Schedule of Reinforcement:: 1. Design Criteria
Schedule of Reinforcement:: 1. Design Criteria
Schedule of Reinforcement:: 1. Design Criteria
DESIGN CRITERIA:
1. THE DESIGN IS ACCORDING TO FOLLOWING CODES:
IRC:5, IRC:8, IRC:21, IRC:78, IRC:6, IRC:112
2. ONE LANE OF CLASS 70R OR TWO LANES OF CLASS 'A' LOADING ON
CARRIAGE WAY, WHICHEVER GOVERNS HAVE BEEN CONSIDERED IN
THE DESIGN. FOOTWAY LOADING OF 500 Kg/Sq.m IS CONSIDERED
FOR DESIGN.
3. TEMPERATURE VARIATION = ±25° C.
4. MODERATE CONDITION OF EXPOSURE CONSIDERED IN THE DESIGN.
2. NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND ALL LEVELS ARE IN
METERS.
2. DO NOT SCALE THE DRAWING FOLLOW WRITTEN DIMENSIONS ONLY.
3. FOR ENSURING PROPER COVER OF CONCRETE TO REINFORCEMENT
SPECIALLY MADE POLYMER COVER BLOCKS SHALL ONLY BE USED.
CHAIRS MADE OF REINFORCEMENT STEEL ARE TO BE USED IN
BETWEEN THE LOWER AND UPPER REINFORCEMENT MESH FOR
PROPER PLPACEMENT OF REINFORCEMENT BARS.
4. WELDING OF REINFORCEMENT BARS SHALL NOT BE PERMITTED.
5. LAPS IN REINFORCEMENT :
a. LAPS SHALL BE STAGGERED AND NOT MORE THAN 50% OF BARS
X SHALL BE LAPPED AT ANY LOCATION.
b. LAP LENGTH SHALL BE 83 x DIA. OF BAR.
6. FOR GENERAL NOTES REFER DRAWING NO. RBL/800/014/24, SHEET NO.
SECTION: 1-1
1/2.
3. SPECIFICATIONS:-
SL. DESCRIPTION GRADE OF MAX. SIZE OF
NO. COMPONENTS CONCRETE AGGREGATE
LONGITUDINAL SECTIONAL REINFORCEMENT OF MAIN GIRDER 1 BRIDGE GIRDER M30 20 MSA
4. SCHEDULE OF REINFORCEMENT :
G3
SECTION: 2-2
SECTION: 3-3
G2
DETAILS: X
DRAWING TITLE :
REINFORCEMENT DETAILS OF MAIN GIRDER & CROSS GIRDER
NAME OF PROJECT :
CONSTRUCTION OF BARRAGE-CUM-BRIDGE (IN-STREAM STORAGE
STRUCTURE) ACROSS BAITARANI RIVER NEAR VILLAGE DHOBABIL
IN JAJPUR DISTRICT OF STATE ODISHA.
CLIENT :
GOVERNMENT OF ODISHA
DEPARTMENT OF WATER RESOURCES,
CONTRACTOR :
G1 (Vimal. Sorathia)
General Manager
DESIGNED BY :
ADVANCE ENGINEERING CONSULTANT
G1 G2 G3 601,6th floor,ABHISHEK BUILDING,SECTOR - 11,
GANDHINAGAR - 382011 Phone : 23243608
SECTION: A-A
BOTTOM REINFORCEMENT PLAN DETAILS: Y DRG. NO : SHEET NO : SCALE : N.T.S.
OF END DIAPHRAGM RBL/501/041/25 1/5
LONGITUDINAL SECTION REINFORCEMENT DETAILS OF END DIAPHRAGM
REVISION. NO :
R0 DATE: 17-10-2024