API 510 QUIZ No.3
API 510 QUIZ No.3
API 510 QUIZ No.3
E
(
C
C
T
I
I
C
O
)
Quiz No. 3
1. External inspections are normally performed by
a. The examiner
b. The inspector
c.The owner/user
d. Any of the above
2. Buried
vessels
shall
be
their external surface condition
obtained from
inspected
to
determine
,the corrosion rate information
4. Inspection
for
CUI
shall
be
considered
for
externally-insulated vessels and those that are in intermittent service or
operate between
a.10C and 350C for carbon and low alloy steels
b.140C and 350C for austenitic stainless steels
c.A and B
d.None of the above
5. it is not necessary to remove the insulation for inspection of the vessel
a.If external coverings are in good condition
b.If no evidence of fluid leakage.
c.
If Equipment is not in intermittent service
d.All of the above
6. The minimum hydro test temperature for in-service vessel of 2 thickness is:
a. MDMT+10 F
b. MDMT+30F
c.
MDMT+ 0C
d. MDMT+ 15C
7. When the service is changed from highly corrosive medium to clean non
corrosive hydrocarbon service
El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161
E
(
C
C
T
I
I
C
O
)
The
The
The
The
El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161
d.
E
(
C
C
T
I
I
C
O
)
None of above
15. Calculate the remaining life of a vessel given the following data: Actual
thickness = 0.955 inch. Minimum thickness required = 0.787 inch Thickness at
pervious inspection 5 years prior to present inspection = 1.015 inch
a.
b.
c.
d.
20 years
14 years
28 years
None of the above
16. A pressure vessel constructed according to ASME Sec VIII Div 1 with shell
thickness 7/8 (Material of Construction SA 387 gr 11 cl.1) is to be repaired by
using insert plates. The requirement of radiography to be incorporated in repair
procedure shall be:.
a.
b.
c.
d.
Full radiography
Spot radiography
May be a, or b depending on joint efficiency
Data is not adequate
17. For non-continuous corrosive service with remaining life 25 years, external
inspection shall be performed not later than:
a.
b.
c.
d.
10 years
12.5 years
5 years
None of above
18. A pressure vessel has been in service for 12 years and has a history of
corrosion over its service life. The original thickness was 1.9375 inches; the
current thickness is 1.405 inches. What is the corrosion rate for this vessel?
a.
b.
c.
d.
0.044
0.089
0.266
0.532
inch
inch
inch
inch
per
per
per
per
year
year
year
year
19. What will be total thinning (metal loss) up to next inspection due after 10
more years if Corrosion rate is 6 mills per year (mpy).
a.
b.
c.
d.
0.05 inch
0.06 inch
0.006 inch
0.6 inch
El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161
d.
E
(
C
C
T
I
I
C
O
)
21. Materials used for making repair by welding in carbon steel vessels shall have
the following limitations?
a.
b.
c.
d.
22. For non-continuous corrosive service with remaining life 25 years, internal
inspection shall be performed not later than:
a.
b.
c.
d.
10 years
12.5 years
5 years
None of above
23. Calculate the remaining life and external insp. interval of a vessel given the
following data:
Actual thickness = 0.955 inch
Minimum thickness required = 0.755 inch
Thickness at previous inspection 5 years prior to present inspection = 1.025 inch
a.
b.
c.
d.
20 years, 10 years
14 years, 5years
28 years, 10 years
None of the above
24. A vessel which was inspected six years ago and had shell thickness = 0.870.
As on today the thickness as reported by filed inspection is 0.786. What was
the corrosion rate over last six years?
a.
b.
c.
d.
10 mpy
12 mpy
14 mpy
none of above
25. Which of the following are commonly preferred to know the process side
degradation of pressure vessels?
a.
b.
c.
d.
On stream inspection.
Internal inspection
External inspection as alternative to internal inspection
Any of above is OK
El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161
E
(
C
C
T
I
I
C
O
)
26. Before carrying out an internal service inspection on a vessel put in-service
for quite some time what the inspector should do first
a.
b.
c.
d.
Check
Check
Check
Check
the
the
the
the
27. A pressure vessel of 60 has three pits within a circle of 7 diameter. The
nominal thickness of the shell is 0.75 and the CA is 0.125. The details and
dimensions of the pits are listed below. Your assessment is:
a.
b.
c.
d.
The
The
The
The
28. For a new vessel the corrosion rate will be established based on:
a.
b.
c.
d.
Run the vessel for 3 or 6 weeks and establish the corrosion rate
Run the vessel for 3 or 6 months and establish the corrosion rate
Run the vessel for 18 weeks and establish the corrosion rate
After 1000 working hours
29. For MAWP calculations as per API 510, the thickness as determined by
inspection shall be used in these calculations after:
a.
b.
c.
d.
30. A vessel in service has different zones of corrosion. The next inspection
frequency will be decided by:
a.
b.
c.
d.
El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161
E
(
C
C
T
I
I
C
O
)
32. During Hydrostatic testing, risk of brittle fracture, which of the following
action may be taken
a.
b.
c.
d.
33. Which of the following are essential elements of a Quality Assurance system of
a repair organization of relive device?
a.
b.
c.
d.
their documentation
El Serag Mall Towers, Tower No. 2, Entrance No. 3, Flat No.81, Nasr city, Cairo, Egypt
E-mail:i.desoky@cic-egypt.com
E-mail: admin@cic-egypt.com
Web:
www.cic-egypt.com
Mob. 0121 47464749 Mob. 011 484 14 904
Fax: +2 02 26707979
Tel: +2 0226702161