Pembangunan Instalasi Pengolah Air Limbah (IPAL) : PT Koneksindo Karya Mandiri

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 7

Pembangunan Instalasi

Pengolah Air Limbah


(IPAL)

PT Koneksindo Karya
Mandiri
Slide 1
Daftar Isi

1. Project Overview
2. Scope Of Work
3. Project Cost
4. Project Cashflow
5. Question & Answer

Slide 2
Project Overview

Nama project : Pembangunan satu unit installatasi


pengolahan air limbah PT Pertamina Persero Refinery unit-4
Cilacap
No. Lelang : S10LL0016A
Lokasi : PT Pertamina Persero Refinery unit-4 Cilacap
Waktu pekerjaan : 300 hari kalender termasuk
commissioning.
Kontrak route : Pertamina RU-4----- Elnusa-Eswerico JO----
KKM
Jumlah kontrak : IDR 5.993.160.000,00
Warranty Period : 90 hari
Kick off meeting : 28 pebruari 2011
SPK (Surat perintah kerja) : 2 minggu setelah KOM
Term of Payment:

Slide 3
Scope of Work

Instrument
Pengadaan Material
PLC & HMI
Control Valve, On-off Valve
Field Instrument
Bulk material
Konstruksi
Semua pekerjaan instrument termasuk comissioning.
Electrical
Pengadaan Material
Transformer
Batterry & Charger
Lighting
Grounding
Fire suppression
Bulk material
Konstruksi
Semua pekerjaan electrical termasuk comissioning.
Slide 4
Project Cost

Slide 5
Project Cashflow (1/2)

Slide 6
Project Cashflow (2/2)

Slide 7