REV 3
SATR NUMBER
SATR-S-4006
PROJECT TITLE
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
30-Jun-08
DATE APPROVED
QR NUMBER
15-Dec-09
Plumb
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
REFERENCE
PASS
FAIL
N/A
RE-TEST DATE
PASS
FAIL
N/A
RE-TEST DATE
SAES-S-060
Para 1.1
A2
Place the test plug so that both upper and under sides of the sub-pan be
subjected to the test at the point where it is clamped to the drain
(UPC Para 412.8.1)
SAES-S-060
Para 1.1
B. CONCLUSIONS
ITEM
No.
B1
REFERENCE
Test results are acceptable (no leak detected) and in accordance with
Saudi Aramco Engineering Standards and contractual requirements.
N/A
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-S-060-- Saudi Aramco Plumbing Code, 28 January 2004
2- Uniform Plumbing Code (UPC), 2000
Contractor / Third-Party
Technician Performing Test*
Name, Title, Department,
Company, Initials and Date:
Saudi Aramco
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Witnessed Test
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 1 of 1
N = NO F = FAILED