El shotcrete convencional, tal como lo conocemos, requiere una planta dosificadora, un equipo de transporte de la mezcla y un lanzador robótico. Este es el sistema de sostenimiento con shotcrete utilizado por la mayoría de las minas... more
    • by 
    •   20  
      ConcreteConcrete TechnologyGeopolymer ConcreteFIBRE REINFORCED CONCRETE
Basic Concepts and Recommended Procedures for Numerical Analysis related to Mining and geotechnical By FLAC3D Instructor: Khezr Mohammadamini Organizer: Student Scientific Society of Mining Engineering University of Tehran Follow Khezr... more
    • by 
    •   5  
      Mining EngineeringNumerical AnalysisTunnellingFlac 3d
Sydney Metro is Australia's biggest public transport project. Stage 2 of the project will extend metro rail from the city's northwest under Sydney Harbour, through new stations in the CBD and southwest to Bankstown. Sydney Metro has two... more
    • by 
    •   8  
      GeophysicsGeotechnical EngineeringDeep excavation and urban tunnellingGeotechnical Investigation
Was befndet sich im Untergrund? Der Keller mit der Waschmaschine, ein Parkhaus, Wasserleitungen, vielleicht irgendwo eine Erdwärmesonde. Und was kommt danach, in fünfundert Metern Tiefe? Welche Gesteine bilden den geologischen Untergrund... more
    • by 
    •   6  
      GeologyUrban PlanningHistory of SwitzerlandSubterranean Structures
    • by  and +1
    •   5  
      Civil EngineeringRock MechanicsUnderground TunnelTunnel Design and Underground Structures
The new subway line passes under an existing subway line and an under pass roadway. The new tunnel is going to be built with a tunnel boring machine (TBM) using the earth pressure balance (EPB) procedure. In order to define the... more
    • by 
    •   5  
      Civil EngineeringTunnel EngineeringTunnel Design and Underground StructuresGeotechnical Instrumentation
The existing Salang tunnel connects Kabul to Northern Provinces of Afghanistan. The tunnel was built by So-viets engineers in 1960s and it is about 2600 m long. The tunnel is located at an altitude of 3400 m so that the portals and... more
    • by 
    •   4  
      EngineeringNumerical modelling in Geotechnical EngineeringTunnel EngineeringTunnel Design and Underground Structures
Le béton projeté conventionnel tel que nous le connaissons nécessite d'une centrale à béton, un mélangeur à baril et un pulvérisateur robotisé. C’est le système de support utilisé pour la majorité des mines souterraines dans le monde... more
    • by 
    •   20  
      Mining EngineeringConcrete TechnologyGeopolymer ConcreteHigh Strength and High Performance Concrete
The Comparison Cross-section of Rock types encounters in Karora HPP Tunnel.
    • by 
    •   3  
      Rock MechanicsTunnel EngineeringTunnel Design and Underground Structures
This work aims to better understand improvements in history of the rock bolt support. Although the rock bolt was invented more than one hundred years before, its usage has increased in mining and tunneling industries since the 1930s.... more
    • by 
    •   5  
      Mining EngineeringRock MechanicsMiningTunnelling