SAUDI ARAMCO ID/PID - 6/30/2008 - REV 3 (Standards Cutoff - June 2008)

REV 3
SATR NUMBER

SAUDI ARAMCO TEST REPORT


Emergency Eyewash/Shower Functional Test Report
PROJECT TITLE

SATR-B-4001
WBS / BI / JO NUMBER

EQUIPMENT ID NUMBER(S)

EQUIPMENT DESCRIPTION

LAYOUT DRAWING NUMBER

REV. NO.

SCHEDULED TEST DATE & TIME

ACTUAL TEST DATE & TIME

30-Jun-08
DATE APPROVED
QR NUMBER

15-Dec-09

PLUMB

CONTRACTOR / SUBCONTRACTOR

EQPT CODE

SYSTEM ID.

PURCHASE ORDER NUMBER

PLANT NO.

EC / PMCC / MCC NO.


QUANTITY INSP.

MH's SPENT

TRAVEL TIME

SAUDI ARAMCO USE ONLY


SAUDI ARAMCO TIP NUMBER

SAUDI ARAMCO ACTIVITY NUMBER

SAUDI ARAMCO INSPECTION LEVEL

CONTRACTOR INSPECTION LEVEL

ITEM
No.

TEST PROCEDURE ACCEPTANCE CRITERIA

REFERENCE

A. TEST PROCEDURE AND CHECKLIST


With the unit Correctly connected to the water sources
A1

and valve(s) closed, visually check the piping connections for leaks

SAES-B-069
Section 7

(ANSI Para 4.6.5.1)


Open the valve to the full open position. The valves shall remain open
A2

without requiring further use of the operator's hand (ANSI 4.6.5.2)

SAES-B-069
Section 7

A3

Measure The face of the shower head from the surface on which the
user stands. (ANSI 4.6.5.3)
(Applicable to Emergency showers only)

SAES-B-069
Section 7

A4

With the valve in the " full on" position, measure the diameter of the
sprays pattern. (ANSI 4.6.5.4)
(Applicable to emergency showers only)

SAES-B-069
Section 7

A5

The fluid used in the system for flushing injurious materials from the eye,
face and body shall be potable water or otherwise water certified for the
purpose by Saudi Aramco Environmental Compliance Division /
Environmental Protection Department.

SAES-B-069
Para 5.1.1

A6

The flushing fluid in self contained units shall use an isotomic saline
solution 0.85% to 1.0% NaCl buffered to a pH from 7.3 to 7.4 and
preserved with a suitable anti-bacterial agent.

SAES-B-069
Para 5.1.3

A7

Water supply shall be capable of providing flow for a duration of at least


15 minutes to the involved eyewashes and showers at the flow rates and
pressures specified herein.

SAES-B-069
Para 5.2.1

A8

Measure the water temperature at the discharge point.


(SAES-B-069 Para 5.3)

SAES-B-069
Section 7

B. TEST EQUIPMENT AND MATERIALS CRITERIA


See SATR-A-2003 (Calibration Test Report-Temperature Gauge)
C. TEST RESULTS

Measured value from the face of the shower head to the


surface on which the user stands

CM

Measured diameter of the spray pattern

CM

Measured water temperature

Page 1 of 3

WORK PERMIT REQUIRED?

PASS

FAIL

N/A

RE-TEST DATE

Page 2 of 3

SAUDI ARAMCO ID/PID - 6/30/2008 - REV 3 (Standards Cutoff - June 2008)

REV 3
SATR NUMBER

SAUDI ARAMCO TEST REPORT


Emergency Eyewash/Shower Functional Test Report

SATR-B-4001

PROJECT TITLE

WBS / BI / JO NUMBER

30-Jun-08
DATE APPROVED
QR NUMBER

15-Dec-09

PLUMB

CONTRACTOR / SUBCONTRACTOR

D. CONCLUSIONS
ITEM
No.
D1

TEST RESULTS ACCEPTANCE CRITERIA

REFERENCE

The face of the shower head from the surface on which the user stands
is between 208.3 cm (82 inches) and 243.8 cm (96 inches)
(ANSI 4.6.5.3)
Note: Applicable to Emergency showers only

PASS

FAIL

N/A

RE-TEST DATE

SAES-B-069
Section 7

D2

With the valve in the " full on" position, measured diameter of the
sprays pattern is a minimum of 50.8 cm (20 inch) at 152.4 cm
(60 inch) above the standing surface. The center of the spray shall be at
least 40.6 cm (16 inches) from any obstruction. (ANSI 4.6.5.4)
(Applicable to emergency showers only)

SAES-B-069
Section 7

D3

Measured water temperature shall not exceed 38C at any time.

SAES-B-069
Para 5.3.1

D4

Test results are acceptable and in accordance with Saudi Aramco


Engineering Standards and contractural requirements.

N/A

REMARKS:

REFERENCE DOCUMENTS:
1-SAES-B-069 -- Emergency Eyewash and Showers, 5 September 2006
2-ANSI Z358.1 -- American National Standard for Emergency and Shower Equipment, 2004

Contractor / Third-Party
Technician Performing Test*
Name, Title, Department,
Company, Initials and Date:

Saudi Aramco
PMT Representative

Test Performed Successfully and Results are Acceptable:

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

T&I Witnessed

QC Record Reviewed

Work Verified

Name, Initials and Date:

QC Inspector

PID Representative
Witnessed Test

Work / Rework May Proceed

Name, Initials and Date:

Name, Initials and Date:

QC Supervisor

Proponent and Others


Quality Record Approved:

Name, Sign and Date:

Name, Organization,
Initials and Date:

*Person Responsible for Implementation of Test and Analysis of Results

Y = YES

Page 3 of 3

N = NO F = FAILED