Platform Installation.................................................................................................................25
About platform installation................................................................................................25
Determining which rack mounting kit to use.....................................................................25
About general recommendations for rack mounting.........................................................25
About the front-mounting kit.............................................................................................25
Front-mounting kit hardware..................................................................................25
Installing using a front-mounting kit.......................................................................26
About the quick-install rail kit............................................................................................26
Installing the rail lock brackets.........................................................................................27
About grounding the platform...........................................................................................28
Connecting the ground lug to the ground terminal................................................29
Table of Contents
Platform Maintenance...............................................................................................................33
About platform maintenance............................................................................................33
About AC power supplies.................................................................................................33
Installing an AC power supply...............................................................................34
About DC power supplies.................................................................................................35
Wiring the DC power supply terminal block...........................................................36
Installing a DC power supply.................................................................................37
About the fan tray.............................................................................................................38
Replacing the fan tray............................................................................................39
About the hard disk drives................................................................................................39
Troubleshooting a failed hard disk drive................................................................39
About hard disk drive replacement on a 10.1 and later system............................40
About hard disk drive replacement on a 10.0 or 9.x system.................................43
Environmental Guidelines........................................................................................................45
General environmental and installation guidelines...........................................................45
Guidelines for AC-powered equipment............................................................................46
Guidelines for DC-powered equipment............................................................................46
Platform airflow diagram..................................................................................................47
Platform Specifications............................................................................................................49
General specifications for system features......................................................................49
Platform hardware specifications.....................................................................................49
Platform environmental operating specifications..............................................................50
Platform power specifications..........................................................................................51
Safety requirements.........................................................................................................51
EMC requirements...........................................................................................................52
Acoustic, airflow, and altitude specifications....................................................................53
Table of Contents
Table of Contents
Legal Notices
Publication Date
This document was published on September 29, 2015.
Publication Number
MAN-0330-03
Copyright
Copyright 2013, F5 Networks, Inc. All rights reserved.
F5 Networks, Inc. (F5) believes the information it furnishes to be accurate and reliable. However, F5 assumes
no responsibility for the use of this information, nor any infringement of patents or other rights of third
parties which may result from its use. No license is granted by implication or otherwise under any patent,
copyright, or other intellectual property right of F5 except as specifically described by applicable user
licenses. F5 reserves the right to change specifications at any time without notice.
Trademarks
AAM, Access Policy Manager, Advanced Client Authentication, Advanced Firewall Manager, Advanced
Routing, AFM, APM, Application Acceleration Manager, Application Security Manager, ARX, AskF5,
ASM, BIG-IP, BIG-IQ, Cloud Extender, CloudFucious, Cloud Manager, Clustered Multiprocessing, CMP,
COHESION, Data Manager, DevCentral, DevCentral [DESIGN], DNS Express, DSC, DSI, Edge Client,
Edge Gateway, Edge Portal, ELEVATE, EM, Enterprise Manager, ENGAGE, F5, F5 [DESIGN], F5 Certified
[DESIGN], F5 Networks, Fast Application Proxy, Fast Cache, FirePass, Global Traffic Manager, GTM,
GUARDIAN, iApps, IBR, Intelligent Browser Referencing, Intelligent Compression, IPv6 Gateway,
iControl, iHealth, iQuery, iRules, iRules OnDemand, iSession, L7 Rate Shaping, LC, Link Controller, Local
Traffic Manager, LTM, LineRate, LineRate Systems [DESIGN], LROS, Message Security Manager, MSM,
OneConnect, Packet Velocity, PEM, Policy Enforcement Manager, Protocol Security Manager, PSM, Real
Traffic Policy Builder, ScaleN, Signalling Delivery Controller, SDC, SSL Acceleration, StrongBox, SuperVIP,
SYN Check, TCP Express, TDR, TMOS, Traffic Management Operating System, Traffix Systems, Traffix
Systems (DESIGN), Transparent Data Reduction, UNITY, VAULT, VIPRION, vCMP, VE F5 [DESIGN],
Virtual Clustered Multiprocessing, WA, WAN Optimization Manager, WebAccelerator, WOM, and
ZoneRunner, are trademarks or service marks of F5 Networks, Inc., in the U.S. and other countries, and
may not be used without F5's express written consent.
All other product and company names herein may be trademarks of their respective owners.
