Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

T638398003P0F2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

UP STANDARD DETAIL REFERENCE DRAWINGS

DETAIL OF HEAVY WELDING BOSSES FOR THREADED CONNECTIONS AE-036175

N
AWAY AWAY
Remark: Shop Weld CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911

FIELD MATERIALS INSULATION DETAILS FOR COLD PIPING AA-036913

INSTALLATION OF JACK SCREWS FOR FLANGED JOINTS AC-036630


Filed Weld
TOWARD TOWARD PT N.B.
NOTES
NO DESCRIPTION (INS) STOCK CODE QTY
1. MATERIAL SHOWN WITH A BROKEN LINE AND SPOOLS LISTED IN THE SAUDI ARAMCO
DOWN
FITTINGS FABRICATION LIST ARE NOT TO BE FURNISHED BY THE VENDOR.

2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).

1 90 ELBOW , CS A694-F65 , SW , CL3000 , 1 P9ECO8SWK3B2000 2 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.

4. UNLESS OTHERWISE NOTED. (A) ALL DIMENSIONS ARE TO C OR FACE OF FLANGES.


B16.11 (B) BOLT HOLES ON FLANGES STRADDLE C . (C) WELDING ELBOWS ARE LONG RADIUS.

2 NIPPLE , CS API 5L-X65Q-PSL2 , SMLS , PE 1 PNPCS3SMPEXSTWE 4 5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.

, XS , B36.10M , 4" , NACE MR0175/ISO 6. GASKET ALLOWANCE

7. PIPING MATERIAL IS
15156
3 FIG-8 BLANK , CS A516-70 , CL600 , RF , 1 PK8C7G60RF0009O 1
PROJ STD DRG , NO AD-036636 PIPE SIZE SCHEDULE SPECIFICATION

REF MTO REF MTO REF MTO

FLANGES
4 SW FLG , ITCS A350-LF787 CL.3 , CL600 , 1 PFSC4R60RFXST2A 2
RF , XS , B16.5 , NACE MR0175/ISO NO
8. WELDING STRESS RELIEF - YES
15156 RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 X SHOP FIELD

9. TESTING SHOP HYDROSTATIC TEST - YES NO

GASKETS THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
FLANGED.

5 GASKET , 316 SS-FG , SPIRAL WOUND , 1/8" 1 PGG154S9260BL01 2 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION

(3.2 MM) THK , 316 SS INNER RING , CS SAES-L-105 CLASS 6CS2P06_02


. ALL EXCEPTIONS ARE NOTED ON THE ISOMETRIC.

N/A
OUTER RING , CL600 , B16.5 , B16.20 11. INSULATION SHOWN ON DRAWING

12. REFER TO HYDROSTATIC TEST DIAGRAM.

13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.

BOLTS 14. TIE-IN POINTS CO-ORDINATES TO BE VERIFIED BY CONTRACTOR IN FIELD.

15. PAINTING / COATING SHALL BE AS PER TB-223080 FOR HARADH AND TB-843596 FOR HAWAIYAH.
16. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-011.
6 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2 5/8 PB1BLDSAD000001 4

1
17.DELETED.
SF HVY HEX NUTS , A194-2HM , DIA
0F2

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
(IMP) X LEN (IMP) - 101.6 mm Length
HOLDS:
1. CERTIFIED VENDOR DATA FOR VALVE / IN LINE INSTRUMENTS / EQUIPMENT.

VALVES / IN-LINE ITEMS

2
SPOOLS TO BE FABRICATED BY VENDOR
7 GATE VALVE , CS A105N , CL800 , SW , 1 PVGC1B80SWE1XNA 1 NO. WEIGHT NO. WEIGHT

3
MARK NO. SIZE MARK NO. SIZE
PIECES LBS PIECES LBS
FOR CONT. SEE B16.11 , MFR DIMS , API 602, OS&Y ,
2
SHT 002
4 BB , STD PORT , SLD WDG , ALLOY 825

5
E 303141787 1"N.B. TRIM W/ STELLITE HF ST , FG PACKING ,
0F2
6
N 2683736646 NACE MR0175/ISO 15156 , HW
3
7
EL +100515 102 TAIL U
FW
1 24
2 105
EL +100491

24
124 8
6 124
7 FW FW SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
24
STEM UP FW FW
NO.
PIECES
MARK NO. SIZE
NO.
PIECES
MARK NO. SIZE

1 24
F01 FLG4 GAS5
2 101
FLG4 GAS5 BLT6
FW 2 1"N.B.

FW
FW
TO OWS
E 303141787
N 2683736133 0F2 REFERENCE DRAWINGS
EL +100366 DRAWING CONTROL SHEET FOR J.O. 10-02029-0003 TD-896993
PIPING PLAN TA-527464
638398-003-SPL-01 P&ID TA-527401.002 0F2
LINE DESIGNATION TABLE TD-527394.103
HYDROSTATIC TEST DIAGRAM TA-638440
PROJECT PIPING MATERIAL SPECIFICATION TE-727826
PIPE SUPPORT STANDARD TE-728359

REVISION VALIDATION

THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

10-02029-0003-001

DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER


(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

AAJ VKP
11/25/2019 11/25/2019
REV.NO. DATE REVISION DESCRIPTION

0F2 11/25/2019 RE-ISSUED FOR CONSTRUCTION

JOB ORDER/EWO NO.


THIS REVISION IS NOT TO BE USED FOR
10-02029-0003 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


DRAWING TYPE
ISO 4"-BD-1166-6CS2P06_02 ISO
HARADH GAS COMPRESSION PLANT-2
DESIGN OPERATING TEST PRESS. TEST RADIOGRAPHY % INSULATION TRACING PAINTING STRESS LINE ID
CHEMICAL
CLEANING TEMP. PRESS. TEMP. PRESS. (PSIG) MEDIUM SHOP FIELD THK. TYPE SYS NO. HARADH GCP-2
(DEG. F) (PSIG) (DEG. F) (INCH.) SAUDI ARABIA
(PSIG) HARADH
0F2 PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

NO 230 1200 0-110 5-55 NOTE-12 WATER NOTE 16 NOTE 16 N/A N/A NO NOTE 15 - BD-1166
521 L TB-638398 003 0F2
Saudi Aramco 2825 ENG. (05/05)

RESTRICTED SMART CADD-03

You might also like