BOILER
In General, A boiler is a closed pressure vessel strongly
constructed of steel or iron where water is converted to steam
by application of heat.
According Indian Boilers Act, 1923, -
“Boiler" means a pressure vessel in which steam is generated for
use external to itself by application of heat which is wholly or
partly under pressure when steam is shut off but does not
include a pressure vessel,-
(i) with capacity less than 25 litres (such capacity being measured
from the feed check valve to the main steam stop valve);
(ii) with less than one kilogram per centimetre square design
gauge pressure and working gauge pressure; or
(iii) in which water is heated below one hundred degrees centi-
grade;
Monnet Power Company Ltd 2
Usage of Boiler
 In Power Sectors
 In Independent Power Plant(IPP) &
Captive Power Plant(CPP).
 In Process Plants
 In Oil Refineries, Paper Industry, Sugar
Industry, Chemical Industry, Rice mill,
Steel Industry etc.

Monnet Power Company Ltd 3


Criteria Types
Content of Tube Fire Tube Boiler, Water Tube Boiler

Type of firing Solid, Liquid & Gas Fired

Type of Circulation Natural Circulation, Natural Assisted or


Controlled Circulation, Forced
Circulation
Steam Pressure Sub Critical Boiler, Super Critical Boiler

Draught Natural Draught, Mechanized


Draught(Forced, Induced, Balanced)

Monnet Power Company Ltd 4


Content of Tubes

Fire Tube Water Tube

In fire tube boiler hot flue In water tube boiler
gas will be moved inside the
water will be moved
tubes & water outside the
tube. inside the tube & hot flue
In fire tube boiler mode of gases outside the tubes.
firing is generally internally Mode of firing is
fired. externally fired.
In fire tube boiler operating Operating pressure can
pressure limited to 25 kg/cm² exceed 125 kg/cm² or
more

Monnet Power Company Ltd 5


FIRE TUBE
BOILER

WATER TUBE
BOILER

Monnet Power Company Ltd 6


Type of Firing
Solid Liquid Gas

AFBC CFBC PC Fired WHRB

Atmospheric Circulating Pulverized Waste Heat


Fluidized Bed Fluidized Bed Coal Fired Recovery Boiler
Combustion Combustion
Bed Material Used Boiler. Waste Heat
Bed Material Used -
– Crushed Coal : F from Flue Gas
Crushed Refractory (
Refractory( + 0.8
+ 0.8 mm to -2.8 mm) Grade(3000- of Other
mm to -2.8 mm) 3500 Kcal/Kg) process used in
Velocity – 3-5  Velocity – 7-8 m/s.
m/sec Coal – F-Grade, Size is 65µto boiler for Steam
Coal – F-Grade, Washery Reject 80µ. generation
Washery Reject  Combustion Eff.- No Bed is
Combustion Eff- 95 % Required
80-85%
Combustion
Eff : 99 %
Monnet Power Company Ltd 7
AFBC CFBC

WHRB PC Fired

Monnet Power Company Ltd 8


Type of Circulation

Natural Assisted/Controlled Forced


Circulation Circulation Circulation

Density Beyond 175 kg/cm2(g) Mechanical


pressure in a re circulation
Difference is the system, circulation through pumps are used to
driving force. the evaporator is to be over come the
Limited to boiler assisted with mechanical
frictional losses
pumps to overcome
with drum frictional losses in the Operating
operating tubes. A pump called boiler pressure is above
circulation pump will be
pressure around placed in the down comer
224.6 kg/cm2(g)
175 kg/cm2(g). between the Drum & water
wall ring header to do this
function is called
controlled circulation.

