This document summarizes the steps to calculate heat load and design air conditioning parameters for a general office meeting room. It provides sample data for a 50m2 meeting room with 20 occupants located in Singapore. It outlines calculating internal heat gains from lighting, occupants, and equipment and external heat gains from walls and windows. The summary calculates a total cooling load of 18kW, recommends a supply air temperature of 14°C and volume of 2960cmh to maintain 24°C and 50-55% relative humidity under peak cooling conditions.

Uploaded by

Luís Abreu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
444 views

Acmv Design

This document summarizes the steps to calculate heat load and design air conditioning parameters for a general office meeting room. It provides sample data for a 50m2 meeting room with 20 occupants located in Singapore. It outlines calculating internal heat gains from lighting, occupants, and equipment and external heat gains from walls and windows. The summary calculates a total cooling load of 18kW, recommends a supply air temperature of 14°C and volume of 2960cmh to maintain 24°C and 50-55% relative humidity under peak cooling conditions.

Uploaded by

Luís Abreu
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

30/12/2015

ACMVDESIGN
Mais Blogueseguinte

20

ACMVDESIGN
Shareyourknowledge.Itisawaytoachieveimmortality.DalaiLamaXIV
+20 Recommend this on Google

BlogArchive
2014(1)
November(1)

Building
Services
Engineer
...

2013(3)
2012(3)

11November2014

AboutMe

Engineer

BuildingServices

ZawMoeKhine

BuildingServicesEngineer

Follow

170

Viewmycompleteprofile

RSEDEngineeringTrainingCentre

PopularPosts

M&ESystemDesignCourse

InternationalKnowledge

SampleHeatLoadCalcu
OfficeMeetingRoom
SampleHeatLoadCalcu
OfficeMeetingRoom
Calculation
upplyAirVolume(C...

UpdatedGuidelines/Standard(Suchas

ASHRAE/CIBSE/SS/NFPA)
References

M&ESystemDesignCourse

PRECOOLEDAHUCA
Juststartwithprecoole
Calculation!!
precooledAHU,
airvolumeandtempera

Duration4months
CourseFee220000kyats
Timing4pm6pm
(Saturday&Sunday)

DesignSupplyAirTem
Whenwedesigntheair
specifieshowmuchthe
is.Ifweneedtocalculat
volume,weneed...

It'sgoodtimingforallwhoareworking.
MostcourseoutlinesarejustDesign&Calculation.
It'sNotsuitablefortheonewhoarelookingforjustAutoCADDraftingcourse.
M&EDesignCoursecovered

HEATLOADCALCULA
Whenwecalculatetheh
toknowthelocationof
(Country,City)
informationsuchasbui

MechanicalServices
ACMVSystem
FireProtectionsystem
Plumbingsystem

ACMVDESIGNCOURSE
ACMVDESIGNCOURSEACMVDES
E20(HourlyAnalysisProgramHAP)
ACMVDESIGNCOURSE(SATURDA
YOUWA...

SanitarySystem
ElectricalServices
Lightingsystem

(notitle)
http://www.scribd.com/doc/11156925
CalculationSpreadsheetsQuickAnsw
RelyingonRulesofThumb?
secret_password=1lkzrbj8jn...

Powersystem
TelecommunicationsSystem
(Limitedseatonlyenrollnow)
Verysoonwillstart.

RSEDEngineeringTrainingCentre
No29A3,ZayarThiriLane,Hledan,Kamayut,Yangon.Myanmar.

PhoneNo09425295950/096452277.
Centre

Emailrsedengineering@gmail.com

BuildingServ

BuildingServ

RSEDEngineeri

M&a...

