07-Bus Protection IED REB670
07-Bus Protection IED REB670
07-Bus Protection IED REB670
Busbars
Meshed corners,
T-protection
ABB Power Technologies AB, 2005
2
REB 670*1.0 … Available Versions
3-Phase Version
Two measuring zones
BFP, OC, EnFP & AR
4 or 8 bays
1-Phase Version
One IED per phase
Two measuring zones
BFP, OC, EnFP & AR
12 or 24 bays
ABB Power Technologies AB, 2005
3
REB 670*1.0 Proposed Variants
12I + max 3*IO Cards 12I/24I + max 11*IO Cards
4
Three-Phase Terminal; 4/8 Bays- Double Zone
Application Areas:
Smaller Buses (up to 8 CTs per zone)
REB 670; 3Ph Single Busbar Stations (with Transfer Bus)
2 Zones (A & B); 1½ Breaker Stations
8 Bays
Double Busbar Stations (with Transfer Bus)
Zone Interconnection included in the design
7
REB 670 3- Ph; BBP, BFP & EnFP for single buses
ZA ZB
ZA
ZA
ZA ZB
ZB
T connections
Alternative CT Location
8
REB 670 3- Ph, BBP, BFP, EnFP for 1½ CB stations
ZA
ZB
1½ Breaker Stations
up to 4 diameters
ZA
.. .
ZB
ABB Power Technologies AB, 2005
1½ Breaker Stations
up to 8 diameters
9
REB 670 3- Ph; BBP, BFP & EnFP for Double CB stations
ZA
.. .
ZB
Alternative CT Location
ABB Power Technologies AB, 2005
10
REB 670 1- Ph; BBP, BFP & EnFP for double buses
ZA
.. .
ZB
ZA
.. .
ZB
.. . Transfer Bay
Transfer Bus
.. . Isolator replica in REB 670*1.0
by CAP 531 Configuration
ABB Power Technologies AB, 2005
11
Single-Phase Terminal; 12/24 Bays- Double Zone
Application Areas:
Bigger Buses (up to 12/24 bays per zone)
REB 670; Ph-L1
2 Zones (A & B); Single Busbar Stations (with Transfer Bus)
24 Bays 1½ Breaker Stations
Double Busbar Stations (with Transfer Bus)
REB 670; Ph-L2 Load Transfer is included into the design
2 Zones (A & B); 3 Terminals required for complete scheme
24 Bays LDCM available to share binary IO
12
REB 670 1- Ph; BBP, BFP & EnFP for single buses
ZA
.. . ZA
.. . .. .
ZB
Single Bus
Single Bus with bus-section disconnector
up to 12/24 feeder bays
up to 12/24 feeder bays (i.e. 12+12; 16+8 etc.)
ZA ZB ZA ZB
.. . .. . .. . .. .
13
REB 670 1- Ph; BBP applications for 1½ CB stations
ZA
ZA
.. . .. .
ZB
ZB
1½ Breaker Stations 1½ Breaker Stations
up to 6 / 12 diameters up to 12 / 24 diameters
ABB Power Technologies AB, 2005
14
REB 670 1- Ph, Complete BBP, BFP & EnFP for 1½ CB Stations!
ZA
.. .
ZB
15
REB 670 1- Ph; BBP, BFP & EnFP for Double CB stations
ZA ZA
.. . .. .
ZB ZB
16
REB 670 1- Ph; BBP, BFP & EnFP for double buses
ZA
.. .
ZB
17
REB 670 1- Ph; BBP, BFP & EnFP for double bus & transfer
ZA
.. .
ZB
.. .
Transfer Bus
.. .
Combined Bus-Coupler
& Transfer Bay
ZA
.. . Bus-Coupler Bay
ZB
.. . Transfer Bay
Transfer Bus
.. .
Isolator replica in REB 670*1.0
ABB Power Technologies AB, 2005
18
REB 670 1- Ph; BBP, BFP & EnFP for double buses
Main 1 Main 2
.. . .. .
Reserve 1 Reserve 2
Four Zone Double Bus with two bus-coupler CBs and two
bus-section CBs and up to 20/21 feeder bays on each station side
Main 1 Main 2
.. . .. .
