Abstract
With the reform of China’s power system, power transmission and transformation project (hereinafter referred to as PTATP) are gradually developing in the direction of integration, informatization, large-scale and systematization. Therefore, the traditional project cost can no longer meet the needs of the society, which requires the project cost based on BD (hereinafter referred to as BD) technology. Through the information platform (hereinafter referred to as IPF), we can collect a lot of information, including policies and regulations database, talent and machine price information database, project cost index database, industry information database, etc., which will provide important support for project cost. Project cost informatization will solve the problems of low information sharing rate, low information value and high information cost, which will more scientifically complete the cost of PTATP. Based on BD technology, we can collect, sort out and analyze the cost information data of PTATP, which will fully explore the data value. Firstly, this paper analyzes the main algorithms needed for project cost. Finally, this paper constructs a PTATP cost IPF based on BD analysis, which will provide accurate countermeasures.