Facebookhttps://www.facebook.com/RSEDEngineering
Websitewww.acmvdesign.com
PostedbyZawMoeKhineat01:58

3comments

+7 Recommend this on Google

25April2013

DesignSupplyAirTempforPeakLoad
Whenwedesigntheaircon,weneedtospecifieshowmuchthesupplyairvolumeis.Ifweneed
tocalculatethesupplyairvolume,weneedtospecifiessupplyairtemp.So,thispostI'mgoingto
discussaboutdesignsupplyairtemp.

http://www.acmvdesign.com/

1/10

30/12/2015

ACMVDESIGN
Mostcommondesignsupplyairtempis13Cto15Cdependentoncoolingsourceandcoolingcoil
configuration.
MypersonaldefaultDesignSupplyAirTempis14Cbecausemostcommoncoildefaultleaving
airtempis12.8C(55F).So,IfIchoosedesignsupplytempis14C,leavingairtempfromcoilwill
bearound12.7Cto13C.

Byright,beforewespecifiesthesupplyairtemp,weneedtospecifiesoperationtempandRH%.
So,typicalcommonsetpointis23+1&50%RH.

ForSingaporeDesignParameter,BasedonSS554,maximumRH%islessthan65onbothPeak&Part
LoadCondition.So,ourPeakLoadconditionshouldbe50%~55%cozifpeakloadisabout60%,part
loadmaybemorethan65%andmaynotcomply.
Justcheckwithsample.
SpaceAreais100m2andCeilingHighis3m.
SensibleHeatLoadis10kWandLatentLoadis1.76kW.
Meaningthatthespacehave85%sensibleheatload&latentheatloadis15%.
So,SHRis0.85(SH/TH).
SpaceOperationTempis24C&RH50%(Lessthan55%)atPeakLoadcondition.
What'sthedesignsupplyairtempandairvolume?
Firststep,drawthelineonPsychrometricchartbyStandardPointandSHR.

So,AsperPsychrometricChart,Ifthespacehave0.85SHRandweneedtogetexactly50%RH,
coolingcoilADPshouldbe11.3C.AndthenSpacedewpointisabout13C,sothatcoolingcoiltemp
shouldbelessthanorequal13Cinordertogetnotmorethan55%RH.
AsIsaidabove,normalcoolingcoilleavingairtempisabout12.8C(55F)andcoolingcoilbypassfactoris
0.1(10%).Theroomoperationtempis24Candthenmixingtempwithfreshairisabout25C.Soback
workwithformula,CoilADP={Ts(TmxBF)}/1BF.
Supplyairtempwillbe14C.So,normallyIdidchooseDesignSupplyAirtempis14C.
LetcheckagainwithDesignSupplyAirTemp14C,howmuchtheRHinthespace.
JustdrawthelinefrompointCoilADP12.8toparallelwiththeline.
(ThelinefromSHRtostandardpoint).

Intersectionpointwith14CDB(SupplyAirTemp)isleavingairtemp
andtheroomoperationtempis24C&54%RHatPeakLoad.
So,theleavingairenthalpyisabout37kJ/kg.
Mostcommonleavingairenthalpyis35~38kJ/kgcozsupplyairtempis13C~15C.
So,TheroomOperationtemp24C&RH54%isacceptable,
Makethesupplyairtempis14C.
Ifsupplyairtempis14Candthespacesensibleloadis10kw,wecancalculatethedesignsupplyair

http://www.acmvdesign.com/

2/10

30/12/2015

ACMVDESIGN

volume.
Q=mxcxT
Q=10kw(kJ/s)
c=1.004kJ/kg
T=theroomoperationtempdesignsupplyairtemp(24C14C)
So,m=Q/(cxT).............(kg/s)
m=10/1.004x10=0.996kg/s.
V=mxv
v=HumidVolume(m3/kg)
FromPsychrometricChart,SupplyAirvis0.825m3/kg.
V=mxv=0.996x0.825(m3/s)
V=0.822m/s=2960m3/hr(CMH).
So,Thespacesensibleloadis10kw,SHRis0.85&Supplyairtempis14C,
Supplyairvolumeshouldbe2960cmh.Aftercalculatethesupplyairvolume,
weneedtocheckitthatit'ssufficientaircirculationtomeetminimumaircirculation.
It'scheckedbyminimunMVrequirement.Forofficebuildingtype,minimumaircirculationshouldbe6
ACH.That'smeanAreaxCeilingHighxminiACH=100x3x6=1800cmh.
So,oursupplyairvolume2960cmhismorethanenoughcomparewithminimumcirculation.
Letcheckthecoolingcoilloadfortheroomifmixingairtempis25CandRHis60%byfreshairmakeup.