Export Regulation Notice
This product may include cryptographic software. Under the Export Administration Act, the United States
government may consider it a criminal offense to export this product from the United States.
RF Interference Warning
This is a Class A product. In a domestic environment this product may cause radio interference, in which
case the user may be required to take adequate measures.
FCC Compliance
This equipment has been tested and found to comply with the limits for a Class A digital device pursuant
to Part 15 of FCC rules. These limits are designed to provide reasonable protection against harmful
Legal Notices
interference when the equipment is operated in a commercial environment. This unit generates, uses, and
can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual,
may cause harmful interference to radio communications. Operation of this equipment in a residential area
is likely to cause harmful interference, in which case the user, at his own expense, will be required to take
whatever measures may be required to correct the interference.
Any modifications to this device, unless expressly approved by the manufacturer, can void the user's authority
to operate this equipment under part 15 of the FCC rules.
Canadian Regulatory Compliance
This Class A digital apparatus complies with Canadian ICES-003.
Standards Compliance
This product conforms to the IEC, European Union, ANSI/UL and Canadian CSA standards applicable to
Information Technology products at the time of manufacture.
VCCI Class A Compliance
This is a Class A product. In a domestic environment, this product may cause radio interference, in which
case the user may be required to take corrective actions. VCCI-A
1. Management port
2. USB ports
3. Console port
4. Hard-wired failover port
5. 10/100/1000 interfaces
6. SFP ports
7. SFP+ ports
8. Indicator LEDs
9. LCD display
10. LCD control buttons
Figure 1: Front view of the platform
Hardware
Front-mounting kit
Rail-mounting kit
Front bezel
Description
Network hubs, switches, or connectors to connect You must provide networking devices that are compatible
to the platform network interfaces
with the network interface cards installed in the platform.
You can use either 10/100/1000 Ethernet or 10 Gigabit
Ethernet switches.
External USB CD/DVD drive or USB flash drive You can use any USB-certified CD or DVD mass storage
device for installing upgrades and for system recovery.
Note: External CD/DVD drives must be externally
powered.
Serial terminal console
Management workstation on the same IP network You can use the default platform configuration if you
as the platform
have a management workstation set up.
LCD panel
The LCD panel provides the ability to manage the unit without attaching a console or network cable.
10
Description
Backlight
Contrast
On Brightness
Off Brightness
Screens menu
You can use the Screens menu to specify the information that is displayed on the default screens.
Option
Description
DateScreen
InfoScreen
MACscreen
SysinfoScreen
TMMAuthScreen
TMMCPUScreen
TMMMemoryScreen
TMMStatScreen
11
Option
Description
VersionScreen
System menu
You can use the System menu to view options for rebooting, halting, and netbooting the hardware. This
menu also provides options for configuring the management interface.
Option
Description
Management
Serial Speed
Changes the baud rate of the serial port. Select from the
following options:
9600
19200 (default)
57600
115200
Reboot
Halt
Netboot
Pausing on a screen
Normally, the screens cycle on the LCD panel at a constant rate, but you can pause on a specific screen.
Push the Check button to toggle the LCD screen between Hold and Rotate modes.
In Hold mode, a single screen is displayed. The Rotate mode changes the screen displayed on the LCD
every four seconds.
12
Press the X button, then use the arrow keys to navigate to the System menu.
Press the Check button.
Navigate to the Halt menu.
Press the Check button.
Press the Check button again at the confirmation screen.
Wait 30 seconds before powering the machine off or rebooting it.
Clearing alerts
Press the Check button to clear any alerts on the LCD screen.
You must clear any alerts on the screen before you can use the LCD panel.
Indicator LEDs
The behavior of each LED indicates the status of the system.
Description
Off (none)
13
Behavior
Description
Solid
Blinking
Intermittent
Status LED
When the unit is in a standard operating state, the Status LED behaves in a defined manner.
State
Description
off/none
green solid
yellow solid
yellow blinking
Power 2 state
Description
green solid
green solid
yellow solid
yellow solid
off/none
off/none
14
Action
Description
System situation
Emergency
Red blinking
Action
Description
Alert or Critical
Red solid
Error
Yellow blinking
15
Platform interfaces
Every platform includes multiple interfaces. The exact number of interfaces that are on the system depends
on the platform type.
