Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Saudi Aramco Pre-Commissioning Form: Metering

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

Form No.

P- 012 Issue Date: March 2006

Sheet 1 of 1

SAUDI ARAMCO PRE-COMMISSIONING FORM


METERING
Equipment Type:
Equipment Tag No:
BI/JO No:
Ref. Drawings & Documents:
Manufacturer:
Model No:
Test Completion Date:

User Reference:
Equipment Description:
Plant No. / Location:
Serial No:

FIELD INSTALLATION CHECK LIST


VISUAL AND MECHANICAL
Yes

No

Yes

No

1. Examine all devices for broken parts, indication of shipping damage and wire
connection tightness.
2. Verify meter connections in accordance with single line meter and relay diagram.
3. Verify meter scale is compatible with Current Transformer, Voltage Transformer
and/or transducer ratings.
ELECTRICAL TESTS
1. Calibrate all meters and transducers in accordance with manufacturer's instructions.
Verify meter deflection and accuracy at 0, 1/4, 1/2, 3/4, and 100% full scale values.
Provide calibration data.
2. Verify all meter multipliers.
3. Verify instrument transformer secondary wiring terminal to terminal.

Witness
Signature & Date

PDD

Inspection

Operation/Maintenance

CopyrightSaudi Aramco 2009. All rights reserved.

Contractor

You might also like