Drawtheline14CdbforsupplyairtempandthenMixingAirTemp25C&RH60%.
Thecoolingcoilrateis

http://www.acmvdesign.com/

3/10

30/12/2015

ACMVDESIGN
Q=mxh
m=0.996kg/s
h=(h2h1)(kJ/kg)
h2=mixingairtempenthalpy55kJ/kg
h1=LeavingAirtempenthalpy37kJ/kg.
Q=mxh=0.996x(5537)=17.93kW.
Summarywillbe
TotalCoolingCoilis18kW.
DesignSupplyAirTempis14C.
DesignSupplyAirVolumeis2960cmh.
Thanks.
ZawMoeKhine.

PostedbyZawMoeKhineat16:59

2comments

+8 Recommend this on Google

Labels:DesignSupplyAirTemp

21January2013

SampleHeatLoadCalculationforGeneral
OfficeMeetingRoom
SampleHeatLoadCalculationforGeneralOfficeMeetingRoom

HeatLoadCalculation
CoolingCapacity(kW),
SupplyAirVolume(CMH),
SupplyFreshAirVolume(CMH),
ChilledWaterFlowRate(l/s)ifCHWSystemisused.

Whenwecalculatetheheatload,
Weneedsomeinformationforspace.
1Locationofspace
(AmbientTempforoutdoorair)
(SingaporeSummerAmbientTemp32.8C/26.1C(DB/WB)
2Room/SpaceDatas&Orientation(FacadeOrientation)
(Area50m2&RoomislocatedatNorthSideofBuilding)
3RoomConstructionMaterials
(SuchasWindowGlass(Uvalue&ScValue),Wall,Partition&Floor.)
4NoofOccupancy&RoomUsage
(20Persons&MeetingRoom)
IInternalHeatGain
iHeatGainfromLighting
(BasedonSS530OfficeLightingPower15W/m2)
LightingLoad=50x15=750W
iiHeatGainfromHuman(20person)
(BasedonASHRAEOfficeHumanSensible75W/person&Latent55W/person)
HumanLoad(S)75x20=1500W,(L)55x20=1100W
iiiElectricalEquipmentsLoad(GeneralOffice25W/m2)
Laptop55Wx20&Projector300W.
ElectricalEquipmentsLoad=30x50=1500W
IIExternalHeatGain

http://www.acmvdesign.com/

4/10

30/12/2015

ACMVDESIGN
iHeatGainfromWall(ConductionHeatGain)
(Q=AxUxT)
WallArea=10mx1m=10m2
WallUvalue(200mmbrickwall=2.254W/m2)
TforNorthsidefacing200mmbrickwall=14
So,Q=10x2.254x14=315.56W
iiHeatGainfromGlassWindow.(Conduction+RadiationHeatGain)
GlassArea=10mx3m=30m2
GlassUvalue=1.7W/m2
GlassScValue=0.3
CF=0.8
(Q=(3.4xAxU)+(211xAxScxCF)
Q=(3.4x30x1.7)+(211x30x0.3x0.8)=1692.6W
iiiHeatGainfromPartitionWall(ConductionHeatGain)
(Q=AxUxT)
PartitionArea=20x4=80m2
PartitionWallUValue=0.573W/m2
T(3024)=6
Q=80x0.573x6=275.04W
ivHeatGainfromFloor(ConductionHeatGain)
(Q=AxUxT)
FloorArea=50m2
FloorUValue=2.452W/m2
T(3024)=6
Q=50x2.452x6=735.6W
Afteraddingoutthetotalheatload
SensibleHeatLoadis6746.8W(10%SF)7421.53W=7.421kW.
LatentHeatLoadis1100W(10%SF)1210W=1.21kW
SHR=SH/(SH+LH)=7.421/(7.421+1.21)=0.86
That'smean86%isSensibleand14%isLatentheat.
Oncewegetthetotalsensibleheatload,wecangetthesupplyairvolume.
Qs=mcT
Qs=7.421kW(kJ/s)
c=1.004kJ/kg
Ifsupplyairtempis14C,T=2414=10.
m=Qs/(cxT)(kg/s)
m=7.421/(1.004x10)=0.73919kg/s
V,AirVolume(m3/s)=mxv(HumidVolumem3/kg)
Ifsupplyairtempis14C,visabout0.825m3/kg.
So,AirVolume,V=0.73919(kg/s)x0.825(m3/kg)
V=0.6098m3/s=2195CMH.
So,SupplyAirVolumeis2195CMH.