Each interface on the platform has a set of properties that you can configure, such as enabling or disabling
the interface, setting the requested media type and duplex mode, and configuring flow control.
The following is an example of the output you might see when you issue this command on interface
1.2:
--------------------------------------------------------Net::Interface
Name Status Bits Bits Errs Errs Drops Drops Colli
In
Out
In
Out
In
Out sions
--------------------------------------------------------1.2
up 191.4K
0
0
0
374
0
0
16
The following is an example of the output you might see when you issue this command:
-----------------------------------------------------------Net::Interface
Name Status
Bits
Bits Errs Errs Drops Drops Colli
In
Out
In
Out
In
Out sions
-----------------------------------------------------------1.1
down
0
0
0
0
0
0
0
1.2
up 191.4K
0
0
0
374
0
0
1.3
down
0
0
0
0
0
0
0
1.4
up 22.5K
0
0
0
44
0
0
2.1
miss
0
0
0
0
0
0
0
2.2
miss
0
0
0
0
0
0
0
mgmt
up 43.2G 160.0G
0
0
0
0
0
17
By default, the media type on interfaces is set to automatically detect speed and duplexsettings, but you can
specify a media type as well. Use the following syntax to set the media type:
tmsh modify net interface <interface_key> media <media_type> | auto
If the media type does not accept the duplex mode setting, a message appears. If media type is set to auto,
or if the interface does not accept the duplex mode setting, the duplex setting is not saved to the
/config/bigip_base.conf file.
Important: If you manually configure the platform to use specific speed and duplex settings on interfaces,
Auto-MDI/MDIX functionality is disabled by default. When an interface is set manually, it functions as a
data terminal equipment (DTE) port. This means that crossover cables are required to connect to other
DTE devices (such as servers), and straight-through cables are required for connecting to data
communications equipment (DCE) devices (for example, switches or routers). Be sure to use the correct
cable type (straight-through or crossover) if you manually set interface speed and duplex settings.
Important: Starting with BIG-IP software versions 9.4.8 and 10.1.0, Auto-MDI/MDIX functionality is
retained when you manually configure an interface to use specific speed and duplex settings. With these
versions of the BIG-IP system, you can use either a straight-through cable or a crossover cable when media
settings are forced, and you will be able to successfully link to either DTE or DCE devices.
Important: In all Gigabit Ethernet modes, the only valid duplex mode is full duplex.
The following is an example of the output you might see when you issue this command on interface
1.3:
net interface 1.3 {
media-capabilities {
none
auto
10T-FD
10T-HD
100TX-FD
100TX-HD
1000T-FD
1000T-HD
18
}
}
100BaseTX full
10BaseT full
1000BaseLX full
10GBaseER full
1000BaseCX full
10GBaseLR full
1000BaseT half
10GBaseSR full
1000BaseT full
10GBaseT full
1000BaseSX full
10SFP+Cu full
auto
40GBaseSR4 full
none
40GBaseLR4 full
no-phy
100BaseTX half
Speed LED
Activity LED
No Link
Not lit
Not lit
Yellow blinking
Yellow solid
Yellow blinking
Green blinking
Yellow solid
Yellow blinking
Yellow solid
Green blinking
Green solid
Yellow blinking
Green solid
Green blinking
19
Speed LED
Activity LED
No link
Not lit
Not lit
Yellow blinking
Yellow solid
Yellow blinking
Green blinking
Yellow solid
Yellow blinking
Yellow solid
Green blinking
Green solid
Yellow blinking
Green solid
Green blinking
Name
RTS
DTR
TX
GND
GND
RX
CTS
20
Pin number
Name
RTS
DTR
CTS
GND
GND
DSR
TX
RX
Always-On Management
The Always-On Management (AOM) subsystem enables you to manage the BIG-IP system remotely using
SSH or serial console, even if the host is powered down. The AOM Command Menu operates independently
of the BIG-IP Traffic Management Operating System (TMOS).
You can use the command menu to reset the unit if TMOS has locked up, or get access to TMOS directly,
so that you can configure it from the command line interface.
AOM consists of the host console shell (hostconsh) and the AOM Command Menu, which contains the
options for AOM.
Note: The available functionality and options in AOM vary depending on the platform type.
Description
Reboot Host subsystem (sends Reboots the host subsystem. In this case, the Traffic
reboot command)
Management Operating System (TMOS) is rebooted.
