALLOWANCE

7. PIPING MATERIAL IS

2 SOCKOLET , CS A694-F65 , CL3000 , SW , 4X1 PLSCO8K3000S223 3


HDR/BRN , SP-97 , NACE MR0175/ISO PIPE SIZE SCHEDULE SPECIFICATION

15156 REF MTO REF MTO REF MTO

638397-002-SPL-01A FLANGES
8 3 WN FLG , CS A859-A CL.2 , CL600 , RF , 4 PFWCOT60RFSTD2A 4
STD , B16.5 , NACE MR0175/ISO 15156 8. WELDING STRESS RELIEF - YES NO

4 WN FLG , CS A859-A CL.2 , CL600 , RF , 4 PFWCOT60RFSTDSO 1 RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 X SHOP FIELD

16 STD , B16.5 , NACE MR0175/ISO 15156 ,


C/W JACK SCREWS , PROJ STD DRG NO
9. TESTING SHOP HYDROSTATIC TEST - YES
THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
FLANGED.
NO

AC-036630

17
10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 6CS2P06_02
. ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.

638397-002-SPL-06 11. INSULATION SHOWN ON DRAWING


N/A
12. REFER TO HYDROSTATIC TEST DIAGRAM.
FIELD MATERIALS
18 19
13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.

14. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.

15. PAINTING / COATING SHALL BE AS PER TB-223080 FOR HARADH AND TB-843596 FOR HAWAIYAH.
FOR CONT. SEE PT N.B. 16. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-011.

SHT 001 20 NO DESCRIPTION (INS) STOCK CODE QTY 17.DELETED.

21 22 0F2

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
E 302950366
9
FITTINGS
0F2 N 2683716199
638397-002-SPL-02 EL +100698 23 5 FIG-8 BLANK , CS A516-70 , CL600 , RF , 4 PK8C7G60RF0009O 1
HOLDS:
1. CERTIFIED VENDOR DATA FOR VALVE / IN LINE INSTRUMENTS / EQUIPMENT.

PROJ STD DRG , NO AD-036636 SPOOLS TO BE FABRICATED BY VENDOR

7
100
6 NIPPLE , CS API 5L-X65Q-PSL2 , SMLS , PE 1 PNPCS3SMPEXSTWE 7 NO.
MARK NO. SIZE
WEIGHT NO.
MARK NO. SIZE
WEIGHT

F05
4"N.B. FW PIECES LBS PIECES LBS

, XS , B36.10M , 4" , NACE MR0175/ISO


S21 FLG3 GAS11 BLT13 16
9
2 24 15156
34 7 90 ELBOW , CS A694-F65 , SW , CL3000 , 1 P9ECO8SWK3B2000 2
F04
4X1"N.B.
FR05-B-490-250-250-0-C-1 432
B16.11
FLG3 GAS11 BLT13 6 101 19
1 8 FIG-8 BLANK , CS A516-70 , CL600 , RF , 1 PK8C7G60RF0009O 1
FW 6 FLG10 GAS12
2 2 08 24 6 STEM UP PROJ STD DRG , NO AD-036636

25 2
105 9 HEX HEAD PLUG , CS A694-F65 , MNPT , 1 PP3CO8MT00B2024 2

3
81 B16.11 , NACE MR0175/ISO 15156
4X1"N.B. 124 124
8 7
53 23
0 24 FLANGES
1
FW FW 24
FLG3 GAS11 FW FW
6 FW FW 10 SW FLG , ITCS A350-LF787 CL.3 , CL600 , 1 PFSC4R60RFXST2A 2 SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
FW 24 RF , XS , B16.5 , NACE MR0175/ISO NO.
MARK NO. SIZE
NO.
MARK NO. SIZE

6
08 8 PIECES PIECES

2 2 22 1 FW 7 15156
TAIL U 6
4X1"N.B. 8
20 81 9 102 FW 101
432 3 102 GASKETS
98 6 TO OWS
7 1"N.B. 11 GASKET , 316 SS-FG , SPIRAL WOUND , 1/8" 4 PGG154S9260BL01 6
17 1 5 EL +100491
81 FW (3.2 MM) THK , 316 SS INNER RING , CS