Monnet Power Company Ltd 9


SH
SH
SH

Separator

ECO Drum ECO Drum


Water
from
Feed
Station

Furnace Furnace BCP


Wall Wall WW

CC
Pump

Distribution Distribution Economiser


Header Header

Natural Assisted
Forced Circulation
Circulation Circulation
Monnet Power Company Ltd 10
Steam Pressure

Sub Critical Boiler Super Critical Boiler

Boilers Operating below the Boilers Operating above Critical


Critical Pressure(224.6 Pressure (224.6 kg/cm2(g)) &
kg/cm2(g)). Critical Temp (374 0C)
These are recirculation type or These are only Once Through
once through . Type.
Steam Drum is required to Drum is not required as cycle
separate water & steam. medium is a single phase fluid
having homogenous property.

Monnet Power Company Ltd 11


DRAUGHT
Natural Draught Mechanized Draught

Forced Induced Balanced

The draught
Here Fans are Fans installed at Both Forced
required for the flow used to draw air the outlet of
& Induced
of air & gas inside from atmosphere boiler, evacuate
the gases from draught fans
the boiler is created & push into the
furnace. furnace. So a are used to
by chimney alone The entire boiler negative Pr. Is derive the
will be kept developed in benefits of
above furnace & air from
atmosphere enters both systems.
atmospheric
the furnace
pressure

Monnet Power Company Ltd 12


Boiler Mountings
 Safety Valves
 Feed Check Valves
 Pressure Gauge
 Drum Water Level gauge
 Blow Down Valve
 Main Stop Valve…etc

Boiler Mounting are basically used for safe operation of


Boiler.

Monnet Power Company Ltd 13


Description of Boiler Mountings
 Safety Valve : The Function of a safety valve is to blow off steam when the pressure in

the boiler exceeds the working pressure.

 Feed Check Valve : A feed check valve is used to control the supply of feed water to

boiler & also to act as a non-return valve.

 Pressure Gauge : Pressure gauge indicates the pressure of steam in a boiler.

 Drum Water Level Gauge : The Function of water gauge glass is to indicate the water

level in the Drum.

 Blow Down Valve : Blow down Valves are designed for continuous use to control the

concentration of dissolved solids in boiler water.

 Main Stop Valve : Function of a steam stop valve is to stop or allow the flow of steam

from the boiler to Main Steam line.


Monnet Power Company Ltd 14
 Maker : Bharat Heavy Electricals Ltd
 Boiler Maker No : 0675,0676
 Type : Controlled Circulation, Sub Critical, Two Pass, Single Reheat,
Balance draught, Tangential PC Fired.
 Boiler Rating : 51793 m2
 Boiler Drum Design Pressure : 210 kg/cm2(g)
 Boiler Hydrotest Pressure : 315 kg/cm2(g) ,(For RH-78 kg/cm2(g) )
 Boiler Drum Design Temp : 369 OC
 Steam flow at SHO: 1700TPH
 Steam pressure at SHO: 192.2 kg/cm2(g)
 Steam temperature at SHO: 540OC
 Reheat Steam flow: 1468.1TPH
 Steam pressure at RHI: 52.4 kg/cm2(g)
 Steam temperature at RHI: 337OC
 Steam pressure at RHO: 52.4 kg/cm2(g)
 Steam temperature at RHO: 540OC
Monnet Power Company Ltd 15
 Boiler Efficiency: 86 %
Boiler Pressure parts
The Following parts generally comes under this category –
• Drum
 Economiser
 Water Walls
 Radiant Roof Tubes
 Steam Cooled Walls
 LTSH Coil
 Div Panelette SH
 Platen SH
 Rehaeter Coil Assy.
Monnet Power Company Ltd 16
RH O/L Hdr

Monnet Power Company Ltd 17


Monnet Power Company Ltd 18
Water Circuit
Feed
Water
Station

ECO Feed ECO I/L ECO O/L ECO


ECO Coil
Pipe Header Header Link

Water Wall Water Bottom


Down
Outlet Wall Ring DRUM
Comer
Headers Tubes Header

Monnet Power Company Ltd 19


BOILER DRUM
 In a Sub-Critical re-circulation boiler, the
drum plays an important role. In the erection
of a Power Boiler, the lifting of the Boiler

