Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
7 views

Assessment-Task-2 (6)

This document outlines the assessment process for BSBTWK502 Manage Team Effectiveness as part of the ICT60220 Advanced Diploma of Information Technology. It includes guidelines for students on completing assessments, establishing team objectives, facilitating teamwork, and managing performance, along with procedures for re-assessment and academic appeals. Students are required to submit original work, adhere to submission guidelines, and can appeal grades if dissatisfied with their results.

Uploaded by

rkadhikari4341
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Assessment-Task-2 (6)

This document outlines the assessment process for BSBTWK502 Manage Team Effectiveness as part of the ICT60220 Advanced Diploma of Information Technology. It includes guidelines for students on completing assessments, establishing team objectives, facilitating teamwork, and managing performance, along with procedures for re-assessment and academic appeals. Students are required to submit original work, adhere to submission guidelines, and can appeal grades if dissatisfied with their results.

Uploaded by

rkadhikari4341
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Assessment-2

BSBTWK502 MANAGE TEAM EFFECTIVENESS


Student Must Fill this Section
Qualification ICT60220 Advanced Diploma of Information Technology

Student Name:

Student ID: Term: Year:

Privacy
“I give my permission for my assessment material to be used in the
Release
auditing, assessment validation & moderation Process”.
Clause:
“I declare that:
Authenticity  The material I have submitted is my own work;
Declaration:  I have given references for all sources of information that are
not my own, including the words, ideas and images of others”.

Student Signature: Date:

Assessment Outcome

Assessor Name:

Not Yet Assessor


Attempt Satisfactory Date
Satisfactory Signature

Initial attempt  

2nd attempt/Re-
assessment  

WSC-ASSBSBTWK502-V1.0-24032021 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Information for Student:
 All work is to be entirely of the student.

General Information for this assessment:

 Read the instructions for each question very carefully.


 Be sure to PRINT your FIRST name & LAST name in every place that is provided.
 Short questions must be answered in the spaces provided.
 For those activities requesting extra evidence such as: research reports, essay reports, etc. The student
must attach its own work formatted in double space, Arial 12 pts.
 All activities must be addressed correctly in order to obtain a competence for the unit of competency.
 If the student doesn’t understand the assessment, they can request help from the assessor to interpret
the assessment.
 Re-submission of assessment after the term will incur additional fees.

Re-assessment of Result & Academic Appeal procedures:

If a student is not happy with his/ her results, that student may appeal against their grade via a written letter,
clearly stating the grounds of appeal to the Chief Executive Officer. This should be submitted after completion of
the subject and within fourteen days of commencement of the new term.

Re-assessment Process:
 An appeal in writing is made to the Academic Manager providing reasons for re-assessment /appeal.
 Academic Manager will delegate another faculty member to review the assessment.
 The student will be advised of the review result done by another assessor.
 If the student is still not satisfied and further challenges the decision, then a review panel is formed
comprising the lecturer/trainer in charge and the Academic Manager OR if need be an external
assessor.
 The Institute will advise the student within 14 days from the submission date of the appeal. The decision
of the panel will be deemed to be final.
 If the student is still not satisfied with the result, the he / she has the right to seek independent advice or
follow external mediation option with nominated mediation agency.
 Any student who fails a compulsory subject or appeals unsuccessfully will be required to re-enrol in that
subject.
The cost of reassessment will be borne by the Institute. The external assessor will base his/her judgement based
on principles of assessment. These principles require assessment to be reliable, fair, practical and valid.
Academic Appeals:
 If you are dissatisfied with the outcome of the re-evaluation process, you have a right to appeal through
academic appeals handling protocol.
 To appeal a decision, the person is required to complete the WSC- Request for Appeal of a Decision
form with all other supporting documents, if any. This form is available via our website. The completed
Request for Appeal form is to be submitted to the Student Support Officer either in hard copy or
electronically via the following contact details:
Student Support Officer, Western Sydney College (WSC), 55 High St, Parramatta NSW 2150, Email:
info@wsc.nsw.edu.au
 The notice of appeal should be in writing addressed to the Chief Executive Officer and submitted within
seven days of notification of the outcome of the re-evaluation process.
 If the appeal is not lodged in the specified time, the result will stand and you must re-enrol in the unit.
 In emergency circumstances, such as in cases of serious illness or injury, you must forward a medical
certificate in support of a deferred appeal. The notice of appeal must be made within three working days
of the concluding date shown on the medical certificate.
 The decision of Chief Executive Officer will be final.
 Student would then have the right to pursue the claim through an independent external body as detailed
in the students’ complaint / grievance policy.

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Comments/Feedback to Students

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Assessment Task 2: Project Portfolio

Information for students


In this task, you are required to demonstrate your skills and knowledge by working through a
number of activities and completing and submitting a project portfolio.
You will need access to:
 a suitable place to complete activities that replicates a business environment including a
meeting space and computer and internet access
 your learning resources and other information for reference
 Project Portfolio template
 BSBTWK502 Simulation Pack.
Ensure that you:
 review the advice to students regarding responding to written tasks in the Business Works
Student User Guide
 comply with the due date for assessment which your assessor will provide
 adhere with your RTO’s submission guidelines
 answer all questions completely and correctly
 submit work which is original and, where necessary, properly referenced
 submit a completed cover sheet with your work
 avoid sharing your answers with other students.