NextstepisFreshAirVolumeSupply,Ifthespacetypeisunderoffice,
MinimumFARequirementisbasedon62.1ASHRAE
(2.5l/s/person+0.3l/s/m2)=(2.5x20)+(0.3x50)=65l/s
MinimumFARequirementbasedonlocalcode(SS553).
5.5l/s/personor0.6l/s/m2(Choosehighervolume)
5.5x20=110l/s.
So,Wehavetochoose110l/sforthismeetingroom.
FreshAirSupplywillbe110l/s(396CMH).

AirConSketch

http://www.acmvdesign.com/

5/10

30/12/2015

ACMVDESIGN

So,supplyairvolume2195cmh&
freshairvolume396cmhforthis
meetingroom.
Layoutwillbeasperaircon
sketch.Justneedtocalculatehow
muchcapacityweneed.
ForCoolingLoadCapacity,
Q=mh
m=massofair(kg/s)(wealreadycalculated)
h=enthalpydifferentialofenteringairandleavingair(kJ/kg)
Forh=h1h2
h1=enthalpyofenteringairintocoil(maxingair)
h2=enthalpyofleavingairfromcoil(supplyair)
Sothatweneedtocalculatemaxingairtemp.
Mixingairvolumeissameassupplyairvolume.SeeAirconSketchdwg.
Inourdesigncondition,
SupplyAirTempis14C&RoomOperationTempis24C(maxi)&RHis50~55%.
FreshairtempisSingaporeSummerTemp,32.8C(DB)&26.1C(WB).
Sothatwecancalculatemaxingairtemp(enteringairtemp/oncoilairtemp).
Supplyairvolume(maxingairvolume)isadditionofreturnairvolumeandfreshairvolume.So,maxing
airtempisdependedonratioofreturnandfreshairvolume.
Equationwillbe
TmxMixingAirVolume=(TrxReturnAirVolume)+(TfxFreshAirVolume)
Otherwayis
Tmx100%=(TrxReturnAir%ofSupplyAir)+(TfxFreshAir%ofSupply)
Sowejustcalculatefreshairvolume%ofsupplyairvolume=396/2195x100=18%
Freshairvolumeis18%,returnairvolumewillbe10018=82%.
Tmx100=(Trx82)+(Tfx18)
Tr=RoomOperationTemp(24C)
(Itshouldadd1or2Cforductheatgainandplenumheatgain)
Tf=FreshAirTemp(32.8C).
Tmx100=(24x82)+(32.8x18)

Tm=25.58C
MixingAirTemp(DB)is25.58C.
Nextstepismaxingairtemp(WB)orHumidityRatio(g)
Sameasmaxingairtemp(DB)
equationwillbe
gmxMixingAirVolume=(grxReturnAirVolume)+(gfxFreshAirVolume)
gmx100=(grx82)+(gfx18)
gr=ReturnAirHumidityRatio
ReadfromPsychrometricChartbyRoomOperationTemp(24C&RH54%)
gr=9.8g/kg=0.0098kg/kg
gf=FreshAirHumidityRatio.
ReadfromPsychrometricChartbySingaporeSummerTemp(32.8C&26.1C)
gf=18.6g/kg=0.0186kg/kg.
Sogmx100=(0.0098x82)+(0.0186x18)

gm=11.83g/kg=0.01183kg/kg
ByMaxingAirTemp(DB)Tm,25.58C&MixingAirHumidityRatio(gm)11.83g/kg,