Reserve 1 Reserve 2
ABB Power Technologies AB, 2005
Four Zone Double Bus with two BC-CBs one BS-CB and one sectionalizing
disconnector with up to 18-20 feeder bays in the whole station
19
REB 670*1.0; 1-ph version Summation Principle
N 8
20
Features in REB 670*1.0
21
REB 670 Allocation of BBP Software Functionality
22
Toll => PCM 600 for Whole 670 Series
ABB Power Technologies AB, 2005
23
PCM 600 => CAP 531 + SMT + PST
ABB Power Technologies AB, 2005
PST
2006-03-30 Substation Automation Products Training
©
24
What is done Where for BBP in REB 670
SMT
ABB Power Technologies AB, 2005
25
REB 670 BBP Software Structure / Function Blocks
One Basic
ABB Power Technologies AB, 2005
Function in AFL,
Hidden
connections exist
26
Principle Drawing for Double Bus-Single CB Station
Disconnector aux. contact timing
Zone A Main
Open Closed
Zone B contact
Aux. a
Open Closed
contact
ba Aux. b
Closed Open
contact
QB1
QB2
SSxx
DISABLE Set Parameter
CLOSED
NO ZoneSel="CtrlIncludes"
OPEN
NC
ALARM
FORCED
TRBAY
BI1
1200/1
A/D I3PB1
BOM
QB9
Other
Equipment TRM
27
Differential Protection in REB 670*1.0
Operate
I in region
I d=
ABB Power Technologies AB, 2005
Differential protection
operation characteristic
Diff Oper Level
Sensitive Oper Level
s=0.53
28
Sensitive Differential Protection in REB 670*1.0
Operate
I in region
I d=
ABB Power Technologies AB, 2005
Differential protection
operation characteristic
Diff Oper Level Sensitive
Sensitive Oper Level differential
s=0.53 protection
29 en04000260.vsd
Open CT detection for REB 670*1.0
Operate
I in region
I=
d OCT Logic Supervision Level
Differential protection
ABB Power Technologies AB, 2005
operation characteristic
Diff Oper Level Sensitive
Sensitive Oper Level differential
s=0.53 protection
30
Check Zone in REB 670*1.0
Operate
region
ABB Power Technologies AB, 2005
Oper Level
s=0.0-0.90 (settable)
31
Zone Supervision in REB 670*1.0
32
Disconnector/CB supervision & alarming
33
User Friendliness in REB 670*1.0 (3-Ph & 1-Ph)
34
Bay-Connections & Switchgear-Status Matrices
35
Available Configurations X01, X02 & X03
X01: Just BBP for simple stations layouts (i.e. 1½ CB, Double
Breaker, Single Breaker, or for double busbar-single breaker stations
where Zone Selection is done by using just b contacts). Available for
all five versions A20, A31, B20, B21 & B31.
Direct replacement for RED 521*1.0
X02: Just BBP for double busbar-single breaker stations where Zone
Selection is done by using a&b contacts from disconnectors and
breakers. Available for versions A31, B21 & B31
X03: BBP with BFP, EnFP & OCP for double busbar-single breaker
stations where Zone Selection is done by using a&b contacts from
disconnectors and breakers. Available for versions A31, B21 & B31
36
Breaker Failure Protection (BFP)
37
Phase Overcurrent function (TOC)
38
End Fault Protection
CB=Clearing Boundary
Feeder
Protection
Feeder
Protection
39
Autoreclosing Function (AR)
40
Disturbance and Event Recorder in REB 670*1.0
Up to 40 recording channels!
Sampling rate 20 samples per power system cycle
Disturbance recording of all 24 analogue input channels
Disturbance recording of all differential currents
Disturbance recording of all incoming currents
Up to 96 binary signals can be recorded as well
DR file is saved in the terminal in COMTRADE format
Last 30 recordings are stored in the terminal
Each recording up to 6s long
Internal even list with last 1000 binary events available in
ABB Power Technologies AB, 2005
the terminal
41
Communication
Front connection:
RJ45 Ethernet port
Rear Communication
Optical :
IEC61850
IEC103
SPA
LON
ABB Power Technologies AB, 2005
42
Communication
Capabilities Designed for IEC 61850
Utility LAN
TCP/IP
Station bus
Protection
IEC61850-8-1 Control Protection Protection Control
& Control
ABB Power Technologies AB, 2005
43