Reset AOM subsystem (issues Resets the AOM subsystem. In this case, the system is
hardware reset--USE WITH
reset with a hardware reset.
CARE!)
Important: We do not recommend using this option
under normal circumstances. It does not allow for
graceful shutdown of the system.
21
Number/Letter Option
Description
Power off/on Host subsystem Powers off the Host subsystem. In this case, TMOS is
(issues hardware
powered off. If the Host subsystem is already powered
shutdown--USE WITH CARE!) off, this option powers on the Host subsystem.
22
23
Platform Installation
Platform Installation
Quantity
Hardware
front-mounting brackets
5. Attach the front bezel to the unit by grasping the bezel on either side using the indentations provided.
Note: Failure to use the indentations could result in pinched fingers.
If the rack you have does not provide adequate support for the unit, you might need a shelf kit. We recommend
that you use a shelf kit created by the rack manufacturer, if available.
26
The rails snap into place in the rack, and no tools are required to install a platform using this kit. The rails
are optimized for installation into square hole cabinets, but they can be installed in other cabinet styles, such
as round hole cabinets, using the screws provided. The rails are easily converted to mount to either cabinet
style.
For information about installing the platform using the quick-install rail kit, see the instruction guide provided
by the manufacturer, which is included with the kit hardware.
Note: Before you install this platform, review the environmental guidelines to make sure that you are
installing and using the platform in the appropriate environment.
After installing the platform, you should secure it to the rack using the included rail locks. You should also
attach the front bezel to the unit by grasping the bezel on either side using the indentations provided.
27
Platform Installation
2. Secure the rail lock brackets to the rack on each side of the unit using either a rack manufacturer-provided
screw or one #10-32 and one #8-32 screw provided with the kit per side.
The #8-32 screw goes through the bottom hole on the bracket, and the #10-32 screw goes through the
top hole.
Use 6 to 7 inch-pounds (0.7 to 0.8 Newton-meters) of torque on these screws.
28
Important: All copper grounding cable compression-type terminal lugs used for grounding must meet all
appropriate UL standards.
Note: The platform must be grounded to a common bonding network (CBN).
29
Platform Installation
4. Connect the serial failover cable to the failover port on each unit if you plan to set up device service
clustering (DSC) with hard-wired failover capacity.
For more information about configuring failover, see BIG-IP Device Service Clustering: Administration.
5. If you have not already done so, power on the unit.
You can now assign a management IP address to the system, and then license and provision the software.
Optionally, you should run the latest version of the qkview utility. This utility collects configuration and
diagnostic information about your system into a single file that you can provide to F5 Technical Support
to aid in troubleshooting. For more information, see
http://support.f5.com/kb/en-us/solutions/public/1000/800/sol1858.html.
1.
2.
3.
4.
5.
6.
7.
8.
9.
30
31
Platform Maintenance
AC power supply
DC power supply
Fan tray
Hard drive
The platform supports power redundancy, which ensures that the system is unaffected if a single power
supply fails in a system containing more than one power supply.
Caution: Running without power supplies installed in all available bays in the platform can affect cooling
and electromagnetic interference (EMI). If you need to run the unit with fewer power supplies, you must
install a blank supply bracket into any empty power supply bays. The blank supply bracket is required to
maintain proper airflow in the system. If you do not have a blank supply bracket, leave all supplies installed
and unplug any unused power supplies.
Caution: As a safety precaution, the socket outlet must be installed near the equipment and be easily
accessible.
Platform Maintenance
Important: This product is sensitive to electrostatic discharge (ESD). F5 Networks recommends that you
use proper ESD grounding procedures and equipment when you install or maintain the unit.
Important: F5 Networks strongly recommends that you use only one power supply type (AC or DC) in a
platform.
Note: Depending on the model and revision of the power supply, you might need either a Phillips or a
slotted screwdriver to replace the power supply.
3. Grasp the ejector handle and rotate it downward to eject the power supply from the system.
4. Remove the power supply from the system by pulling straight toward you.
5. Ensure that the latch on the new power supply is in the down position and slide the power supply into
the power supply slot until the latch engages.
6. Rotate the latch upward to fully seat the power supply.
7. Tighten the screw into place.
The power supply is connected to the system when you tighten the screw completely.