h1=55kJ/kg(FromPsychrometricChart)
Forh2,ReadfromPsychrometricChart
Basedonsupplyairtemp,coilADP,SpaceSHR&intersectionline.
SupplyAirtempis14C.
SpaceSHR=0.86
CoilADP=12.71C(Bycoilbypassfactoris0.1)

h2=37.2kJ/kg.
So,CoolingCapacityis

http://www.acmvdesign.com/

6/10

30/12/2015

ACMVDESIGN
Q=mh
m=7.421/(1.004x10)=0.73919kg/s
h=h1h2=5537.2=17.8kJ/kg
Q=0.73919x17.8
Q=13.15kJ/s(kW)

FanCoilUnitminimumcoolingcapacityis13.15kW.
CoolingRateis13.15/50x100=263W/m2.
SupplyAirVolumeis2195CMH
FreshAirVolumeis396CMH.

IfFCUischilledwatersystemandCHWTis5.5,
ChilledWaterFlowrate?

Q=mcT
Q=VcT
Q=CoolingCapacity(kJ/s)(kW)
V=WaterFlow(m3/s)
=Densityofwater(kg/m3)(1000kg/m3forwater)
c=SpecificHeatCapacityofWater(4.19kJ/kg)
m=massofwater(kg/s)
T=5.5
V=Q/cT=13.15/(1000x4.19x5.5)
V=0.00057m3/s
(1m3/s=1000l/s)
So,V=0.57l/s.
SoChilledWaterFlowRateis0.57l/s.
SothatforCHWSystem,m=V=....(Unitisl/s)
Q=mcT
m=Q/(cxT)...(l/s)

Thanks,
zawmoekhine

PostedbyZawMoeKhineat01:18

5comments

+15 Recommend this on Google

Labels:SampleHeatLoadCalculation

13January2013

HEATLOADCALCULATION
Whenwecalculatetheheatload,wehavetoknowthelocationofspace(Country,City)
Andthenbuildinginformationsuchasbuildingtype,material,orientation&authoritystandard(Which
standardwehavetofollow?localorinternational).

MainHeatSourceareInternalHeatGain,ExternalHeatGainandHeatGainfromOA(FA)
SeefollowingHeatLoadChart.

http://www.acmvdesign.com/

7/10

30/12/2015

ACMVDESIGN

1InternalHeatGain
HeatGainfromLighting
HeatGainfromHuman
HeatGainfromElectricalEquipments

2ExternalHeatGain
HeatGainfromWall
HeatGainfromWindow
HeatGainfromRoof
HeatGainfromFloor
HeatGainfromPartition

3HeatGainfromOutdoorAir/FreshAir
FreshAirRequirementforComfortAir
FreshAirbyinfiltration

PostedbyZawMoeKhineat14:20

0comments

+2 Recommend this on Google

Labels:HeatLoadCalculation

30October2012

http://www.scribd.com/doc/111569258/LoadCalculationSpreadsheetsQuickAnswersWithout
RelyingonRulesofThumb?secret_password=1lkzrbj8jnpsqznoyf54
PostedbyZawMoeKhineat23:14

0comments

Recommend this on Google

14October2012

PRECOOLEDAHUCALCULATION
JuststartwithprecooledAHUCalculation!!
WhenyouwanttosizetheprecooledAHU,
youneedtoknowfreshairvolumeandtemperaturesetpoint.
Onceyouknowthistwoinfo,youcansizetheAHU.
Juststartcalculatefor3000l/sfreshairvolumeandsetpointtempis16C.

http://www.acmvdesign.com/

8/10

30/12/2015

ACMVDESIGN
Weallknowthat,therearetwokindsofheatforfreshair,SensibleandLatentHeat.
CoolingprocessforSensibleandDehumidificationforremovingofmoisture.
ForSensibleHeatLoad,(CoolingProcess).
Q=mcT