Assessment information
i
Information about how you should complete this assessment can be found in Appendix
A of the Business Works Student User Guide. Refer to the appendix for information on:
 where this task should be completed
 how your assessment should be submitted.
Note: You must complete and submit an assessment cover sheet with your work. A
template is provided in Appendix B of the Student User Guide. However, if your RTO
has provided you with an assessment cover sheet, please ensure that you use that.

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Activities
Complete the following activities:

1. Carefully read the following:

This project is about leading teams in the workplace and actively engaging with the
management of the organisation. You need to demonstrate that you can manage
the effectiveness of at least one work team.
You can do this based on the assumption that you are the team leader or manager
of a team within the case study business provided in the Simulation Pack for this
unit or a business that you work for, if applicable. It’s important that this business
has organisational objectives already developed. Speak to your assessor to get
approval if you want to base this on your own business.
If you choose the case study business, you may select any of the teams that form
part of the organisation to base your project on. You may assume the role of
manager. If it is your own business, then you may choose any team that forms part
of your workplace and in which you are involved.

Vocational education and training is all about gaining and developing practical skills
that are industry relevant and that can help you to succeed in your chosen career.
For this reason, basing your project on real relationships with classmates or work
colleagues will mean that you are applying your knowledge and skills in a relevant,
practical and meaningful way!

You will be collecting evidence for this unit in a Project Portfolio. The steps you
need to take are outlined below. Before you begin, complete page 5 of your Project
Portfolio.

2. Establish a team

Make sure you are familiar with the business you are basing this assessment on
and have read through the necessary background information, policies and
procedures that apply. For the case study business, this is all of the documents
included in the Simulation Pack. If it’s your own business or a business where you
are working or are familiar with, it’s important at this step that you have your
business or case study approved by your assessor.
If you are using a real business, you will use your current team members to base
this project on. If using the case study in a classroom or online situation, choose a
group of at least three students who will act as your work team throughout the
project. Open the Simulation pack, read through the case study and select the team
you would like to base your assessment on.
Work through Section 1 of your Project Portfolio. As part of this step, you will need
to:
 Specify your work team, or specify which team your group chose if you’re

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


using the case study.
 Outline the roles of each member of the team. If you are using the case study,
each of you will have a turn to be the manager.
 State the purpose of the team

3. Establish team objectives

In a group round-table style discussion with your team and at least one stakeholder
present, outline all the tasks the team must do to accomplish the expected
outcomes.
The discussion should last for at least 15 minutes, but not more than 30 minutes. If
you are using the case study, your assessor will assume the role of stakeholder. If
you are basing the project on your workplace, the stakeholder might be a line
manager or any member of senior management.
Ensure that each team member has a turn to participate in planning the tasks, share
what they expect outcomes will be and decide as a team how performance will be
measured.
As a team, making sure consensus is reached:
 create a list of tasks to be undertaken
 allocate the tasks to the team members based on their strengths and abilities
 set the start and end date for each activity
 set the KPIs for each team member

4. Write a Performance Plan

Use the Internet to find an example of a Performance Plan. Use the information you
recorded in your Project Portfolio during the previous activities to write your own
Team Performance Plan and attach it to your Project Portfolio at the end of
Section1. The written plan should include:
 The team vision or a team purpose statement
 Main tasks and responsibilities of each team member
 Performance measures/ Key Performance Indicators (KPIs)
 Start and end date for each activity

Complete Section 1 of your Project Portfolio and submit to your assessor.

5. Facilitate team cohesion

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Assume some weeks have passed and the team have implemented their
Performance Plan and are working on their tasks. It has come to your attention that
the team is not working cohesively and that they are not sharing information and
are duplicating work.
In order to support your team in achieving their performance outcomes, you will
provide coaching on team cohesion and collaboration. This will be a 10-minute
session and you may use slides, visual aids or video clips in your coaching session.
If you are basing this on the case study, everyone in your group will have a turn to
be the manager and present their coaching to the rest of the group. If this is your
own workplace, this will be the members of your own team that you are providing
coaching for.
The assessor will advise you of the date and time of your team meeting so that you
can prepare in advance.
Use your Project Portfolio to outline the main points and attach your slides or links
to the videos you use.

This can either be viewed in person by your assessor or you may like to video
i record the session for your assessor to watch later. Your assessor can provide you
with more details at this step. Make sure you follow the instructions above and
meet the timeframes allocated.

Complete Section 2 of your Project Portfolio and submit to your assessor.

6. Develop or modify policies and procedures

Despite your efforts to support your team through coaching, the team is still
struggling to work cohesively. One of the issues the team identified is that one of
the team members are not performing their tasks and is using the Internet for
personal reasons during work hours. This is creating conflict within the team.
You will address this concern by developing a policy for Internet usage.
Use the Policy and Procedures Template provided for you in the Simulation Pack
to create an Internet Usage Policy within the context of the business you are
basing your assessment on.
Attach your Internet Usage Policy to your Project Portfolio to Section 2 of your
portfolio.