8. Attach the power cord to the new power supply.
34
9. Ensure that the power switch, located on the power supply next to the screw, is in the ON position.
Caution: Before installing a DC power supply, be sure that the DC power source for the rack is powered
off.
Caution: Running without power supplies installed in all available bays in the platform can affect cooling
and electromagnetic interference (EMI). If you need to run the unit with fewer power supplies, you must
install a blank supply bracket into any empty power supply bays. The blank supply bracket is required to
maintain proper airflow in the system. If you do not have a blank supply bracket, leave all supplies installed
and unplug any unused power supplies.
35
Platform Maintenance
Caution: Before you begin to work with one of these platforms, refer to the DC-powered equipment
environmental warnings for this platform and review any safety requirements for the facilities where the
DC-powered platforms will be installed.
Important: This product is sensitive to electrostatic discharge (ESD). F5 Networks recommends that you
use proper ESD grounding procedures and equipment when you install or maintain the unit.
Important: The platform must be installed in a RESTRICTED ACCESS LOCATION, such as a central
office or customer premises environment.
Note: All copper grounding cable used for grounding must meet all appropriate UL standards.
Note: You should coat bare conductors with an appropriate antioxidant compound before you make crimp
connections. You should bring all unplated connectors, braided strap, and bus bars to a bright finish and
then coat them with an antioxidant before you connect them.
Note: The platform must be grounded to a common bonding network (CBN).
Note: The battery return terminals on the platform are in an isolated DC return (DC-I) configuration.
The DC power supply for the 8900 platform includes a DC terminal block. You connect the wires to the
terminal block and then insert the terminal block into the DC power supply.
1. Review the DC power supply label and determine the correct wire size for your installation.
2. Use the wire stripping tool to remove 3/8 inch (9.56 mm) of insulation.
Important: Be sure to remove the appropriate amount of insulation from each wire. If you remove too
much insulation, exposed wire protruding from the terminal block can create an electrical hazard. If
you do not remove enough insulation, the wire might not make proper contact with the terminal.
3. Thread the wires through the bottom of the terminal block, with the positive DC wire (typically red) on
the left, the chassis ground wire in the middle, and the negative DC wire (typically black) on the right.
Note the orientation of the keying notch on the terminal block. When the keying notch is up, the positive
terminal is on the left.
36
4. Insert each exposed wire into the appropriate connector on the terminal block.
If necessary, use a small flat head screwdriver to loosen the screws above the openings in the terminal
block to open the terminal connectors.
5. Attach the wired half of the terminal block to the other half of the terminal block, and then connect the
top of the terminal block until the two halves click into place.
6. Tighten the wire clamp screws on the bottom of the terminal block using a small flat head screwdriver.
7. Insert the two gold screws that are provided with the DC power supply kit into the top and bottom of
the terminal block, and then use a Phillips screwdriver to secure the two halves.
37
Platform Maintenance
c) Grasp the ejector handle and rotate it downward to eject the power supply from the system.
d) Remove the power supply from the system by pulling straight toward you.
e) Ensure that the latch on the new power supply is in the down position, and then slide the power
supply into the power supply slot until the latch engages.
f) Rotate the latch upward to fully seat the power supply.
g) Tighten the screw into place.
Use 4 to 5 inch-pounds (0.45 to 0.56 Newton-meters) of torque on the screw. The power supply is
connected to the system when you tighten the screw completely.
4. Loosen the power supply screw on the DC power supply by using an appropriate screwdriver, if necessary.
5. Slide the DC power supply into the power supply slot.
6. Connect the terminal block that you assembled earlier to the DC power source and be sure to connect
the ground wire to a common bonding network (CBN).
7. Power on the DC power source.
If the system does not boot after you power on the DC power source, press the Check button on the LCD
panel to begin booting the system.
38
Recovery Procedure
39
Platform Maintenance
BIG-IP Version
Recovery Procedure
using RAID (redundant array of independent disks)
by default. For more information, see About hard
disk drive replacement on a 10.1 and later system.
10.0.0
9.x
Figure 11: The front of a platform with front bezel removed and the orientation of the drive bays
1. Drive bay 1
2. Drive bay 2
Figure 12: An example of a hard disk drive shown partially removed from the system
40
3. Make note of the bay number and serial number for the faulty hard disk drive.
Note: You can also locate the last seven digits of the serial number on the front of the drive. The serial
number is printed in its entirety on the labels, on top of the drive.
