This document outlines the inspection and test program for SF6 gas insulated switchgear to be used in the construction of the 380kV Ras Al Khair substation. It details several component tests including for bushing current transformers, voltage transformers, the local control cubicle, disconnect and earthing switches, circuit breakers, and SF6/air bushings. Each test lists the applicable regulations and standards, describes the test or inspection, and notes whether the manufacturer or client company will participate or review the test reports. The program is designed to ensure all components meet specifications before and during installation and commissioning.
This document outlines the inspection and test program for SF6 gas insulated switchgear to be used in the construction of the 380kV Ras Al Khair substation. It details several component tests including for bushing current transformers, voltage transformers, the local control cubicle, disconnect and earthing switches, circuit breakers, and SF6/air bushings. Each test lists the applicable regulations and standards, describes the test or inspection, and notes whether the manufacturer or client company will participate or review the test reports. The program is designed to ensure all components meet specifications before and during installation and commissioning.
Original Description:
Inspection and test plan for Gas Insulated swithgear
This document outlines the inspection and test program for SF6 gas insulated switchgear to be used in the construction of the 380kV Ras Al Khair substation. It details several component tests including for bushing current transformers, voltage transformers, the local control cubicle, disconnect and earthing switches, circuit breakers, and SF6/air bushings. Each test lists the applicable regulations and standards, describes the test or inspection, and notes whether the manufacturer or client company will participate or review the test reports. The program is designed to ensure all components meet specifications before and during installation and commissioning.
This document outlines the inspection and test program for SF6 gas insulated switchgear to be used in the construction of the 380kV Ras Al Khair substation. It details several component tests including for bushing current transformers, voltage transformers, the local control cubicle, disconnect and earthing switches, circuit breakers, and SF6/air bushings. Each test lists the applicable regulations and standards, describes the test or inspection, and notes whether the manufacturer or client company will participate or review the test reports. The program is designed to ensure all components meet specifications before and during installation and commissioning.
The document outlines an inspection and test program for SF6 gas insulated switchgear. It details the various components that will be tested and the specific tests that will be conducted on each one.
The main components being tested include bushings, voltage transformers, disconnect and earthing switches, circuit breakers, and local control cubicles.
Tests include power frequency voltage tests, partial discharge measurements, dielectric tests, measurement of resistance, gas tightness tests, mechanical operation tests, timing tests, and SF6 gas density tests.
.
INSPECTION & TEST PROGRAM
I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 2 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC Component test 1. Bushing current transformer test 1) Polarity test 2) Exciting current characteristic test 3) Current ratio test 4) Dielectric test on secondary windings 5) Inter-turn voltage test 6) Measurement of error 7) Visual inspection of construction 8) Verification of terminal marking 9) Measurement of insulation resistance of secondary windings 10) Secondary winding resistance measurement 2. Voltage transformer test 1) Polarity test 2) Power frequency test on secondary winding 3) Ratio error 4) Power frequency withstand test on primary winding 5) Partial discharge measurement 6) Measurement of winding resistance 7) Insulation resistance test 8) Visual inspection of construction 9) Verification of terminal marking 10) Gas leakage test IEC 60044-1 8 IEC 60044-6 