Monnet Power Company Ltd


Drum is the first mile stone activity.
 The Functions of Drum are
 Separation of saturated steam from the steam-
water mixture produced by evaporating tubes.
 Mixing feed water from economiser and water
separated from steam-water mixture, and re-
circulate through the evaporating tubes
 Carrying out blow down for reduction of boiler
20
water dissolved solid concentration.
 Treatment of Boiler Water by chemicals
TECHNICAL DATA OF DRUM
Design Pressure 210 kg/cm2(g)

Operating Pressure 197 kg/cm2(g)

Water Holding Capacity 60 m3

Monnet Power Company Ltd


Design Temperature 369 0C

No of Cyclone Separator 92(46X2)

No of Secondary Drier 124

OD of Drum 1778 mm

Thickness 155 mm
(Straight Portion/Dished Portion)
Weight of Drum without Internals 214.7 MT 21
3 SH
Conn
Pipe 4
Stubs

5
Riser
6
1

Monnet Power Company Ltd


Stub
Safety
Valve DC
Stub
2 Nozzle
Feed
Nozzle

Taping No Details Qty(In Nos)


1 DWLG & EWLI 15 (Both Side)
2 Test Tapings 4
3 Air Vent 2
4 Chemical Feed Nozzle 1
22
5 DWLG & EWLI 15 (Both Side)
6 CBD 1
The main components of Boiler Drum:
 Turbo separator
 Screen Dryer
 Baffle Plate
 Anti Vertex Spider

Monnet Power Company Ltd


STAGES OF STEAM & WATER SEPARATION :
 Separation takes place in the concentric cylinder of Turbo separator.
 The second stage of separation takes place in the corrugated sheets
connected to the top of the Turbo separator.
 The third and final stage of separation takes place in Screen Driers.
 The Anti Vertex spider is provided at the inlet of Down comer to avoid
whirl formation in DC.

23
Drier Assembly(62X2)
Drum Internals of MPCL Boiler

Turbo
Separator
(2X46)

Separating
Chamber

Feed Header
Feed Nozzle
Monnet Power Company Ltd 24
DC Nozzle
TURBO SEPERATOR

Monnet Power Company Ltd 25


Economiser System
O Application of economisers is to capture the heat from flue
gas and transfer it to the feed water. This raises the
temperature of the boiler feed water, lowering the needed
energy input, in turn increases efficiency.
O Total System Consists of ECO feed line, Eco I/L Header, ECO
Coil Assy, ECO O/L Hdr, ECO Link to Drum.

TECHNICAL DATA
No of Banks 3 Banks( 92 Sets)

Total Heating Surface of ECO 20,000 Sq. Mtr


System
Total Water Holding Capacity 150 m3

Monnet Power Company Ltd 26


Description Size Design Temp( 0C) Design Pressure
(DiaXThick) (kg/cm2(g))
(In mm)

ECO Feed Pipe 457.2X50 283 219.7

ECO Inlet Header 508X65 283 215

ECO Coil 38.1X4.5 336 215

ECO Outlet 406.4X60 353 210.8


Header

ECO Link to 368X40 357 210.8


Drum 323.9X36

Monnet Power Company Ltd 27


ECONOMISER COIL

Monnet Power Company Ltd 28


Water Wall System
O The water walls are tube panels through which the
water for steam generation will be circulated. In Water
Wall only heat is added to evaporate the feed water to
steam.
O It also forms the major part of furnace enclosure.
TECHNICAL DATA
Design Temp & Pr. at WW Inlet 3680C & 212 kg/cm2(g)
Hdr
Design Temp & Pr. at WW Outlet 3680C & 209 kg/cm2(g)
Hdr
Total Heating Surface of WW Tubes 7000 Sq.Mtr
Water Holding Capacity of 170 m3
Circulating System
Monnet Power Company Ltd 29
Description Size Design Temp( 0C) Design Pressure
(DiaXThck) (kg/cm2(g))
(In mm)
Down Comer 368X36 368 212