4. Before you physically remove the hard disk drive from the system, type the following command to
remove the faulty hard disk drive (HD2 in the example) from the array:
tmsh modify sys raid array MD1 remove HD2
5. (Optional) To ensure that you remove the correct drive, you can make the LED blink for that bay (bay
1 in the example.
tmsh modify sys raid bay 1 flash-led
The LED continues to blink until the new hard drive begins the replication process.
Note: If the drive is no longer responsive, the LED might not blink.
Next, you can physically remove the hard disk drive and replace it with the new one that you received from
F5 Networks. You do not have to power down the system before you remove the hard disk drive.
41
Platform Maintenance
The status of the replacement hard disk drive is undefined, and the serial number should match that of
the replacement drive.
Note: If after a few seconds, you do not see the recently-added hard disk drive in the disk summary,
the drive might not be seated properly. If this occurs, remove and reinsert the hard disk drive.
7. Add the replacement drive (HD2 in the example) to the array by typing the following command:
tmsh modify sys raid array MD1 add HD2
The status of the replacement drive should change to replicating, and the STAT LED should change to
solid green. The replication process typically takes between 15 and 45 minutes.
8. Attach the front bezel to the unit by grasping the bezel on either side using the indentations provided.
Note: Failure to use the indentations could result in pinched fingers.
42
Figure 13: The front of a platform with front bezel removed and the orientation of the primary and
secondary hard disk drives
43
Environmental Guidelines
Install the rack according to the manufacturer's instructions and check the rack for stability before placing
equipment in it.
Build and position the rack so that once you install the platform, the power supply and the vents on both
the front and back of the unit remain unobstructed. The platform must have adequate ventilation around
the unit at all times.
Although not required, a 1U space between units makes it easier for you to remove the unit from the
rack in the event that the unit requires service. A 1U space between units also provides additional cable
routing options.
Leaving at least 100 mm of space from the front panel of the unit to the rack front or rack door provides
enough room for you to route the cables without excessive bending or insulation damage.
Do not allow the air temperature in the room to exceed 104F (40C).
Do not plug the unit into a branch circuit shared by more electronic equipment than the circuit is designed
to manage safely at one time.
Important: This product is sensitive to electrostatic discharge (ESD). F5 Networks recommends that you
use proper ESD grounding procedures and equipment when you install or maintain the unit.
Caution: Customers should not attempt to replace batteries. There is a risk of explosion if a battery is
replaced with an incorrect type. Field technicians should dispose of used batteries according to the
instructions.
Attention: Il y a risque d'explosion si la batterie est remplace par une batterie de type incorrect. Mettre
au rebut les batteries usages conformment aux instructions.
Environmental Guidelines
Use a 20 amp external branch circuit protection device to install the unit.
Use one power feed for each individual power supply.
Important: The platform must be installed in a RESTRICTED ACCESS LOCATION, such as a central
office or customer premises environment.
Note: The following guidelines apply to STATIONARY PLUGGABLE EQUIPMENT TYPE A with
simultaneous multiple connections to the AC MAINS SUPPLY:
The building installation shall provide a means for connection to protective earth; and
The equipment is to be connected to that means; and
A SERVICE PERSON shall check whether or not the socket-outlet from which the equipment is to be
powered provides a connection to the building protective earth. If not, the SERVICE PERSON shall
arrange for the installation of a PROTECTIVE EARTHING CONDUCTOR from the separate protective
earthing terminal to the protective earth wire in the building.
Note: High leakage current. Earth connection essential before connecting supply.
46
Use a 25 amp external branch circuit protection device to install the unit.
For permanently connected equipment, incorporate a readily accessible disconnect in the fixed wiring.
Use only copper conductors.
Ground the cabling for the system on both sides.
Use one power feed for each individual power supply.
47
Platform Specifications
Specification
Load balancing of any TCP/IP operating system: 32and 64-bit Windows operating systems; all UNIX
platforms; and Mac OS
Device redundancy
Routing protocols
Jumbo frames
Platform Specifications
Item
Specification
Dimensions
Weight
Processor
Network interface
2 x 320 GB
RAM
16 GB
AC power supply
DC power supply
2 x 850W DC
Operating range: 44 to 72 VDC
Minimum start up voltage: 44 VDC
Note: Power supply will not start below 44 VDC.
