Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

STRUCTURAL DETAILS

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

6" CHB WALL W/ 10mmØ

VERT. & HOR. BAR @ 0.60m

300
O.C. B.W
FFL

0.15m
F1-C1 F1-C1
WF-1

VARIES
CONCRETE WALKWAY SLAB WITH

300
10mmØ RSB @ 0.40m O.C.B.W.
EARTH FILL
100mm THK. GRAVEL BEDDING

300
USE: 10mmØ HOR. BARS

400
EARTH SPACED @ 300mm O.C.
EARTH

300
±2.50 USE: 10mmØ VERT. BARS
SPACED @ 600mm O.C.

150
12mmØ @ 300mm

GRAVEL BEDDING
1 TYPICAL FOUNDATION PLAN
S-2 300
300 USE:4-12mmØ
CONTINUOUS BARS
PLAN
SECTION

3 TYPICAL WALL FOOTING DETAILS


S-2

VARIES
VARIES
VARIES
VARIES

COLUMN SCHEDULE SCHEDULE OF FOOTING


C-1 FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS
FOOTING
MARK BAR X BAR Y
0.20

Length Width thickness depth X Y Z


250 (mm) (mm) (mm) (mm) (mm) (mm) (mm) TOP BOTTOM TOP BOTTOM

F-1 800 800 200 1000 - - - - 4 - 12mmØ - 4 - 12mmØ


250
1000
VARIES

* concrete strength, f'c=24.5 MPa (3500 psi)


* steel reinf. Yeild strength, fy=276 MPa (Gr. 40) for bars

MAIN BAR:
VARIES

4-Ø12mm

TIES : Ø10 mm
100

1@50, 8@75, REST @


150mm TO CENTER
JOINT TIES : Ø10 mm @100mm O.C.

* concrete strength, f'c=24.5 MPa (3500 psi)


* steel reinf. Yeild strength, fy=276 MPa (Gr. 40) for bars
2 FOOTING-COLUMN DETAIL
S-2

You might also like