Contoh SOP
Contoh SOP
I.
PURPOSE :
1. Replace CT on Outgoing Panel Switchgear at Power Plant
2. Check Nitrogen of Gatra Transformer.
II.
PREPARATION :
1. Hi-line tools. ( Hot line tools )
2. Electric tools
3. Man power.
III. PROCEDURE :
1. Prepare SOP, JSA and Work Permit.
2. Safety meeting prior Job execution.
IV. EXECUTION :
1. Prepare tools, materials and set up man power to conduct the JOB.
2. The weather must be clear / No Rain.
3. Shutdown Generator No. 2
4. Hi-Line crew coordination with other sections, Power Plant dispatcher, Production,
Artificial Lift and Power Plant dispatcher.
TRANSFER LOAD FROM OCB #1 TO VCB #ECHO
5. Hi-Line crew to do:
a. Coordination with Production field and Electric Construction crew to shut
down all wells Coordination with KMT Power Plant Operator to open breaker
of OCB-1.
b. Coordination Power Plant to Opened feeder Transformer.
c. Hi-Line crew Open DS (Disconnecting Switch) at load side transformer.
d. Hi-Line crew connection grounding tools on HV bushing line of Transformer.
e. Close main line fuse near Reda Pump of OCB-1
f. Coordination with Production field and Electric Construction crew to re-stared
all wells
POWER PLANT SCOPE:
6. Double check all installation from Generator, Switchgear and transformer was open
and grounding all phase to make sure there was no electric power remain at busbar.
Prepared by,
(__________)
Acknowledged by,
Approved by,
Cc : Production
Artificial lift
Fire Safety
Power Plant
File