7 IEC 60044-2 9 H H H H H H H H H H H H H H H H H H H H R R R R R R R R R R R R R R R R R R R R MAKER or HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION W : WITNESS POINT S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 3 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC Component test 3. Local control cubicle 1) Visual check 2) Insulation test 3) Dielectric test 4) Measurement of insulation resistance 5) Wiring check/tests 6) Functional test 7) Control circuit test 8) Sequence test 9) Coil check test 4. Disconnect and Earthing Switch 1) Power frequency voltage tests on main circuit 2) Partial discharge measurement 3) Dielectric tests on auxiliary and control circuit 4) Measurement of the resistance of the main circuit 5) Design and visual check 6) Verification of correct wiring 7) Mechanical operation tests 8) Gas tightness test 9) Timing test 10) SF6 Gas density switch test Approval specification IEC 62271-203 7.2 IEC 60694 7.2 IEC 62271-102 7 H H H H H H H H H H H H H H H H H H H R R R R R R R R R R R R R R R R R R R MAKER or HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION W : WITNESS POINT S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 4 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC Component test 5. Circuit Breaker 1) Power frequency voltage tests on main circuit 2) Partial discharge measurement 3) Dielectric tests on auxiliary and control circuit 4) Measurement of the resistance of the main circuit 5) Verification of correct wiring 6) Hydraulic system pump-up time measurement 7) Hydraulic system pressure test 8) Hydraulic system leakage test 9) Mechanical operation tests 10) Gas tightness test 11) Design and visual check 12) Timing test 13) SF6 Gas density switch test 14) Pressure switch test 15) Stored energy test 6. SF6/Air Bushing Test 1) Dry power-frequency voltage withstand test 2) Measurement of partial discharge quantity 3) Internal pressure test on gas-filled, gas-insulated and gas-impregnated bushings 4) Tightness test on gas-filled, gas-insulated and gas-impregnated bushings 5) Tightness test at the flange or other fixing device 6) Visual inspection and dimensional check IEC 62271-100 7 IEC 60137 9.3 IEC 60137 9.4 IEC 60137 9.6 IEC 60137 9.8 IEC 60137 9.9 IEC 60137 9.10 H H H H H H H H H H H H H H H H H H H H H R R R R R R R R R R R R R R R R R R R R R MAKER or HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION W : WITNESS POINT S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 5 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC In-process inspection 1. Pressure tests of enclosures 2. Bushing current transformer test 1) Polarity test 2) Current ratio test 3) Visual inspection of construction 4) Verification of terminal markings 5) Measurement of insulation resistance of secondary windings 6) Excitation current characteristic 7) Measurement of secondary resistance 8) Dielectric test on secondary windings 9) Secondary winding short & isolate test and single point earthing test 10) Inter-turn voltage test 11) Measurement of error 3. Voltage Transformer Test 1) Visual inspection of construction 2) Verification of terminal marking 3) Gas leakage test 4. Local Control Cubicle 1) Visual check 2) Insulation test 3) Dielectric test 4) Control circuit test 5) Measurement of insulation resistance 6) Wiring check/tests 7) Functional test 8) Coil check test 9) Sequence test ASME Code , Div.1 IEC 60044-1 8 IEC 60044-6 7 IEC 60044-2 9 Approval specification IEC 62271-203 7.2 IEC 60694 7.2 H H H H H H H H H H H H H H H H H H H H H H H H R R R R R R R R R R R R R R R R R R R R R R R R HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION W : WITNESS POINT S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 6 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC In-process inspection 5. Disconnect and Earthing Switch 1) Power frequency voltage tests on main circuit 2) Partial discharge measurement 3) Dielectric tests on auxiliary and control circuit 4) Measurement of the resistance of the main circuit 5) Design and visual check 6) Verification of correct wiring 7) Mechanical operation tests 8) Gas tightness test 9) Timing test 10) SF6 Gas density switch test 6. Circuit Breaker 