COMPANY SPECIFICATIONS
20215.PKG.ETI.SDS
Rev. 2
February 2011
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 2 of 21
FOREWORD
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 3 of 21
INDEX
1. GENERAL .................................................................................................................................. 5
1.1 Scope ......................................................................................................................................... 5
1.2 Applicability .............................................................................................................................. 5
3. PROJECT................................................................................................................................... 7
3.1 General ...................................................................................................................................... 7
3.2 Design........................................................................................................................................ 7
3.3 Environmental conditions ....................................................................................................... 7
3.4 Electrica plant and voltage levels........................................................................................... 7
3.5 Voltage Variations .................................................................................................................... 8
3.6 Distribution board .................................................................................................................... 8
3.7 Lighting levels .......................................................................................................................... 8
3.8 Conteporaneity Coefficients ................................................................................................... 9
3.9 Hazardous areas classification............................................................................................... 9
3.10 Safety execution ....................................................................................................................... 9
3.11 Protection degree ..................................................................................................................... 9
3.12 Earthing Systems ..................................................................................................................... 9
5. MATERIALS............................................................................................................................. 12
5.1 Selection Criteria .................................................................................................................... 12
5.2 Local distribution panels....................................................................................................... 12
5.3 Junction and Connection Boxes, Control, Protection and Signal Boxes ........................ 12
5.4 Terminal Strips ....................................................................................................................... 12
5.5 Electric equipment ................................................................................................................. 13
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 4 of 21
8. SAFETY.................................................................................................................................... 18
8.1 General requirements ............................................................................................................ 18
8.2 Protection against direct contacts ....................................................................................... 18
8.3 Protection against indirect contacts .................................................................................... 18
8.4 Fire resistance ........................................................................................................................ 18
11. DOCUMENTATION.................................................................................................................. 19
11.1 Documentation with the tender ............................................................................................ 19
11.2 Documentation for approval ................................................................................................. 19
11.3 Documentation to be used by the Company for the plant design .................................... 20
11.4 Test Documentation............................................................................................................... 20
11.5 Final technical documentation.............................................................................................. 20
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 5 of 21
1. GENERAL
1.1 Scope
This specification defines the main design requirements, supply of material, installation
and test of electric and instrumentation plants included in package supplies.
These shall be considered as general requirements, while the technical definition of the
plant and relevant components shall be the Contractor’s responsibility.
The plants, object of this specification, which shall be defined in the relevant Data
Sheets, are mainly the followings:
• Power plant
• Lighting plant
• Earthing system
• Protection plant against the atmospheric discharges
• Ventilation and air conditioning plants
• Pressurization plant
• Fire, smoke and gas detection system
• Fire-fighting system
• Instrumentation plant
For all the aspects not covered by this specification, reference is made to the applicable
Normative references and to the project technical documentation, and in particular to:
• Technical Data Sheet (T.D.S)
• Inspection Data Sheet (I.D.S.)
• Requested Documentation Data Sheet (D.D.S.),
Any proposed alternative will be evaluated if its operative and performance validity, as
requested by this document, is demonstrated.
1.2 Applicability
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 6 of 21
The project will be executed in compliance with the document issued by the Company
and observing the Reference Laws and Rules in force in the country where the
equipments/materials will be installed.
General good practices in technical projects shall however be respected, particularly as
regards safety and accident prevention.
The measurement units adopted will conform to the International System (I.S.).
For the cable conduits diameters and fittings in general, the measurement in "inch" may
be used.
Graphic symbols, identification codes and logos will conform to the CEI EN rules, IEC
Standards, standards and procedures indicated in the Project's Specification.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 7 of 21
3. PROJECT
3.1 General
The design is the entire responsibility of the Supplier who will respect the standard good
practice, the Company's requirements expressed in this specification, the Project
Specification, the reference rules and documents, the safety and functional requirements.
3.2 Design
3.2.1. General requirements
The Contractor shall carry out the design from the design premises by dimensioning the
plant and defining the type and the quantity of materials.
The supply limit for the electric plants shall be defined as the connection point to the local
panel/board (incomer terminal strip).
The supply limit for the instrumentation plants shall be defined as the connection point to
the local panel and/or to the junction boxes for control electric signals, and/or the air
distribution points for the pneumatic signals.
If not otherwise specified in the Data Sheet, the voltage levels relating to electric energy
supply will be:
• 400V ±10%; 50 Hz ± 5% : three-phase and directly earthed neutral
• 110V : direct current
The symmetric short circuit current value will be defined time by time in the Project's
specification.
If not otherwise specified in the Data Sheet, the voltage levels provided for the distribution
systems supply and the relevant electric uses will be:
• Power : 400V – 50 Hz - three-phase+neutral
• Normal light : 230V – 50 Hz - phase+neutral
• Safety light : 110V d.c.
