T638397002P0F2
T638397002P0F2
T638397002P0F2
N
AWAY AWAY
Remark: Shop Weld CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
1 PIPE , CS API 5L-X65Q-PSL2 , SMLS , BE , 4 PPPCS3SMBESTD2S 0F2 1.1 M 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
7. PIPING MATERIAL IS
638397-002-SPL-01A FLANGES
8 3 WN FLG , CS A859-A CL.2 , CL600 , RF , 4 PFWCOT60RFSTD2A 4
STD , B16.5 , NACE MR0175/ISO 15156 8. WELDING STRESS RELIEF - YES NO
4 WN FLG , CS A859-A CL.2 , CL600 , RF , 4 PFWCOT60RFSTDSO 1 RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 X SHOP FIELD
AC-036630
17
10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 6CS2P06_02
. ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
15. PAINTING / COATING SHALL BE AS PER TB-223080 FOR HARADH AND TB-843596 FOR HAWAIYAH.
FOR CONT. SEE PT N.B. 16. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-011.
21 22 0F2
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
E 302950366
9
FITTINGS
0F2 N 2683716199
638397-002-SPL-02 EL +100698 23 5 FIG-8 BLANK , CS A516-70 , CL600 , RF , 4 PK8C7G60RF0009O 1
HOLDS:
1. CERTIFIED VENDOR DATA FOR VALVE / IN LINE INSTRUMENTS / EQUIPMENT.
7
100
6 NIPPLE , CS API 5L-X65Q-PSL2 , SMLS , PE 1 PNPCS3SMPEXSTWE 7 NO.
MARK NO. SIZE
WEIGHT NO.
MARK NO. SIZE
WEIGHT
F05
4"N.B. FW PIECES LBS PIECES LBS
25 2
105 9 HEX HEAD PLUG , CS A694-F65 , MNPT , 1 PP3CO8MT00B2024 2
3
81 B16.11 , NACE MR0175/ISO 15156
4X1"N.B. 124 124
8 7
53 23
0 24 FLANGES
1
FW FW 24
FLG3 GAS11 FW FW
6 FW FW 10 SW FLG , ITCS A350-LF787 CL.3 , CL600 , 1 PFSC4R60RFXST2A 2 SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
FW 24 RF , XS , B16.5 , NACE MR0175/ISO NO.
MARK NO. SIZE
NO.
MARK NO. SIZE
6
08 8 PIECES PIECES
2 2 22 1 FW 7 15156
TAIL U 6
4X1"N.B. 8
20 81 9 102 FW 101
432 3 102 GASKETS
98 6 TO OWS
7 1"N.B. 11 GASKET , 316 SS-FG , SPIRAL WOUND , 1/8" 4 PGG154S9260BL01 6
17 1 5 EL +100491
81 FW (3.2 MM) THK , 316 SS INNER RING , CS
5
STEM UP TAIL U OUTER RING , CL600 , B16.5 , B16.20
6 E 302950266
20 20 12 GASKET , 316 SS-FG , SPIRAL WOUND , 1/8" 1 PGG154S9260BL01 2
STEM SOUTH N 2683715686 0F2 (3.2 MM) THK , 316 SS INNER RING , CS
18 STEM SOUTH
13
102 EL +100366 OUTER RING , CL600 , B16.5 , B16.20
FW FLG4 GAS11 BLT14
98
F01
9
F02 F03 BOLTS REFERENCE DRAWINGS
PIPING PLAN
10-02029-0003 TD-896993
TA-527464
10-02029-0003
0F2 (IMP) X LEN (IMP) - 152.4 mm Length P&ID TA-527401.001 0F2
2 15
521-L-1159
14 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2 7/8 PB1BLDSAD000001 8 LINE DESIGNATION TABLE TD-527394.102
SF HVY HEX NUTS , A194-2HM , DIA HYDROSTATIC TEST DIAGRAM TA-638440
(IMP) X LEN (IMP) - 177.8 mm Length
PROJECT PIPING MATERIAL SPECIFICATION TE-727826
10
15 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2 5/8 PB1BLDSAD000001 4
SF HVY HEX NUTS , A194-2HM , DIA PIPE SUPPORT STANDARD TE-728359
(IMP) X LEN (IMP) - 101.6 mm Length
12
, BC , ALLOY 825 TRIM W/ STELLITE HF THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ST , NACE MR0175/ISO 15156 REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02029-0003
THIS REVISION IS NOT TO BE USED FOR
CONSTRUCTION UNTIL CERTIFIED AND DATED
NO 230 1200 0-110 5-55 NOTE-12 WATER NOTE 16 NOTE 16 N/A N/A NO NOTE 15 - BD-1170
521 L TB-638397 002 0F2
Saudi Aramco 2825 ENG. (05/05)
N
AWAY AWAY
CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
INSULATION DETAILS FOR COLD PIPING AA-036913
BB , STD PORT , SLD WDG , ALLOY 825 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
TRIM W/ STELLITE HF ST , FG PACKING , 4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.
(B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.
NACE MR0175/ISO 15156 , HW 5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.
PIPE SUPPORTS
21 'T' POST 4 FR05-B-490-250-250-0-C-1 1
8. WELDING STRESS RELIEF - YES NO
10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
SAES-L-105 CLASS 6CS2P06_02
. ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.
13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.
15. PAINTING / COATING SHALL BE AS PER TB-223080 FOR HARADH AND TB-843596 FOR HAWAIYAH.
16. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-011.
17.DELETED.
0F2
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
HOLDS:
1. CERTIFIED VENDOR DATA FOR VALVE / IN LINE INSTRUMENTS / EQUIPMENT.
REFERENCE DRAWINGS
REVISION VALIDATION
THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02029-0003-001
AAJ VKP
11/25/2019 11/25/2019
REV.NO. DATE REVISION DESCRIPTION
NO 230 1200 0-110 5-55 NOTE-12 WATER NOTE 16 NOTE 16 N/A N/A NO NOTE 15 - BD-1170
521 L TB-638397 002A 0F2
Saudi Aramco 2825 ENG. (05/05)