1) Power frequency voltage tests on main circuit 2) Partial discharge measurement 3) Dielectric tests on auxiliary and control circuit 4) Measurement of the resistance of the main circuit 5) Verification of correct wiring 6) Hydraulic system pump-up time measurement 7) Hydraulic system pressure test 8) Hydraulic system leakage test 9) Mechanical operation tests 10) Gas tightness test 11) Design and visual check 12) Timing test 13) SF6 Gas density switch test 14) Pressure switch test 15) Stored energy test IEC 62271-102 7 IEC 62271-100 7 H H H H H H H H H H H H H H H H H H H H H H H H H R R R R R R R R R R R R R R R R R R R R R R R R R HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION W : WITNESS POINT S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 7 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC In-process inspection 7. SF6/Air Bushing Test 1) Dry power-frequency voltage withstand test 2) Measurement of partial discharge quantity 3) Internal pressure test on gas-filled, gas-insulated and gas-impregnated bushings 4) Tightness test on gas-filled, gas-insulated and gas-impregnated bushings 5) Tightness test at the flange or other fixing device 6) Visual inspection and dimensional check 8. Pressure test on partitions IEC 60137 9.3 IEC 60137 9.4 IEC 60137 9.6 IEC 60137 9.8 IEC 60137 9.9 IEC 60137 9.10 IEC 62271-203 7.104 H H H H H H H R R R R R R R HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION W : WITNESS POINT S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 8 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC Routine test 1. Construction & dimension check 2. Measurement of the resistance of the main circuit & closing, tripping coils 3. Sequence test 4. Mechanical operation test 1) Circuit breaker 2) Disconnection s/w & Earthing s/w 3) CB Anti-pumping test 4) CB stored energy test 5) VT primary isolation device 5. Dielectric tests 1) Power frequency withstand voltage test 2) Partial discharge measurements 6. Bushing current transformer test 1) Polarity test 2) Measurement of insulation resistance secondary windings 3) Dielectric test on secondary windings 4) Secondary winding short & isolate test and single point earthing test 5) Verification of terminal marking 6) Measurement of secondary resistance at 75 7) Turns ratio error 8) Exciting current characteristic test 9) Visual inspection of construction Approval specification IEC 62271-203 7.3 IEC 60694 7.3 Approval specification IEC 62271-203 7.102 IEC 60694 5.6, 5.8 IEC 62271-100 7.101 IEC 62271-102 7.101 IEC 62271-203 7.1 IEC 60694 7.1 IEC 60044-1 8 IEC 60044-6 7 H H H H H H H H H H H H H H H H H H H W W W W W W W R W W R R R R R R R R R HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION * W : Witness for Sampling Bay (1 Bay) - C14 Bay. S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm) . INSPECTION & TEST PROGRAM I.T.P No. : HCB - 2011 - 070 REV. No : 0 PAGE : 9 of 9 CLIENT : SAUDI ELECTRICITY COMPANY EASTERN OPERATING AREA PROJECT NAME EQUIPMENT : SF 6 GAS INSULATED SWITCHGEAR 420kV 63kA 3150A CONSTRUCTION OF RAS AL KHAIR 380kV SUBSTATION CLASSIFICATION DESCRIPTION OF TEST & INSPECTION APPLICABLE REGULATION OR RULE PARTICIPATION BY COMPANY / PLACE HHI SEC Routine test 7. Measurement of insulation resistance 1) Main circuit 2) Control and auxiliary circuit 8. Gas tightness test 9. SF6 gas density switch test (Operating pressure) 10. Test of auxiliary electrical, hydraulic devices 11. Local control cubicle (LCC) 1) Visual check 2) Wiring test 3) Functional test (Control circuit & sequence test) 4) Insulation test 5) Dielectric test on auxiliary and control circuit. 12. Voltage transformer test 1) Verification of terminal marking 2) Gas leakage test 3) Dielectric test on secondary winding 13. 10kV isolation test for earth switches poles with enclosure - IEC 62271-203 7.4/60694 7.4 Approval specification Approval specification Approval specification IEC 62271-203 7.2 IEC 60694 7.2 IEC 60044-2 9 - H H H H H H H H H H H H H H W R R R W W W W R R R R R R HHI/ULSAN REMARKS H : HOLDING POINT T : TOTAL INSPECTION * W : Witness for Sampling Bay (1 Bay) - C14 Bay. S : SAMPLE INSPECTION R : REPORT REVIEW N/A : NOT APPLICABLE HHI A24-418(B)-1 A4(297mm X 210mm)