• Motors higher than 1kW : 400V – 50 Hz - three-phase
• Motors lower than 1kW : 230V – 50 Hz - phase+neutral
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 8 of 21
If not otherwise indicated, the rooms normal internal lighting shall be controlled by a
control device located in the proximity of the entrance door.
The control circuit for the power supply to the outdoor lights (photoelectric cell) shall be
located in the lighting distribution panel.
The emergency lights shall be automatically activated lacking the normal lighting.
The relevant automatic commutation device shall be located in the distribution panel.
A single three phases plus neutral line shall feed the power distribution panel, which shall
distribute the electric power to sockets and other users placed in the cabin.
It shall be possible to section every circuit from power supply by means of proper circuit
breaker or section switch under load.
Protection devices against instrumentation and cables overcurrents shall be provided for
every circuit, as per normative references.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 9 of 21
INSTALLATION
MATERIAL
INDOOR OUTDOOR
Junction boxes IP 33 IP 55
Electrical machines IP 23 IP 55
Instrumentation IP 23 IP 55
Local panel IP 33 IP 55
Equipment IP 33 IP 55
The requirements for the protection degree shall be applied to plants in safe execution.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 10 of 21
4. DESIGN DEVELOPMENT
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 11 of 21
Standard series civil wall or desk type telephone sets with decadic keyboard and earthing
key, equipped with a three poles standardised plug, shall be utilised.
4.8.1 General
The instrumentation plant is extended to the monitoring, control and regulation equipment
included in the supply, and the relevant process, electric and/or pneumatic connections.
The package's control instrumentation shall be indicated in the relevant P&ID.
The instrumentation type, electronic or pneumatic, and the type of signals to be utilised,
shall be defined in the project documentation and shall comply with the normative
references.
The following requirements apply, if not otherwise indicated:
a) Local control systems
They shall be of the pneumatic type, through the utilisation of self-regulating valves.
b) Remote control systems
They shall be of the electronic type. Transmitters, complete with the relevant
transducers for the control of the final parameters, both of the two wires type, shall
be utilised. The signal shall be 4 ÷ 20 mA.
All the pneumatic instrumentation shall be suitable to operate with instrument air or
treated natural gas, as indicated in the Data Sheet.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 12 of 21
5. MATERIALS
The enclosure shall be in the material indicated in the Data Sheet and in conformity with
the protection degree and safety execution requirements.
If required, they shall be sized to accommodate both the isolation, protection and control
equipment of the electric distribution and the operating, control and shut down logic of the
package.
Proper measures shall be taken to segregate the electric equipment from the
instrumentation ones.
Suitable electric or instrumentation terminal strips shall be provided for the external
connections. They shall be physically separated, or isolated by plates with relevant
glands for pneumatic signals
The interconnections or the entering power supplies shall be provided as indicated in the
Data Sheet, and in accordance with the safety requirements of the normative references.
5.3 Junction and Connection Boxes, Control, Protection and Signal Boxes
These will be chosen in relation to the number and type of conductors, the equipment
they will contain and their use. They will have a protection level not lower than "IP23" for
indoors and “IP55” for outdoors, unless otherwise specified. They will be made of
incombustible material.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 13 of 21
a) Circuit breakers
The circuit breakers shall comply with EN 60947-2.
If not otherwise indicated in the Data Sheet, they shall be provided with a service
interruption power (Ics) larger than the maximum allowable value for the expected short
circuit current.
b) Contactors
The contactors shall be in accordance with EN 60947-4-1.
c) Protection relays
The protection relays shall comply with IEC 255 and the Data Sheet requirements. The
relays integrated with the circuit breakers shall comply with the circuit breakers
normative references.
e) Motor-starters
The motor-starters, that is all the start, stop and overload protection devices, made up
by contactors and direct thermal relays, shall comply with EN 60947-4-1.
If not otherwise specified, a local control shall be provided for all the motor-starters and
wherever required, together with signals, shut downs and remote controls.
The protection direct devices shall be provided with a manual reset.
If not otherwise indicated, the protection against the short circuits shall be provided by
circuit-breakers co-ordinated with the motor-starters, such that type "2" co-ordinations
shall be obtained, in compliance with EN 60947-4-1.
The circuit breakers provided for the co-ordination with the motor-starters shall belong
to the "A" category, as per EN 60947-2.
The utilisation categories for the motor-starters shall comply with EN 60947-4-1:
• AC-3 for cage rotor motors in CONTINUOUS, DISCONTINUOUS service, etc.
