Saudi Aramco Pre-Commissioning Form

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

FORM # G-007 (5/18/15)

SHT 1 of 1

SAUDI ARAMCO PRE-COMMISSIONING FORM


SUBMERSIBLE PUMPS

EQUIPMENT TYPE:
EQUIPMENT TAG NO.:
BI/JO NO.:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:
COMMISSIONING DATE:
1
2
3
4
5
6
7
8
9
10
11
12
13
14

USER REFERENCE:
DESCRIPTION:
PLANT NO. / LOCATION:
SERIAL NO.:

PUMPS CHECKED PER DATA SHEET_______


NAME PLATE DATA CHECKED.
PUMP UNDAMAGED
POSITION & MOUNTING CHECKED PER _____
CAISSONS INSTALLATION CHECKED PER_____
YES____NO____N/A____
PUMP LEVEL CHECKED
SEAL SYSTEM COMPLETED
SUCTION STRAINER FITTED
MOTOR WINDINGS MEGGER CHECKED
CABLE MEGGER CHECKED
ACCESS TO DISCHARGE VALVE CHECKED
INSTRUMENTATION SYSTEM VERIFIED
ELECTRICAL SYSTEM VERIFIED
VENDOR'S RECOMMENDATIONS FOLLOWED

YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____
YES____NO____

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist.
Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project
Acceptance Committee.

APPROVALS
Signature & Date

SAPMT

INSPECTION

CopyrightSaudi Aramco 2009. All rights reserved.

OTHER DEPT.

OPERATIONS