Bottom Ring 914X85 368 212


Header
WW Tubes 51X5.6/6.0/7.1 396 214
63.5X7.1
Front, Hanger Tube & 273X40 368 209
Screen Tube O/L
Header
Side WW O/L 273X50 368 209
Header
Riser Pipes 159X18 368 209

Monnet Power Company Ltd 30


Platen
SH

WW
Panels
Div
SH
Panel

Monnet Power Company Ltd 31


CC PUMP
Boiler water circulating pump is used in
high capacity boiler (Super critical or Sub
critical), It assists the circulation of water, to
overcome the friction losses in Boiler.

Make : Torishima
Type : Single Suction-Double discharge
No of Pumps : Three
Design pressure : 210 kg/cm2(g)
Hydr0 test pressure : 315 kg/cm2(g)
Design Temperature : 366 oC
Motor Rating : 350 KW
Full Load Speed : 1450 rpm
Suction Pressure : 197kg/cm2(g)
Quantity Pumped : 48453 l/min(2850 tph)
Wt. of Motor : 7300 kg
Wt. of Pump casing : 5200 kg
Monnet Power Company Ltd 32
Saturated Steam Circuit
Risers
Sat Steam

Rad Roof Fur Roof SH Roof BP L/R Side


DRUM I/L Hdr Panel O/L Hdr Upp Hdr
SH Conn
Pipes

SH Rear BP Front SH BP BP L/R


BP Front
Roof Lower Lower Side Side Wall
Wall Front Hdr
Tubes Hdr Panel

SH Rear ECO
Junction SH Rear
Support
Hanger
Hdr Int. Hdr
Tube Tube

BP Lower
BP Upper LTSH I/L BP Lower BP Lower
Rear Wall Rear Hdr
Side Rear
Rear Wall Hdr Hdr

Monnet Power Company Ltd 33


Saturated Steam Circulation System
Description Size Design Temp Design Pressure
(DiaXThick) ( 0C) (kg/cm2(g))
(In mm)
Rad Roof Inlet Header 273X50 369 208.8

Fur Roof Panel 57X6.0 414 208.8

Rad Roof O/L Hdr 406.4X55 369 208.2

BP L/R Side I/L. Hdr 368X48 368 208.0

BP L/R Side Panel 63.5X6.3/7.1. 393 208.0


51.0X5.0/5.6
SH BP Lower Side 406.4X60 393 207.4
Front Hdr
SH BP Front Lower Hdr 406.4X60 393 207.4

BP Front Wall 51X5.0/5.6 393 207.4


63.5/6.3
BP Front Hanger Tubes 51X6.3 394 207.4

Monnet Power Company Ltd Contd.. 34


Description Size Design Temp Design Pressure
(DiaXThck) ( 0C) (kg/cm2(g))
(In mm)
SH Rear Roof Panel 51X5 394 206.8

SH Rear Junction Hdr 273X50 395 206.7

BP Rear Upper Wall 51X5 395 206.7

BP Lower Side Rear Hdr 323.9X50 393 206.3

BP Lower Rear Hdr 323.9X45 393 206.3

BP Rear Lower Panel 44.5X5 394 206.3

ECO Support Tubes 44.5X7.1 393 207.4

SH Inter. Hdr 219.1X28 393 207.3

SH Hanger Tubes 51X11 394 207.2

• Total Heating Surface of SH Roof – 830 Sq Mtr


• Total Heating Surface of Steam Cooled Wall – 2010 Sq. Mtr

Monnet Power Company Ltd 35


Superheated Steam Circuit
LTSH
I/L Hdr

LTSH LTSH SH DESH Div SH


Coil O/L Hdr Link I/L Hdr

SH Vertical SH Div SH Div


Div SH
Platen I/L Panel O/L Panelette
Hdr Links O/L Hdr Assy

MS Line

SH Vertical SH Platen HP
Platen Assy O/L Hdr Turbine

MS Line
Monnet Power Company Ltd 36
Super Heater System
O Superheater is a component of a boiler that superheats steam i.e. heats
steam above its saturation temperature. Superheated steam contains
more thermal energy and increases the overall efficiency of the cycle.
O There are 3 stages of Super Heaters – LTSH, Divisional Panelette SH &
Platen Super Heater.

