D - dt.

25/8/04

INSTALLATION INSTRUCTIONS MOUNTING TECHNICAL SPECIFICATIONS TESTING PROCEDURE


FOR VSP D2 OF VSP D2
Your VSP D2 can be Rail Mounted or Panel
TESTING :
Mounted.(See fig. 4A & 4B for mounting it on RAIL .
INTRODUCTION 1. SYSTEM SUPPLY VOLTAGE :
If you need to test the functioning of VSP D2 without connecting it in the control circuit of the motor
and releasing it from RAIL respectively). It is 220 / 230 / 240 / 380 / 415 VAC K 20 % starter, follow the following procedure. Connect required auxiliary supply to VSP D2. Check the output
Thank you for selecting & purchasing suitable for 35mm RAIL ( for panel mounting and relay contacts at (13) & (14). Indication L1 should be ON. Press TEST push button on the front of the
MINILEC make phase failure relay VSP D2.The drilling details see fig.2 ). 2. AUX. SUPPLY : VSP D2. Reset your VSP D2 by either pressing RESET push button on the front plate of VSP D2 or by
shorting terminals (10) & (11) of VSP D2 . If these operations are perfect, connect your VSP D2 in the
following installation instructions would guide 110 / 220 / 230 / 240 / 380 / 415 VAC K 20%
CAUTION motor circuit. Consult Minilec if you find any irregularities in the above mentioned operation.
you in installing your VSP D2 and making best
1) Ensure that your VSP D2 is - 3. FREQUENCY : 50 / (60) Hz, K 3%
use of it.
Start
VSP D2 is a phase failure relay operating on * Not installed near any heat sources like
4. POWER CONSUMPTION : 3 VA ( max.)
negative sequence voltage sensing principle. It burner, sunlight, electric arc etc.

offers protection against * Not subjected to abnormal vibrations. 5. OUTPUT RELAY CONTACT : 2 Changeover
* Installed as near to the starter as possible. See Indication
* Unbalanced voltage condition.
/ sensing (L1,L2,L3) is normaly taken from
2) 3 0 6. OUTPUT CONTACT RATING [ RESISTIVE ] :
* Phase failure condition. 5Amp., 240 VAC
outgoing terminals of motor starter. But in Is it
* Phase sequence reversal condition. Is Check Aux. within the Wait till
following conditions, sensing should be L1 NO supply voltage specified NO supply
Your VSP D2 is an auxiliary relay and it should be
.

7. LIFE EXPECTANCY : ON ? at 7 & 8 of voltage


tolerance
. taken from incoming of motor starter, when 6
0.5 x 10 operations at 100% rating VSP D2 limits? normalizes
used along with the motor starter only. The YES
. VSP D2 is used in Automatic reset mode.
effective working of VSP D2 will depend on Start motor
* Fully automatic starter. 8. UNBALANCE TRIP SETTING : YES
efficient working of the electromagnetic motor
* Multi speed motor starter. 30 to 70V K 6V
starter. Before installing your VSP D2 check
* Reversible starters.
whether the motor starter is operating perfectly by 9. SET ACCURACY : K 10% of set value Does R,Y,B phase
* When any other auto resetting type control NO sequence is incorrect
starting the Motor with the “START” push button starter CONSULT
hold interchange wires MINILEC
switch is used in series with no volt coil of the of 1 & 3 of VSP D2 .
10. TRIP TIME DELAY :
.

and switching it off by “OFF” push button. If the


. starter. 3.5 Sec. K 1.5 Sec.
motor does not “START” or “STOP” on respective
YES
operations, the starter needs to be serviced. Do ELECTRICAL CONNECTIONS OF VSP D2:
11. TEST PUSH BUTTON DELAY : R,Y,B phase sequence
not install your VSP D2 with faulty motor starter. Tighten all terminals
See Fig.1 for Electrical connection 3.5 Sec. K 1.5 Sec connected to VSP D2
in power & control
is correct.
details of VSP D2. wiring & at 1,2&3
TRIP SETTING, TRIP DELAY AND 12. RESETTING : Auto, Manual, Remote Reset of VSP D2
See Fig.3 for installation of VSP D2 in the
. RESETTING 13. RESET GAP : 10 - 18V
power and control wiring. Now remove any one
You can set your VSP D2 relay to trip the starter for Auxiliary supply voltage should be as marked 14. INDICATION : fuse link in power
circuit for all the 3
any unbalance voltage between 30V to 70V K 6V on the front cover plate of VSP D2. L1 : Green - Power ON phases one at a time
Is
between any two phases. Connect the auxiliary supply wires at 7 & 8. L2 : Red - Trip phase to phase
Check phase to phase voltage
unbalance voltage NO
The trip time delay is between 2 to 5 secs. The across 1,2& 3 of VSP D2 after
Connect R,Y,B phases at 1,2 and 3 respectively. 15. ENCLOSURE : ABS. removing fuse link.
less than unbalanced
VSP D2 relay can be set in Auto reset mode or Does setting of
The R,Y, B sensing should be taken from outgoing 16. DIMENSIONS [mm] : VSP D2 trip VSP D2
manual reset and remote reset mode by removing points of motor starter in case of Direct Online Overall : 76 x 56.5 x 117.5 [ LXWXD ] within 2-5 secs
& L2 get ON ? NO
or putting a short link between terminals 11&12. Starter. In case of star delta starters, it should be Mounting : 67 x 46 [ LXW ] YES
VSP D2 will not trip Load
VSP D2 will reset when the unbalance voltage is taken from outgoing terminals of main contactor. YES the motor & retest as per
17. MOUNTING : above procedure.
reduced to less than 20V between all three The output relay contacts 13 and 14 is to be 35 mm Rail Mounting & Panel Mounting
phases. Reset the relay and restart Set the unbalance voltage
connected in series with no-volt coil of the setting at 30 V (minimum) &
18. WEIGHT [gms] : 400 (approx.) reset the relay as per above steps.
contactor. The potential free output relay contact
19. OPERATING CONDITIONS :
16 & 18 can be connected to annunciator or used for VSP D2 operation is perfect.
TEMPERETURE :
0 0
-5 C to + 60 C Install it for permanent use END
trip indication.
HUMIDITY : Upto 95% R.H.
D - dt.25/8/04

CONNECTION DIAGRAM
Fig. 1
INSTALLATION
1 2 3 4 5 6 INSTRUCTION MANUAL
1 R 7 13 16 FOR
PHASE FAILURE RELAY
3 B Y

VSP D2
8 15 18
14 17
2
7 8 9 10 11 12
10 11 12
13 14 15 16 17 18 INDICATIONS :
A / M LINK L1 : POWER ON
DRILLING DETAILS
L2 : TRIP

REMOTE RESET P.B. TERMINAL DETAILS :


1-2-3 : R-Y- B PHASE VOLTAGE SENSING POINTS
7-8 : AUXILIARY SUPPLY VOLTAGE
AS MARKED ON THE UNIT
4-5-6-9 : DUMMY CONTACTS
10-11 : EXT. REMOTE RESET PUSH BUTTON
11-12 : EXT. LINK FOR MANUAL / REMOTE RESET
14-13-15 : 2 CHANGEOVER OUTPUT
17-16-18 : RELAY CONTACTS ( NO - C - NC )

NOTES : RELAY CONTACT SHOWN IN HEALTHY CONDITION.

MOUNTING ON DIN RAIL RELEASING FROM DIN RAIL

Fig. 3

R
Y
B

LINK

VERSION 04
NOTE : RELAY CONTACT SHOWN FOR UNIT IN HEALTHY CONDITION (22/06/04 )