Miller Field Decommissioning: Steve Johnston - Miller Decommissioning Manager NPF Conference, Bergen - February 2009
Miller Field Decommissioning: Steve Johnston - Miller Decommissioning Manager NPF Conference, Bergen - February 2009
Miller Field Decommissioning: Steve Johnston - Miller Decommissioning Manager NPF Conference, Bergen - February 2009
Steve Johnston Miller Decommissioning Manager NPF Conference, Bergen - February 2009
Introduction
Overview of Miller field infrastructure Background Well abandonment activity Topsides clean-up Pipeline flushing operations Current status and lessons
Miller background
Miller infrastructure
26in GAS LANDLINE ST FERGUS TO PETERHEAD
TEE TEE
MILLER PLATFORM
BRAE A
BRAE B
SSIV SSIV
SSIV
SSIV
Miller background
Miller background
Production
On production 1992 - Ceased July 2007 150,000 BOPD, 225 MMSCF/D 345 MM BBLS produced 22 production and injection wells drilled
Topsides
Weight 28,100 Tonnes Large self-contained modules Drilling, oil/gas production & export, gas import / gas re-injection / water injection
Jacket
Steel Jacket 17,000 Tonnes Water Depth 103m 20 x 96in Piles 40 well slots Footings ~ 6000 Tonnes / 20m High
Well abandonment
22 platform drilled wells Well access problems - NORM / LSA etc. Implementation of cementing
Pump from surface - low cost Coiled tubing - medium cost Rig workover - high cost
All wells surveyed, displaced to seawater and plugged in advance Disconnected from process plant All fluids circulated to drains and reinjected.
Well abandonment
5
22 Conductors To be fully removed
SHALLOW SAND
4
SHALLOW SAND FRIGG SAND
PRODUCTION TUBING
3
FORTIES SAND
2 1
4,300m TVD
MILLER RESERVOIR
Topsides clean-up
Flush and purge process plant Clean major vessels Isolation of all energy sources Preparation for normally unattended operation
Integrity maintenance Installation of temporary systems
Topsides clean-up
Wireline/Logging Derrick Helideck Flare Tower Exhaust Tower
Accommodation
Power Generation
Accommodation
Power Generation
Process Gas
Derrick Sub-Structure Process Oil Temporary Generation Drilling and Well Bay
Accommodation
Power Generation
Derrick Sub-Structure Process Oil Temporary Generation Drilling and Well Bay
Accommodation
Power Generation
ST FERGUS MRF
BRAE A
BRAE B
MILLER PLATFORM
ST FERGUS MRF
MILLER PLATFORM
ST FERGUS MRF
MILLER PLATFORM
Glycol
Solvent
Surfactant
Gel
Gel
BRAE A
BRAE B
2008
2009
2010
2011
2012
2013
Preparatory Engineering Rig Readiness Wells P&A / Conductor Removal Hydrocarbon free Topsides Cleaning / Preparation NUI Ops Phase NUI
ONSHORE WORKS
Pipelines flushing Pipelines SSIV Removal Onshore Disposal Final Decom 2017+
Conclusions
Miller status
Oil and gas plant shutdown and purged Well abandonment 80% complete Pipeline flushing and NUI preparations ongoing Decommissioning programme and contracting strategies for removal being developed
Lessons
Pre-invest in well abandonment to reduce overall duration Complicated well design adds to decommissioning costs Plan to flush pipelines at final production Be aware of 3rd party and contract impacts on pipeline decommissioning