TECHNICAL DATA

No of Sets LTSH-62 Sets, Divisional SH- 24 Sets,


Platen SH – 25 Sets

Total Heating Surface LTSH -10,100 m2, Div SH -2025 m2,


Platen SH – 2200 m2

Total Water Holding Capacity of SH 130 m3


system
Monnet Power Company Ltd 37
Superheater System
Description Size Design Temp( 0C) Design Pressure
(DiaXThick) (kg/cm2(g))
(In mm)
LTSH I/L Hdr 323.9X50 395 205.8

LTSH Horizontal 47.63X5.6 445 205.8


Assy.

LTSH Terminal Tube 47.63X5.6 464 205.8


Assy

LTSH O/L Hdr 457.2x65 435 204.2

SH DESH Link 508x60 440 204.0


558x60 426

SH Div I/L Hdr 406.4X60 419 202.8

Monnet Power Company Ltd Contd.. 38


Description Size Design Temp( 0C) Design Pressure
(DiaXThick) (kg/cm2(g))
(In mm)
SH Div. Panelette 44.5X5 483/ 202.8
Assy 44.5X7.1 522

Div. SH O/L Hdr 406.4X70 487 198.9

SH Div Panel O/L 508X60 487 198.6


Link

SH Vertical Platen 406.4X60 487 197.4


I/L Hdr

SH Vertical Platen 63.5X6.3/12 476/533 197.4


Assy 51X6.3/11 476/551

SH Platen O/L Hdr 508X110 540 192.2

Monnet Power Company Ltd 39


LTSH COIL

Monnet Power Company Ltd 40


Div SH Panel

Monnet Power Company Ltd 41


Platen SH

Monnet Power Company Ltd 42


Reheater Circuit
CRH
Line From
HP
Turbine
Exhaust

RH O/L Hdr (F)


RH I/L RH Coil
Hdr Assy
RH O/L Hdr (R)

HRH
Line
IP
Turbine

Monnet Power Company Ltd 43


Reheater System
O Reheater is a boiler component in which heat is added to
intermediate-pressure steam, which has lost some of its
energy in expansion through the high-pressure turbine.
O Reheater System comprises of : RH Inlet Header, RH Front
Platen Coil Assy, RH Rear Spaced Assy, RH Outlet Header
TECHNICAL DATA
No of RH Coil Assy 74 Sets (Both Front & Rear)
Total Heating Surface of RH Coils 7628 Sq. Mtr
Total Water Holding Capacity of RH 105 m3
Design Temp. & Pr. at RH Inlet Hdr 361 0C ,52.4 kg/cm2(g)
Design Temp. & Pr. at RH Outlet Hdr 540 0C,52.4 kg/cm2(g)
Size of RH front Coil Assy 63.5 mm Dia X 4 mm Thck
54 mm Dia X 4.5 mm Thck
Size of RH Rear Coil Assy 54 mm Dia X 4.5 mm Thck
Monnet Power Company Ltd 44
RH Coil Assy

Monnet Power Company Ltd 45


H.
R.
M.S C.R.H H

Boiler
Drum

RH
Platen Coil
Assy
SH

DC

LTSH

CC Div SH
Pump
ECO Coil

Furnace Wall
FROM F.C.S

WATER
SATURATED STEAM
SUPER HEATED STEAM
Monnet Power Company Ltd 46
REHEATED STEAM
Bottom Ring Header
Air Flow path
PA Fan FD Fan FD Fan PA Fan

Cold
Cold PA
PA to
SCAPH SCAPH
to Mill
Mill

Pri. Flue Sec Sec. Flue Pri.


