Location: By: Date: Chk. By: Date:: Project
Location: By: Date: Chk. By: Date:: Project
Project:
By:
Chk. By:
Location:
Date:
Date:
Mannings Formula
Q=(1/n)ARh2/3S1/2
R=A/P
A=cross sectional area
P=wetted perimeter
V=(1/n)Rh2/3S1/2
S=slope of channel
Q=V x A
Wetted
Perimeter, m
Hydraulic
Radius, m
velocity m/s
flow, m3/s
degree
Design based
on 1/2 flow
0.0209
0.3624
0.0577
1.42
0.0298
180
Selected
0.0210
0.3684
0.0570
1.4123
0.0297
211.0967
INPUT
q=
0.03 m3/s
0.2 m
m
0.011 mannings coef
degrees
0.011 slope m/m
Manning's n-values
pipe dia, m
PVC
0.01
0.2307395002
0.20
PE (<9"dia)
0.015
PE (>12"dia)
0.02
PE(9-12"dia)
0.017
CMP
0.025
ADS N12
0.012
HCMP
0.023
Conc
0.013
Location:
By:
Chk. By:
Date:
Date:
INPUT
Mannings Formula
Q=(1/n)AR
2/3
h
D=
d=
n=
1/2
S=
v=
d/D
R=A/P
A=cross sectional area
P=wetted perimeter
V=(1/n)Rh2/3S1/2
S=slope of channel
Q=V x A
0.2
0.1
0.011
180.0
0.011
1.29
0.5
Wetted
Perimeter, m
Hydraulic
Radius, m
velocity m/s
flow, m3/s
Design
0.0157
0.3142
0.0500
1.29
0.0203
Actual
0.0164
0.3621
0.0452
1.21
0.0198
Manning's n-values
PVC
PE (<9"dia)
PE (>12"dia)
PE(9-12"dia)
CMP
ADS N12
R 0.0370549
HCMP
83.395093
Conc
D
d
d/D
0.15
0.131
0.8733333
m
m
mannings coef
degrees
slope m/m
m/s
Manning's n-values
0.01
0.015
0.02
0.017
0.025
0.012
0.023
0.013