Method Statement For Demolition & Modification Works at Existing Retaining Wall RW5
Method Statement For Demolition & Modification Works at Existing Retaining Wall RW5
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 1 of 47
Issue Date
10-2-2014
Status
Prepared by
Engineer /
Construction
Manager
Reviewed by
Reviewed by
QA Manager
Safety Manager
Thomas Tiu
Helen Tong
Alex Lam
1st
Submission
Date:
10-2-2014
Date:
Reviewed by
Senior Construction
Manager
Date:
Approved by
Project Manager
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 2 of 47
Colbert Cheung
Date:
Wilson Chu
Date:
Content
Page
1.
2.
3.
4.
5.
Appendices:
-
23
Ref.: MS/FND/038
Revision : -
1.
Date: 10-2-2014
Page: 3 of 47
Ref.: MS/FND/038
Revision : -
Page: 4 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 5 of 47
Ref.: MS/FND/038
Revision : -
Page: 6 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 7 of 47
Ref.: MS/FND/038
Revision : -
Page: 8 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 9 of 47
Ref.: MS/FND/038
Revision : -
Page: 10 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 11 of 47
Ref.: MS/FND/038
Revision : -
Page: 12 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 13 of 47
Ref.: MS/FND/038
Revision : -
Page: 14 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 15 of 47
Ref.: MS/FND/038
Revision : -
Page: 16 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
2.
Date: 10-2-2014
Page: 17 of 47
ii)
Saw cut a 50m depth groove on concrete surface along the cut line as per the Figure 8.
iii)
The upper portion will be hacked / broken by a mini-breaker from top down to approx.
0.6m above the groove as per the Figure 9.
iv)
Hack / Break the lower 600mm height portion with handheld breaker as per the Figure 10.
v)
vi)
ii)
iii)
Drill in holes for anchor reinforcement (Dia. 48mm holes, 1135mm depth @150c/c at top
row and Dia. 32mm holes, 710mm depth @150c/c at bottom row as per the Figure 11.)
iv)
Insert T25 anchor reinforcement and grout with HILTI HY-150 at bottom row
v)
Insert T40 anchor reinforcement and grout with HILTI HY-150 at top row
vi)
vii)
viii)
ix)
Place concrete
Demolition of upper portion by wire cutting method or saw cutting method. The wall will be
divided into number panels, each panel max weight of 8ton (approx. size 2m(L) x 0.7m(W)
x 2.4m(H) as per the Figure 12
Ref.: MS/FND/038
Revision : -
ii)
Date: 10-2-2014
Page: 18 of 47
Core 2 numbers of 100mm diameter holes on each panel for lifting and core a 50mm
diameter hole at the intersection of vertical cut-line and horizontal line as per the Figure
13.
Ref.: MS/FND/038
Revision : -
iii)
Date: 10-2-2014
Page: 19 of 47
Wire cut along horizontal cut line to divide the panel from lower wall stem as per the
Figure 14.
iv)
Attach Lifting slings go through the cored holes and hold the panel before vertical cutting
as per the Figure 15
v)
Wire cut or saw cutting along the vertical cut-line. The panel will be lifted and laid inside
the dump truck for disposal.
vi)
vii)
Hack / break the lower 1m height portion with handheld breaker as per the Figure 16.
viii)
Cut and remove abandoned reinforcement except the starters. Bend-in the top of start into
the wall and make-good the wall head with concrete or non-shrink grout as per the Figure
17.
2.4. Demolition at part of wall tow to form 3 nos of re-bays for mini-pile construction (Bay 2 to 4)
i)
Expose the existing wall toe at mini-pile cap locations as per the Figure 18.
ii)
Hack / break the wall toe at mini-pile location with handheld pneumatic breaker
iii)
iv)
Make good the concrete edge to form the re-bay to suit the pile cap size.
Ref.: MS/FND/038
Revision : -
Page: 20 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Page: 21 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Page: 22 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 23 of 47
Ref.: MS/FND/038
Revision : -
Page: 24 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 25 of 47
Ref.: MS/FND/038
Revision : -
Page: 26 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Page: 27 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Page: 28 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 29 of 47
Figure 12 Paneling of Wire Cutting (Max. 8 ton in weight) (Approx. 2m (L) x 2.1m (H) x 0.7m (W))
Ref.: MS/FND/038
Revision : -
Page: 30 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 31 of 47
Ref.: MS/FND/038
Revision : -
Page: 32 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 33 of 47
Figure 14 Cutting and Divide a Panel from Wall along Horizontal Cut-line
Figure 15 Removing the Wall panel by Cutting along the Horizontal Cut-Line
Ref.: MS/FND/038
Revision : -
Page: 34 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Page: 35 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 36 of 47
Ref.: MS/FND/038
Revision : -
Page: 37 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Date: 10-2-2014
Page: 38 of 47
Ref.: MS/FND/038
Revision : -
Page: 39 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
3.
1.
2.
3.
4.
5.
6.
7.
8.
1 no.
1 nos
1 nos
1 nos.
2-3 nos.
1 set
1 set.
1 no.
5.
Page: 40 of 47
Figure 18 Hack-off the Wall Top and Forming a Re-bay for Mini-pile Construction
Plants and Equipments
i)
4.
Date: 10-2-2014
All workers are required to wear safety helmet, safety shoe and reflective safety vest
Pre-work briefing, safety induction course and safety tool box training shall be provided to
the workers prior commencement of the work.
Crane lorry should be equipped with safe load indicator. Examination of crane in
accordance with F&IU Regulation
All lifting gears should be certified by RPE before use.
Rigger should select the suitable lifting gear, i.e. Chain sling, wire/nylon rope according to
the safe working load.
Lifting operation will be aborted in case of Typhoon Signal No. 3 or above, Amber / Red
Black Rainstorm and Thunderstorm Warning is/are hoisted.;
Person-in charge and Banksman will use walky-talky to ensure good communication with
rigger and crane lorry operator.
Competent operator shall be employed and he shall check crane condition
Provide proper access and supervision
Regularly check the generator & electrical tools by registered electrician; Provide proper
earth-rod; provide emergency stop bottom; provide fire extinguisher; Stop the generator
when refuelling.
Ref.: MS/FND/038
Revision : -
Page: 41 of 47
Appendix 1
Catalogue of Remote Robot BROKK 90
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Appendix 2
Catalogue of Wire Cutting Machine
Page: 42 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Appendix 3
Catalogue of Coring Machine
Page: 43 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Appendix 4
Catalogue of 30Ton Mobile Crane
Page: 44 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Appendix 5
Catalogue of Excavator
Page: 45 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Appendix 6
Rick Assessment
Page: 46 of 47
Date: 10-2-2014
Ref.: MS/FND/038
Revision : -
Appendix 7
Inspection and testing Plan
Page: 47 of 47
Date: 10-2-2014