7. Facilitate teamwork

Assume three months have gone by. Have a meeting and allow each team member
to provide a 5–10-minute update on how their tasks are going.

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Take turns to assume the role as manager and do the following:
 give feedback to team members on team effort and contributions
 encourage team members to take responsibility for team activities
 help to identifying work performance problems by addressing each of the
issues, concerns and problems identified by team members
 help to resolve issues using your own problem-solving skills
Your assessor will be looking to see that you can:
 provide feedback to encourage, value and reward others
 model desired behaviour and practices
 encourage and foster shared understanding of purpose, roles and
responsibilities
 Adapt personal communication style to build positive working relationships
As a team, brainstorm ways to address issues, concerns and problems identified by
team members. Outline a process for addressing these concerns by deciding
where and how concerns should be raised and who should be involved.
Use your Project Portfolio to record this information.

This can either be viewed in person by your assessor or you may like to video
i record the session for your assessor to watch later. Your assessor can provide you
with more details at this step. Make sure you follow the instructions above and
meet the timeframes allocated.

Complete Section 2 of your Project Portfolio and submit to your assessor.

8. Communicating with line management

Develop an email to your line manager to address the main issue raised by team
members, namely that the team is still struggling to collaborate and share
information.
 Outline the issue
 Propose a solution
Attach this email to Section 3 of your Portfolio.
Assume that your line manager has responded to your email and would like you to
communicate the following information to the team:
Line management would like the team to start using a new software application to
help the team collaborate. You have approval to purchase a subscription to a
collaboration tool such as Dropbox, OneDrive or any tool that suits the context, and

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


to implement it.
Develop an email to the team to explain the decision and provide the team with
details about the change including when it will be implemented.
Attach this email to Section 3 of your Portfolio.

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


9. Liaise with stakeholders

Schedule a meeting with the relevant stakeholders and prepare a short


presentation using your choice of software or application e.g., PowerPoint,
Keynote, etc. The meeting should last for at least 15 minutes each and no more
than 30 minutes.
If you are using the case study, your assessor will assume the role of stakeholder.
If you are basing the project on your workplace, the stakeholder will be an internal
or external party that has an interest in the project.
Your presentation should contain an overview of how the project is going.
Your assessor will be looking to see that you can:
 establishing open communication processes with diverse stakeholders
 Address unresolved issues, concerns and problems raised by stakeholders
 demonstrate effective communication skills including:
o Speaking clearly and concisely

o Using non-verbal communication to assist with understanding

o Asking questions to identify required information

o Responding to questions as required

o Using active listening techniques to confirm understanding.

Ask for feedback from relevant stakeholders and take notes. Transfer this
information to Section 3 of your Project Portfolio.

10. Submit your completed Project Portfolio

Make sure you have completed all sections of your Project Portfolio, answered all
questions, provided enough detail as indicated and proofread for spelling and
grammar as necessary.
Submit to your assessor for marking.

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Assessment Task 2: Checklist

Student’s name:

Completed
successfully? Comments

Did the student: Yes No

Establish a team performance plan by:


 Identifying the team purpose, roles,
and responsibilities according to
both the organisational and task
objectives
 Developing performance plans with
expected outcomes, KPIs and goals
for their team
 Supporting team members to meet
their KPIs and goals?

Develop and facilitate team cohesion by:


 Developing strategies for team
members to have input into
planning, decision making and
being involved in achieving team
tasks
 Developing or modifying policies
and procedures for promoting team
member accountability for personal
work and team tasks
 Providing feedback to team
members on their team effort and
contributions
 Developing processes for
identifying and addressing issues,
concerns and problems identified by
team members?

Support the team to meet expected


performance outcomes including
providing formal and informal learning
opportunities as needed?

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Facilitate teamwork by:
 Encouraging team members to
participate in and to take
responsibility for team activities
 Supporting the team in identifying
and resolving work performance
problems
 Promoting work team collaboration
through individual behaviour?

Provide feedback to encourage, value


and reward their team members?

Model desired behaviour and practices


during interactions with their team?

Encourage and foster shared


understanding of purpose, roles and
responsibilities?

Liaise with stakeholders by:


 Establishing and maintaining open
communication processes with
relevant stakeholders
 Communicating information from
line management to the team
 Communicating and follow-up
unresolved issues, concerns and
problems raised by team members
with line management
 Addressing unresolved issues,
concerns and problems raised by
stakeholders?

Manage the effectiveness of at least one


work team?

Communicate effectively with a range of


stakeholders about team performance
plans and team performance?

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M


Task outcome:  Satisfactory  Not satisfactory

Assessor signature:

Assessor name:

Date:

WSC-ASSBSBTWK502-V1.0-24032020 Page |

International College of Australia Pty Ltd T/A Western Sydney College

RTO: 45360 | CRICOS: 03690M

You might also like