Boiler Design Automation
Boiler Design Automation
Boiler Design Automation
Design Automation
Layouts
Structures
Buckstays
Ducts
Fuel systems
Pressure Parts
Salient Features of 3D model based Boiler engineering using PDMS
FUEL FIRING
CLASH CHECK UPDATION (PIPE ROUTING)
COMPLETED
BOILER
CLASH CHECK UPDATION MOUNTING
(PIPE ROUTING)
PROGRESS
DUCTING
CLASH CHECK UPDATION (SUPPORTS)
YET TO BE
STARTED
SUPPORTING
CLASH CHECK UPDATION STRUCTURES
(SIZING) Pilot
Project in
2010-11
SNAPSHOTS TAKEN FROM THE PIPAVAV MODEL
EXTRACTED DRAWING
SIDE ELEVATION
MODULE-WISE
DRUM LIFTING STRUCTURE
COLUMNS
HORIZONTAL BEAMS
VERTICAL BRACING
MBL FLOOR
NON-MBL FLOOR
CEILING STRUCTURE
BOILER ROOF STRUCTURE
POST & HANGERS
STAIRS
ROOF BRACING
FURNACE GUIDES
FAN HANDLING STRUCTURE
AUTOCAD TO STAAD-3DEngine
STAAD TO STRUCAD (interface programs)
BUCKSTAY AUTOMATION
Detailing Of Boiler Main Columns
Base Plate Detailing
Gusset Plate
PLUS I Column
Bolts
Stiffener
Washer
plate Grout
Holes
Stool
Base
plate
Plate
Shear Lug
weld
Detailing Of Boiler Auxiliary Columns
Base Plate Detailing
Box column
Stiffener
Washer plate
plate
Base plate
Column
Bolts on
beam side
Built-up I with
greater loads
Seating plate
Vertical Bracing Bolted Connection 500MW
Vertical bracing connected to Beam
Gusset
plate
stiffeners
Bridge
plate
Vertical
bracings
Beam
Vertical Bracing Bolted Connection 500MW
Vertical bracing connected to Base Plate
column
Bracing
Gusset
plate
Ear plate
Extended
flange
GA DRAWING
Customization of Floor Arrangement
Detailing of Floor Beam connections
FLOOR GENERAL
ARRANGEMENT
Customization of Roof Structure
BARH Ceiling Arrangement
Ceiling Connections
Interface Program to transfer floor arrangement information
from AUTOCAD to STAAD
2. PRODUCTION DRG.
1. ERECTION DRG.
Automation in Ducting
*Straight duct
*Elbow duct
*Transition duct
II. Automation of Wind box connecting duct through 3D parametric solid modeling in
Unigraphics NX 5 (210/250/270MW).
Features:
1. Developed in VBA-Autocad.
2. All drawings are true-scale drawing.
3. Generate Straight duct detailed drawing for 60MW-800MW
Boilers.
4. Automatic selection of stiffener spacing & sizing for all four walls.
5. Automatic selection of internal truss pattern based on duct size.
6. Includes all variations like opening, corner construction, end connection
detailed, splicing.
7. Cycle time reduction.
Deliverables:
Features:
1. Developed in VBA-Autocad.
2. All drawings are true-scale drawing.
3. Generate Elbow duct detailed drawing for 60MW-800MW
Boilers.
4. Automatic selection of stiffener spacing & sizing for all walls.
5. Automatic selection of internal truss pattern based on duct size.
6. Includes all variations like opening, corner construction, end connection
detailed, splicing.
7. Cycle time reduction.
Deliverables:
Features:
1. Developed in VBA-Autocad.
2. All drawings are true-scale drawing.
3. Generate Transition duct detailed drawing for 60MW-270MW
Boilers.
4. Automatic selection of stiffener spacing & sizing for all walls.
5. Includes all variations like corner construction, end connection detailed,
splicing.
7. Cycle time reduction.
Deliverables:
Features:
1.Design rules & programming in Knowledge Fusion(KF).
Deliverables:
* Basically a pdf file containing 2D erection welding detail drawings with isometric 3D view of welding details.
* Hyper-links to dynamic 3D models of the respective erection drawings.
*3D dynamic PDF files of the parts that are to be welded on site can be rotated, zoomed in/out and cut to view the
minute details.
*System requirements : Acrobat reader 8 or above. Memory needed -25MB
* Hosted in our QUEST website
Split options:
SYSTEM DESIGN:
DETAILED DESIGN:
#Material specifications,
Fin welded attachments, shape
1 √ √ √ √ #
panels changes of panel to be
altered for OTSG design.
1/2 Coil
#Configuration and Panto
Economiser
2
with Panto
# √ √ NA NA supports to be modified for LEGEND:
Industrial boilers.
type supports
Completed
Fusion welded
3 NA √ √ √ NA _
panels
Yet to be taken
3/4/6 Element #Support design to be
4 NA √ √ √ #
Horizontal coils modified for OTSG design.
P In progress
#Tappings, attachments to
5 Downcomers NA √ √ √ # be incorporated for OTSG
design.
Pilot Project under
6 Headers P P P P P progress (Solid Modeling
Approach)
#New programs to be
7 Radiant roof NA # √ √ #
developed.
#New code to be
Pendant Platen
8 # P P P # developed for
coils
configuration changes.
Pendant RH #New code to be
9 coils for single NA # P P # developed for
stage configuration changes.
Product Automation Plan
Area: Pressure Parts
Applicability
Product/ 660/800
S.No. Industrial 110/120/1 210/250/2 500/600 Remarks
Arrangement MW OTSG
Boilers 50 MW 70 MW MW
design
Arrangement of Completed
Downcomer, #New code to be developed for
12 # # # √ #
Circulating pump configuration changes.
& Discharge line
Yet to be taken
Pressure parts
expansion #New code to be developed for P In progress
13 # √ √ √ #
movement configuration changes.
diagram
Salient benefits
Error free Schemes generated
Generation of KKS coding for both OLD
and NEW system
Valve schedule generation -No
manual intervention for valves
selection.
Overall cycle time reduction from
30 days to 4 days
PPA- General Arrangement Drawing automation
Salient benefits
Engineering cycle time reduction
Error-free Generation of drawings.
Drawing stored in data form – information /
data can be retrieved at any point of time for
further design usage.
SENEGAL 125 MW
• Modeling of pressure part components (Headers, Links and Tubes)
• Extraction of 2D drawing from 3D model
• Completed in a short span of 42 days
Design / Manufacturing
Status review
Excel Output – fit enough for submission; Calculations are locked for editing
Automation of Water Wall Panels for Utility Boilers
Input Form