5
STEM UP TAIL U OUTER RING , CL600 , B16.5 , B16.20
6 E 302950266
20 20 12 GASKET , 316 SS-FG , SPIRAL WOUND , 1/8" 1 PGG154S9260BL01 2
STEM SOUTH N 2683715686 0F2 (3.2 MM) THK , 316 SS INNER RING , CS
18 STEM SOUTH
13
102 EL +100366 OUTER RING , CL600 , B16.5 , B16.20
FW FLG4 GAS11 BLT14
98
F01
9
F02 F03 BOLTS REFERENCE DRAWINGS

GAS11 BLT13 FLG3 GAS11 BLT13


14 F06
FLG10 GAS12 BLT15
13 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2
SF HVY HEX NUTS , A194-2HM , DIA
7/8 PB1BLDSAD000001 32
DRAWING CONTROL SHEET FOR J.O.

PIPING PLAN
10-02029-0003 TD-896993
TA-527464
10-02029-0003
0F2 (IMP) X LEN (IMP) - 152.4 mm Length P&ID TA-527401.001 0F2
2 15
521-L-1159
14 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2 7/8 PB1BLDSAD000001 8 LINE DESIGNATION TABLE TD-527394.102
SF HVY HEX NUTS , A194-2HM , DIA HYDROSTATIC TEST DIAGRAM TA-638440
(IMP) X LEN (IMP) - 177.8 mm Length
PROJECT PIPING MATERIAL SPECIFICATION TE-727826

10
15 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2 5/8 PB1BLDSAD000001 4
SF HVY HEX NUTS , A194-2HM , DIA PIPE SUPPORT STANDARD TE-728359
(IMP) X LEN (IMP) - 101.6 mm Length

VALVES / IN-LINE ITEMS


11 16 CHECK VALVE , CS A216-WCB , CL600 , RF , 4 PVCC2S60RF8QXB1 1
B16.5 , B16.10 DIMS , SWING , API 594 REVISION VALIDATION

12
, BC , ALLOY 825 TRIM W/ STELLITE HF THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ST , NACE MR0175/ISO 15156 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

17 PLUG VALVE , CS A216-WCB , CL600 , RF , 4 PVPC2S60RF7B82C 1 10-02029-0003-001


B16.5 , B16.10 REG , LUBR , API 599 , DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
BC , TAPERED PLUG , ALLOY 825 (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE
STELLITE HF , NACE MR0175/ISO 15156 , AAJ VKP
INVERTED PRESS BALANCE , GO 11/25/2019 11/25/2019
REV.NO. DATE REVISION DESCRIPTION
18 BLIND FLG , CS A105N , CL600 , RF , 4 PFBC1B60RF0002A 1 0F2 11/25/2019 RE-ISSUED FOR CONSTRUCTION
B16.5 , NACE MR0175/ISO 15156
638397-002-SPL-01 JOB ORDER/EWO NO.

10-02029-0003
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
ISO 4"-BD-1170-6CS2P06_02 ISO
FOR CONT. SEE SHT 2A
HARADH GAS COMPRESSION PLANT-2
DESIGN OPERATING TEST PRESS. TEST RADIOGRAPHY % INSULATION TRACING PAINTING STRESS LINE ID
CHEMICAL
CLEANING TEMP. PRESS. TEMP. PRESS. (PSIG) MEDIUM SHOP FIELD THK. TYPE SYS NO. HARADH GCP-2
(DEG. F) (PSIG) (DEG. F) (INCH.) SAUDI ARABIA
(PSIG) HARADH
0F2 PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

NO 230 1200 0-110 5-55 NOTE-12 WATER NOTE 16 NOTE 16 N/A N/A NO NOTE 15 - BD-1170
521 L TB-638397 002 0F2
Saudi Aramco 2825 ENG. (05/05)

