SAUDI ARAMCO PRE-COMMISSIONING FORM


OFFSHORE ANODE BED PERFORMANCE EVALUATION
EQUIPMENT TYPE:
USER REFERENCE:
EQUIPMENT TAG NO.:
DESCRIPTION:
BI/JO NO.:
PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:
SERIAL NO.:
COMMISSIONING DATE:
SYSTEM DATA
RECTIFIER TYPE______Oil Cooled______Air Cooled

RECTIFIER RATING:______V ______A

TYPE OF ANODE BED:______Remote ______Distributed


ANODES:_______

ANODE TYPE:_______ NUMBER OF

CP SYSTEM CAPACITY:___________A

OPERATING OUTPUT______V______A

SURVEY DATA
J/B No. or
Anode Pallet No.

ANODE No.

ANODE
OUTPUT (A)

J/B No. or
Anode Pellet No.

ANODE No.

ANODE
OUTPUT (A)

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist.
Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project
Acceptance Committee.

APPROVALS
Signature & Date

SAPMT

INSPECTION

CopyrightSaudi Aramco 2009. All rights reserved.

OTHER DEPT.

OPERATIONS

FORM # X-011 (5/25/15)

SHT 2 of 2

SAUDI ARAMCO PRE-COMMISSIONING FORM


OFFSHORE ANODE BED PERFORMANCE EVALUATION
EQUIPMENT TYPE:
USER REFERENCE:
EQUIPMENT TAG NO.:
DESCRIPTION:
BI/JO NO.:
PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:
SERIAL NO.:
COMMISSIONING DATE:
Page _____of _____
REMARKS:

Error: Reference source not found

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist.
Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project
Acceptance Committee.

APPROVALS
Signature & Date

SAPMT

INSPECTION

CopyrightSaudi Aramco 2009. All rights reserved.