Side Gas Side Scanner Side Gas Side
Air fan
APH APH

Hot PA Wind Box Hot PA


to Mill to Mill
Monnet Power Company Ltd 47
Forced Draught Fan
• These fans supply air necessary for fuel combustion for proper
burning of the specific fuel. These are generally axial type.
• The FD fans supply secondary & over fire air, which is preheated in
secondary sector APH.
• Over fire air can be admitted to the furnace through the upper
levels of furnace wind box nozzle to assist in reducing the amount
of NOx formed in furnace.
• Control of airflow to WB is effected by FD fan blade pitch control
& distribution of secondary air to WB compartments is controlled
by secondary air damper.
• Steam Coil Air Pre Heater(SCAPH) are provided in the by pass
ducts before each APH to prevent corrosion of cold end of APH
normally at start up & low load operation.

Monnet Power Company Ltd 48


Suction
Chamber

Blades

Diffuser
Forced Draught Fan
Monnet Power Company Ltd 49
Monnet Power Company Ltd 50
Primary air fan
 These fans supply the air needed to dry & transport coal from
coal mills to the furnace. These fans are generally axial type of
fan.
• To achieve the required temperature at mill inlets(For Proper
Drying of Coal) , part of air(Tempering air) by passes the APH &
is mixed with hot air coming out of APH.

 The PA Fan blade pitch is modulated to maintain a pre


determined pressure in pulveriser hot air bus duct.

 Mill Air flow is maintained by adjusting the hot air regulating


damper while the mill outlet temp is maintained by adjusting the
cold air regulator damper. Venturi is provided in the mill inlet
duct to measure the individual mill air flow.

Monnet Power Company Ltd 51


Suction
Chamber

Diffuser Assy.

Primary Air Fan


Monnet Power Company Ltd 52
1st Stage
Blade

2nd Stage
Blade

Primary Air Fan


Monnet Power Company Ltd 53
Technical specification of Fans
Description Unit PA Fan FD Fan
Make N.A. BHEL BHEL
Type N.A. PAF 19/10.6-2 FAF 23/12.5-1
Motor Rating KW 3600 1200
Capacity M3/Hr 105 215
Speed rpm 1490 990
Pressure mmwc 1290 410
Temp of Medium 0C 50 50
Handled
Bearing N.A. Oil Lubrication(ISO Oil Lubrication(ISO
Lubrication VG68) VG68)

Monnet Power Company Ltd 54


Air Pre Heater
 The purpose of APH is to recover heat from the boiler
flue gas & heat air before another process and so as to
increase the thermal efficiency.
Ljungstrom (Regenerative) Air Pre Heater:
 The basic component of Ljungstrom APH is a continuously
rotating cylinder, called rotor, that is packed with
thousands of square feet of specially formed sheets of heat
transfer surface.
 As the Rotor revolves, waste heat is absorbed from the hot
flue gas passing through one half of the structure. The heat
transfer cycle is continuous as the surface are alternatively
exposed to the outgoing gas & incoming air stream.
Monnet Power Company Ltd 55
Monnet Power Company Ltd 56
Technical Data
Description Value

Type Regenerative, Trisector

No per Boiler Two

Rotor Diameter 6789 mm

Arrangement Vertical

Heating Surface Area 84200 M2

Main Drive 18.5 KW,1500 rpm

Aux. Drive Air Motor with gear box & muffler, Air consumption
8 Nm3/min at pressure 6.33 kg/cm2(g)

Monnet Power Company Ltd 57


Soot blowers
 As the flue gas moves over the heat transfer areas of
boiler, the ash deposits on the heating surfaces. This is
known as soot deposit. Soot Blowers are installed to
blow away these soot deposits to facilitate smooth heat
transfer.
 There are two types of Soot Blowers-Wall Blowers &
Long Retractable Soot Blowers.
 Wall Blowers are used to blow off soots deposited in
water walls in furnace
 LRSB are used in Super Heaters, Economiser &
Reheater Zone.