• AC-4 for cage rotor motors in INTERMITTENT service.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 14 of 21
When required by the Company, the co-ordination of the motor-starters for electric
motors shall be indicated in the Data Sheet and in the relevant Tables.
f) Fuses
The utilisation of fuses for the protection of circuits is not accepted.
a) Auxiliary relays
The auxiliary relays shall comply with CEI EN 61810 and the requirements of the Data
Sheet.
They shall be provided with auxiliary contacts to obtain the foreseen schemes, and with
additional 1NO + 1NC free contacts.
The shut down relays (86) shall be for a continuous service with manual reset and the
shut down position clearly indicated.
c) Signalling lamps
If not otherwise indicated in the Data Sheet, the colours shall comply with EN 60073.
Incandescent lamps shall be used, with a drop resistance in series.
Other lamps types or LEDS can be utilised, if specifically approved in advance.
5.5.3 Motors
The electric motors shall be in conformity with the requirements of the relevant Data
Sheet attached to the supply specification of the package.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 15 of 21
5.5.5 Sockets
Sockets will conform to the types required and/or approved by the Client. On the walls,
fixed sockets will not be installed at a height from the floor lower than 300 mm (measured
from the middle of the sockets). Sockets intended for supply to equipment that, due to
their capacity or special characteristics, may cause danger during insertion or disinsertion
of plugs, and all standard current sockets higher than 16A will be provided with an
interruption element before the sockets, to allow for these operations in open circuit.
5.6 Instrumentation
If not otherwise indicated in the individual Data Sheets, the following minimum
requirements shall apply to the instruments included in the package:
• casings for pressure and temperature gauges in AISI 316 L;
• internal parts of instruments, inclusive of screws, bolts and nuts, in AISI 316 L, even if
not in contact with the process fluid;
• thermowells in AISI 316 L;
• manifolds in AISI 316 L, unless otherwise required by the process fluid;
• process connections threaded as per ANSI B.20.1 NPT or flanged as per ANSI B
16.5.
• pneumatic connections threaded 1/2" or 1/4" as per ANSI B.20.1 NPT.
• electric connections threaded as per UNI 6125 or ANSI B.20.1 NPT.
5.7 Cables
If not otherwise indicated in project documentation shall observe the instructions given in
the Company standards:
- Power and control electric cables 20169.EQP.ELE.FUN
- Electrical power system 20208.VAR.ELE.SDS
5.8 Accessories
5.8.2 Nameplates
All the main equipment and instruments shall be provided by the Manufacturer with a
stainless steel nameplate, with the indication of he fabrication data and the model.
Another nameplate, tied to the instruments by a stainless steel wire, shall indicate the
instrument tag in accordance with the P&I D of the package.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 16 of 21
6. INSTALLATION CRITERIA
The internal diameter of the conduits shall be at least 1,3 times the diameter of the
circumscribed circle to the cables bundle or 15mm, whatever is the maximum.
The inlet and the arrangement of power circuits in the enclosures shall be such that no
hazardous heating of the metallic parts will occur.
Cables with not compatible electric signals shall not be installed in the same conduit or
cable trays.
All the connections over the supply limits shall terminate on a proper interface terminal
strip or in a junction box.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 17 of 21
7. GENERAL REQUIREMENTS
7.1 Ergonomics
7.1.1 Accessibility
The access to the equipment during any activity (assembly, maintenance, operations)
shall comply with the requirements of the normative references and the ergonomics ones.
7.1.2 Soundproofing
When required, the soundproofing shall be provided by acoustic insulation material, in
compliance with the normative references and with the sound pressure values indicated
in the Data Sheets.
7.2.2 Tropicalization
When required in the Data Sheet, equipment and materials shall be subjected to
tropicalization treatments in conformity with the relevant specification.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 18 of 21
8. SAFETY
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 19 of 21
When required, they will be indicated in the Inspection Data Sheet (I.D.S.) and are
classified as:
- tests on materials and equipments;
- tests on plant;
The procedures for those inspections and tests which are not specified in the normative
references and this specification, but required in the Inspection Data Sheet (I.D.S.), shall
be defined on a case by case basis.
11. DOCUMENTATION
The Contractor shall provide the Company with all the documentation listed in the
required Documentation data Sheet (D.D.S.) in compliance with the stated procedures
and schedule.
The technical documentation shall be in the official language indicated in the Data Sheet.
The symbols specified in the normative references shall be utilized.
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 20 of 21
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Eni S.p.A. 20215.PKG.ETI.SDS
Rev. 2 February 2011
Exploration & Production Division Sheet 21 of 21
http://wwweandp.eni.it/TSServices/ITEM/Standards-/index.asp
CopEleStau@eni.it
Il presente documento è RISERVATO ed è di proprietà di ENI E&P. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato.
This document is CONFIDENTIAL and the sole property of ENI E&P. It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.