T638398003P0F2
T638398003P0F2
T638398003P0F2
N
AWAY AWAY
Remark: Shop Weld CONSTRUCTION-NOTES AND DETAILS FOR ISOMETRIC PIPING
INSULATION DETAILS FOR HOT PIPING
AD-036627
AA-036911
2. PIPING DETAILS SHALL BE CUT AT ALL POINTS MARKED F.W. (FIELD WELD).
1 90 ELBOW , CS A694-F65 , SW , CL3000 , 1 P9ECO8SWK3B2000 2 3. EACH FABRICATED SECTION SHALL BE CLEARLY MARKED WITH ITS CODE NUMBER.
2 NIPPLE , CS API 5L-X65Q-PSL2 , SMLS , PE 1 PNPCS3SMPEXSTWE 4 5. FABRICATION SHALL BE IN ACCORDANCE WITH SAUDI ARAMCO SPECIFICATION 01-SAMSS-10.
7. PIPING MATERIAL IS
15156
3 FIG-8 BLANK , CS A516-70 , CL600 , RF , 1 PK8C7G60RF0009O 1
PROJ STD DRG , NO AD-036636 PIPE SIZE SCHEDULE SPECIFICATION
FLANGES
4 SW FLG , ITCS A350-LF787 CL.3 , CL600 , 1 PFSC4R60RFXST2A 2
RF , XS , B16.5 , NACE MR0175/ISO NO
8. WELDING STRESS RELIEF - YES
15156 RADIOGRAPHY % 100% X-RAY SPOT X-RAY 01-SAMSS-10 X SHOP FIELD
GASKETS THE SHOP HYDROSTATIC TEST SHALL BE CARRIED OUT ON PIECES HAVING ALL ENDS
FLANGED.
5 GASKET , 316 SS-FG , SPIRAL WOUND , 1/8" 1 PGG154S9260BL01 2 10. ALL PIPING MATERIAL IS IN ACCORDANCE WITH SAUDI ARAMCO ENGINEERING SPECIFICATION
N/A
OUTER RING , CL600 , B16.5 , B16.20 11. INSULATION SHOWN ON DRAWING
13. FOR SMALL BORE LINES (UPTO 1-1/2" ) DIMENSIONS, ROUTING & SUPPORTING SHALL BE FIELD ADJUSTED.
15. PAINTING / COATING SHALL BE AS PER TB-223080 FOR HARADH AND TB-843596 FOR HAWAIYAH.
16. WELDS SHALL BE RADIOGRAPHED AS PER SAES-W-011.
6 STUD BOLT (CONT) , CR-MO A193-B7M , W/ 2 5/8 PB1BLDSAD000001 4
1
17.DELETED.
SF HVY HEX NUTS , A194-2HM , DIA
0F2
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
(IMP) X LEN (IMP) - 101.6 mm Length
HOLDS:
1. CERTIFIED VENDOR DATA FOR VALVE / IN LINE INSTRUMENTS / EQUIPMENT.
2
SPOOLS TO BE FABRICATED BY VENDOR
7 GATE VALVE , CS A105N , CL800 , SW , 1 PVGC1B80SWE1XNA 1 NO. WEIGHT NO. WEIGHT
3
MARK NO. SIZE MARK NO. SIZE
PIECES LBS PIECES LBS
FOR CONT. SEE B16.11 , MFR DIMS , API 602, OS&Y ,
2
SHT 002
4 BB , STD PORT , SLD WDG , ALLOY 825
5
E 303141787 1"N.B. TRIM W/ STELLITE HF ST , FG PACKING ,
0F2
6
N 2683736646 NACE MR0175/ISO 15156 , HW
3
7
EL +100515 102 TAIL U
FW
1 24
2 105
EL +100491
24
124 8
6 124
7 FW FW SPOOLS TO BE FABRICATED BY SAUDI ARAMCO
24
STEM UP FW FW
NO.
PIECES
MARK NO. SIZE
NO.
PIECES
MARK NO. SIZE
1 24
F01 FLG4 GAS5
2 101
FLG4 GAS5 BLT6
FW 2 1"N.B.
FW
FW
TO OWS
E 303141787
N 2683736133 0F2 REFERENCE DRAWINGS
EL +100366 DRAWING CONTROL SHEET FOR J.O. 10-02029-0003 TD-896993
PIPING PLAN TA-527464
638398-003-SPL-01 P&ID TA-527401.002 0F2
LINE DESIGNATION TABLE TD-527394.103
HYDROSTATIC TEST DIAGRAM TA-638440
PROJECT PIPING MATERIAL SPECIFICATION TE-727826
PIPE SUPPORT STANDARD TE-728359
REVISION VALIDATION
THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
10-02029-0003-001
AAJ VKP
11/25/2019 11/25/2019
REV.NO. DATE REVISION DESCRIPTION
NO 230 1200 0-110 5-55 NOTE-12 WATER NOTE 16 NOTE 16 N/A N/A NO NOTE 15 - BD-1166
521 L TB-638398 003 0F2
Saudi Aramco 2825 ENG. (05/05)