Characteristic Performance of PEB Vs CSB
Characteristic Performance of PEB Vs CSB
presentation on
CHARACHTERISTIC PERFORMANCE
OF PEB VS CSB
Presented By
Abhay Murde,
Omkar Rahinj,
Kadam Pawan,
Adhav Sachin
A combination of built up
section, hot rolled section,
cold
formed elements and
profiled sheets
Designing and casting is done
in factory
Building
components
are
brought to site
Then fixed/jointed at the site
All connections are bolted.
A combination of built up
section, hot rolled section,
and profiled sheets
Designing and casting is done
partially or fully factory
Then fixed/jointed at the site
Connections are welded or
bolted which is as per
requirement.
Industrial Buildings
Warehouses
Commercial Complexes
Showrooms
Offices
Schools
Indoor Stadiums
Outdoor Stadiums with canopies
Gas Stations
Metro Stations, Bus Terminals, Parking Lots
Primary Health Centers, Angan wadis
And many more
P E B vs CSB
CONT.
Industrial Building
Railway Station
P E B vs CSB
.
Ware house
P E B vs CSB
Aesthetic Appeal
Faster Completion
Economical
Seismic Resistance
Ease of Expansion
Maintenance Free
Large Clear Spans
Controlled Quality
Hassle Free
Self weight
30% lighter
Primary Member is
tapered section
Secondary members
are light weight rolled
framed Z and C
section
Self weight
More heavy
Primary members
are Hot rolled I
section
Secondary
members are I or
C section which
are heavy in weight.
Delivery average 6 to
8 weeks
Foundation-simple
design, easy to
construct & light wt.
Erection cost and timeaccurately known
Erection process is
easy, fast, step by step
Delivery- average 20
to 26 weeks
Foundation- expensive,
heavy foundation
required.
Erection cost and time20% more than PEB
Erection process is
slow and extensive
field labor is required.
P E B vs CSB
OBJECTIVES OF STUDY
SCOPE OF STUDY
AS
PER
AMERICAN
CODE
:HORIZONTAL
DEFLECTION
=
L/180
&
VERTICAL
DEFLECTION=Eh/100 FOR MAIN FRAMES.
CONTD
Steps of Design
CONCLUSION