Monnet Power Company Ltd 58


WALL
BLOWER

LRSB

Monnet Power Company Ltd 59


WALL BLOWER
Monnet Power Company Ltd 60
Technical Data
Description Unit Wall Blower LRSB
No per Boiler No. 88+16(Future) 40+18(Future)
Travel mm 305 9700
Blowing Pressure kg/cm2(g) 11 12.5/10.5
Blowing Steam Temp 0C 383 383
Speed of Travel mpm 6.1 1.55
Speed of Rotary rpm 0.7 5.87
Blowing Rate per group Kg/min 89 152/93/79
Blowing time per group Min 1.4 12.04
Operating time per cycle Min 66 75.12/325.52/100.16
Steam Consumption per cycle Kg 5500 47708
Steam Consumption Kg 62.5 1192
/Cycle/Blower
Total Steam Consumption per Day Kg 159624
Blowing Steam Temp & Pr. 383 0C & 30 kg/cm2
Cycles per Day No 3 3
Blowing Angle Deg.
Monnet Power Company Ltd 3600 3600 61
14 kg/cm2(g)
250 0C
LDO & HFO Circuit
LDO cap.-50m3/hr HFO cap.-50m3/hr Unloading
& Pr.- 2 Kg/cm2
LDO HFO & Pr.- 5 Kg/cm2 Pump
PRS Pumps Pumps
House

4.5 kg/cm2(g)
232 0C

Tanker 1
12KL

Tanker 2
12KL HFO HFO Contd..
Tank #1 Tank #2
3000 m3 3000 m3
Tanker 3
12KL

Tanker 4
12KL

LDO LDO
Tanker 5 Tank#1 Tank#2
1000 m3 1000 m3
12KL
LDO Unloading Header
HFO Unloading Header
Tanker 6 LDO Discharge Line
12KL
HFO Discharge Line
Steam Line to Tanks
Monnet Power Company Ltd 62
Condensate Line to Flash Tank
LDO & HFO Circuit
1x100 % Forwarding Pump House
LDO Pump
LDO Set(Both
Tank Units)

2X1000 m3
HFO Pump
Set(Unit I)
Boiler I Boiler II
HFO 2x100 %
Tank
HFO Pump
Set(Unit
2X3000 m3 II)

HFO
Heater-1

Steam Steam
HFO Tracing Tracing
Line Line
Heater-2

14 kg/cm2(g)
210 0C Aux. Steam
HFO Drain
System

Condensate Line to
Monnet Power Company Ltd Nearest Trench 63
Technical specification of hfo & Ldo
Description Unit LDO HFO
Standard N.A. IS 1460-1974 IS-1593/1971/Gr HV/Oil

Flash Point 0C 66 66

Pumping Temp. 0C 35 55

Firing Temp. 0C 35 120

Viscosity cst 2 to 20 @Firing Temp. 180 at 55 0C

Total Sulphur N.A. 1.8 % by weight 4.5 % by weight

GCV Kcal/kg 10720 10270

Sp. Gravity at 15 0C N.A. 0.85-0.87 0.85-0.95

Monnet Power Company Ltd 64


Technical specification of HFO & LDO Forwarding
Pumps
Description Unit LDO Pump HFO Pump
Make N.A. Alekton Alekton
No of Pump per Blr No 01(Common for 01
Both Unit)
Model No. N.A. DH 330-770-3 DH 600-1400-3 SJ
Capacity at max cst lpm 281(14.3 tph) 879(50.1 tph)
Speed rpm 2920 1450
Suction Pressure kg/cm2(g) -0.5 -0.5
Delivery Pressure kg/cm2(g) 25 30
Motor rating KW 18.5 75
Motor Make N.A. Crompton Greaves Crompton Greaves
Bearing Lubrication N.A. Grease IS 719 Gr.3 Grease IS 719 Gr.3
Pump Efficiency(at min cst) % 78 83.7