RESTRICTED SMART CADD-03


UP STANDARD DETAIL REFERENCE DRAWINGS
DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175

N
AWAY AWAY
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
INSULATION DETAILS FOR COLD PIPING AA-036913

INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630


FOR CONT. SEE SHT 2
TOWARD TOWARD
NOTES
DOWN 19 GATE VALVE , CS A105N , CL800 , SW , 1 PVGC1B80SWE1XNA 1 1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.
B16.11 , MFR DIMS , API 602, OS&Y , 2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

BB , STD PORT , SLD WDG , ALLOY 825 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

TRIM W/ STELLITE HF ST , FG PACKING , 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.

NACE MR0175/ISO 15156 , HW 5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.

20 GATE VALVE , CS A105N , CL800 , T/SW , 1 PVGC1B80TSE1XNA 2 6. GASKET ALLOWANCE

B16.11 , MFR DIMS , API 602, OS&Y , 7. PIPING MATERIAL IS

BB , STD PORT , SLD WDG , ALLOY 825


TRIM W/ STELLITE HF ST , FG PACKING , PIPE SIZE SCHEDULE SPECIFICATION

NACE MR0175/ISO 15156 , HW REF MTO REF MTO REF MTO

PIPE SUPPORTS
21 'T' POST 4 FR05-B-490-250-250-0-C-1 1
8. WELDING STRESS RELIEF - YES NO

RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 X SHOP FIELD


PIECE MARKS NO
9. TESTING SHOP HYDROSTATIC TEST - YES
THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
2 3 FLANGED.

10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 6CS2P06_02
. ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.

11. INSULATION SHOWN ON DRAWING


N/A
12. REFER TO HYDROSTATIC TEST DIAGRAM.

13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.

14. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.

15. PAINTING / COATING SHALL BE AS PER TB-223080 FOR HARADH AND TB-843596 FOR HAWAIYAH.
16. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-011.

17.DELETED.

0F2

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
HOLDS:
1. CERTIFIED VENDOR DATA FOR VALVE / IN LINE INSTRUMENTS / EQUIPMENT.

SPOOLS TO BE FABRICATED BY VENDOR


NO. WEIGHT NO. WEIGHT
MARK NO. SIZE MARK NO. SIZE
PIECES LBS PIECES LBS

SPOOLS TO BE FABRICATED BY SAUDI ARAMCO


NO. NO.
MARK NO. SIZE MARK NO. SIZE
PIECES PIECES

REFERENCE DRAWINGS

DRAWING CONTROL SHEET FOR J.O. 10-02029-0003 TD-896993


PIPING PLAN TA-527464
P&ID TA-527401.001 0F2
LINE DESIGNATION TABLE TD-527394.102
HYDROSTATIC TEST DIAGRAM TA-638440
PROJECT PIPING MATERIAL SPECIFICATION TE-727826
PIPE SUPPORT STANDARD TE-728359

REVISION VALIDATION

THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-02029-0003-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

AAJ VKP
11/25/2019 11/25/2019
REV.NO. DATE REVISION DESCRIPTION

0F2 11/25/2019 RE-ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-02029-0003 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
ISO 4"-BD-1170-6CS2P06_02 ISO
HARADH GAS COMPRESSION PLANT-2
DESIGN OPERATING TEST PRESS. TEST RADIOGRAPHY % INSULATION TRACING PAINTING STRESS LINE ID
CHEMICAL
CLEANING TEMP. PRESS. TEMP. PRESS. (PSIG) MEDIUM SHOP FIELD THK. TYPE SYS NO. HARADH GCP-2
(DEG. F) (PSIG) (DEG. F) (INCH.) SAUDI ARABIA
(PSIG) HARADH
0F2 PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

NO 230 1200 0-110 5-55 NOTE-12 WATER NOTE 16 NOTE 16 N/A N/A NO NOTE 15 - BD-1170
521 L TB-638397 002A 0F2
Saudi Aramco 2825 ENG. (05/05)

RESTRICTED SMART CADD-03

You might also like