Q=VcT
Q=CoolingCapacity(kJ/s)(kW)
V=AirVolume(m3/s)
=Densityofair(kg/m3)(1.204kg/m3forstandardair)
c=SpecificHeatCapacityofair(kJ/kgK)(1.004kJ/kgKforstandardair)
T=Temperaturedifferential.
m=massofair(kg/s)
V=3000l/s=3m3/s.(1000l/s=1m3/s)

=1.204kg/m3forstandardair@Sealevel.
c=1.004kJ/kgKforstandardair.
T=AmbienttemperatureSetpointtemp.
T=(3316)(SingaporeSummerAmbientTempSetpointtemp)
Q=3x1.204x1.004x(3316)
Q=(m3/s)x(kg/m3)x(kJ/kgK)x(K)
Q=61.65kW.
ForLatentHeatLoad,(DehumidificationProcess/RemovingofMoisture)
Q=mhfgg
Q=Vhfgg
Q=CoolingCapacity(kJ/s)(kW)
V=AirVolume(m3/s)
=Densityofair(kg/m3)(1.204kg/m3forstandardair)
hfg=heatofvaporizationofwater(kJ/kg)(2454kJ/kgforstandardair)
hfg=2500kJ/kg(Estimatedfor16C)

g=HumidityRatio(MoistureContentofdryair)(kg/kg)
m=massofair(kg/s)

Q=Vhfgg
Q=(m3/s)x(kg/m3)x(kJ/kg)x(kg/kg)
Q=3x1.204x2500xg
SothatweneedtoseePsychrometricChartforHumidityRatio.
FirstPointisAmbientTemperature.(SingaporeSummerTemp(33DB/26.1WB)
FromPsychrometricChart,g1is0.0186kg/kg(18.6g/kg)Basedon33DB/26.1WB.
ForSecondPoint,SupplyAirTempandCoilADPorCoilCurve.
CoilADPisbasedonCoilbypassFactor.
NormalStandardcoilbypassfactoris0.1.
Ifbypassfactoris0.1,CoilADPis{16(33x0.1)}/(10.1)=14.11C.
BasedonSupplyAirtemp16CandCoilADP(14.11C),
FromPsychrometricChart,g2is0.0108kg/kg(10.8g/kg).
Sothatg=g1g2

g=0.01860.0108=0.0078kg/kg.
Q=3x1.204x2500xg
Q=3x1.204x2500x0.0078
Q=70.434kW
TotalCoolingCapacityforAHUisSensibleLoad+LatentLoad.

TotalLoad=61.65+70.434=132.084kW

http://www.acmvdesign.com/

9/10

30/12/2015

ACMVDESIGN

NEXTOPTIONCALCULATIONWITHENERGYMETHOD
Q=mh
Q=Vh
Q=CoolingCapacity(kJ/s)(kW)
V=AirVolume(m3/s)
=Densityofair(kg/m3)(1.204kg/m3forstandardair)
h=EnthalpyDifferentialofenteringandleavingairtothecoil(kJ/kg)
m=massofair(kg/s)

Q=Vh
V=3m3/s
=1.204m3/kg
h=EnthalpyDifferentialofenteringandleavingairtothecoil(kJ/kg)
h=Enthalpyofenteringair(Offcoilair)Enthalpyofleavingair(Oncoilair)
FromPsychrometricChart,
FirstPoint,h1,EnthalpyofEnteringAirisbasedonAmbientAirtemp
(33CDB/26.1CWB),h1=81kJ/kg.
SecondPoint,h2,EnthalpyofLeavingairis
BasedonSupplyAirTemp16C,CoilADP&EnteringPoint.
h2=44kJ/kg.
Sothat,h=h1h2=8144
h=37kJ/kg.

Q=Vh
Q=3x1.204x37
Q=133.644kW.

PostedbyZawMoeKhineat01:03

7comments

+14 Recommend this on Google

Labels:PAHU/MAU/PAULoadCalculation(HeatGainfromOutdoorAir)

Home

OlderPosts

Subscribeto:Posts(Atom)

Watermarktemplate.Templateimagesbywingmar.PoweredbyBlogger.

http://www.acmvdesign.com/

10/10

You might also like