Monnet Power Company Ltd 65


TT burners assy.
OVER FIRE AIR
UPPER HFO OIL BURNERS
OVER FIRE AIR Service Ignition of Pulverised Fuel, Stabilization of
LOWER
Coal Flame at lower loads etc.
HH END
AIR Capacity Maximum 30 % MCR
H COAL No of Oil Guns 16(4 per elevation)
GH OIL+AIR Locations Aux air nozzles AB,CD,EF & GH

G COAL HFO flow per Gun 2420 kg/hr(Max), 950 kg/hr(Min)

FG AIR HFO Pressure 10.5 kg/cm2(g)(Max), 4.0 kg/cm2(g)(Min)

F COAL Atm. Steam Flow/Gun 250 kg/Hr

EF OIL+AIR At. Steam Pr. 5.25 kg/cm2(g)

E COAL

DE AIR
D COAL
LDO OIL BURNERS
Service Initial startup & warm-up.
CD OIL+AIR
Capacity Maximum 7.5 % MCR
C COAL
No of Oil Guns 4(In One Elevation)
BC AIR
Locations Aux air nozzle AB
B COAL
LDO flow per Gun 2420 kg/hr(Max), 950 kg/hr(Min)
AB OIL+AIR
LDO Pressure 10.0 kg/cm2(g)(Max), 3.5 kg/cm2(g)(Min)
A COAL
Atm. air Flow/Gun 241 kg/ Hr
END
AIR
AA At. air Pr. 5.25 kg/cm2(g)

Monnet Power Company Ltd 66


Coal Circuit
Coal
To four
From
corners
CHP
Coal of
Bunker Boiler

Feeder Pulveriser

Monnet Power Company Ltd 67


Flue gas path
1404 0C 1150 0C 1040 0C 904 0C 7100C

Combustion Platen RH LTSH


Chamber Div SH
SH Coil Coil

ESP
Pass A
3340C 1270C ID
APH Fan
C
541 0C ESP H
Pass B I
M
Economiser N
ESP
E
Pass C Y
ID
Fan
127 0C
APH ESP
3340C Pass D
Monnet Power Company Ltd 68
Flue Gas Path

-19 mmwc

C
-33 mmwc H
I
M
N
E
-5 mmwc -79 ESP Y
-270 +32
mmwc
-213 mmwc mmwc
mmwc

APH

Monnet Power Company Ltd 69


• Electrostatic Precipitator : An electrostatic
precipitator (ESP) is a highly efficient filtration device
that removes fine particles, like dust and smoke, from a
flowing gas using the force of an induced electrostatic
charge minimally impeding the flow of gases through
the unit.
 No of pass per boiler : 4
 Gas flow at inlet : 566.7 Nm3/s
 Temp. at inlet : 127 0C
 Dust concentration at inlet : 86.8 gm/Nm3 (Worst Coal),
70.69 gm/Nm3 (Design Coal)
 Dust concentration at outlet : 50 mg/Nm3(Worst Coal)
 Efficiency : 99.942 %

Monnet Power Company Ltd 70


 Induced Draught Fan : ID Fans evacuate combustion
products from the boiler furnace by creating sufficient
negative pressure to establish a slight suction in
furnace.
 Make : BHEL
 No per Boiler : Two
 Model No. - NDZV 47 SIDOR
 Fan Regulation : Inlet damper & VFD
 Temp. of Medium : 150 0C
 Motor Rating : 3800 KW
 Flow : 565 m3/Hr
 Draught at Inlet : -270 mmwc
 Draught at Outlet : 32 mmwc
 Bearing Lubrication : Oil Lubrication(ISO VG68)
Monnet Power Company Ltd 71
INDUCED DRAUGHT FAN
Suction
Chamber

Motor

Front
Side
Bearing
Rear
Side Discharge Impeller
Bearing Monnet Power Company Ltd
Chamber 72
Thanks

Monnet Power Company Ltd 73

You might also like