50
Item
Specification
Operational temperature
32 to 104F (0 to 40C)
10 to 90% (40C)
Non-operational temperature
Specification
1826 BTU/hour
1487 BTU/hour
Safety requirements
This equipment complies with the following requirements of the Low Voltage Directive 2006/95/EC.
EC Type Examination Certificates:
EN 6090-1:2006+A11:2009
IEC 60950-1:2005, 2nd Edition
CB Scheme
UL 60950-1 2nd Edition, CSA C22.2 No. Master Contract 252302
60950-1-07
Important: Specifications are subject to change without notification.
51
Platform Specifications
EMC requirements
USA--FCC Class A, Canada--Industry Canada Class A
This equipment complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:
1. This equipment may not cause harmful interference.
2. This device must accept any interference received, including interference that may cause undesired
operation.
European Union
This equipment complies with the following requirements of the EMC Directive 2004/108/EC:
As Telecommunication Network Equipment (TNE) in Both Telecom Centers and Other than Telecom
Centers per (as applicable):
Directive
Required Limits
ESTI EN
EN
55022:2006 + C1:2006
EN
61000-3-2:2006
EN
61000-3-3:1995 + A1:2001 +
A2:2005
Class A
IEC61000-4-2
6 kV (Direct), 8 kV (Air)
IEC61000-4-3
IEC61000-4-4
IEC61000-4-5
2 kV AC Line-Gnd, 1 kV AC Line-Line
and Outdoor Signal Lines, 0.5 kV Indoor
Signal Lines > 10m
IEC61000-4-6
3V
IEC61000-4-11
As Information Technology Equipment (ITE) Class A per (as applicable):
52
EN
55024:1998 + A1:2001 +
A2:2003
EN
EN
61000-3-3:1995 + A1:2001 +
A2:2003
EN
55024:1998 + A1:2001 +
A2:2003
Class A
IEC61000-4-2
4 kV (Direct), 8 kV (Air)
IEC61000-4-3
3 V/m
IEC61000-4-4
IEC61000-4-5
IEC61000-4-6
3V
IEC61000-4-11
Important: Specifications are subject to change without notification.
Detail
Units
Value
Front
Left
Right
Rear
Top
dBA
dBA
dBA
dBA
66
72
61
64
67
Altitude 2
Operational
Non-operational
Feet
Feet
13,000
40,000
Airflow 3
Open air
CFM
260 (max)
Acoustic
1
2
3
All measurements taken at 0.6 meter with one power supply operational and fans at 75% duty cycle. Measurements
recorded in Decibels A-weighting.
Per BELCORE GR-63-CORE, section 4.1.3: This unit is functional when installed at elevations between 60m (197 feet)
below sea level and 1800m (6000 feet) above sea level at the aisle ambient temperatures of 40C.
Fan Tray airflow measurements taken at 100% duty cycle and in open air.
53
Volatile memory
Volatile memory loses all traces of data on power down; therefore, customer data that is stored in volatile
memory is secure when power is removed from the platform. No further action is required by customers
for equipment that includes volatile memory.
Non-volatile memory
F5 platforms include various non-volatile memory components. These non-volatile memory components
can be categorized as either user inaccessible or user accessible.
Inaccessible non-volatile memory components are programmed during manufacture or software installation.
The data stored in user inaccessible non-volatile memory is used for setting voltage levels, determining the
sequence of operational events, and the managing appliance operational condition. Data held within user
inaccessible, non-volatile memory represents no data security risk to customers. User inaccessible, non-volatile
memory cannot be modified by appliance users, and therefore, contains no customer data.
Description
Data
Customer data
No
PHY EEPROMs
No
Data
Customer data
F5 product software,
customer configuration,
and log files
Yes
Standard reprocessing or
customer removal
F5 product software,
customer configuration
and log files
Yes
Standard reprocessing or
customer removal
Removable
F5 product software,
CompactFlash (CF) card customer configuration
Yes
Standard reprocessing or
customer removal
Yes
Standard reprocessing or
customer action
Standard reprocessing or
customer action
58
On systems running BIG-IP software version 11.6.0 and later, you can use the F5 Disk Erase
utility to remove all data on hard disk drives (HDDs) or solid-state drives (SSDs) using a single-pass,
http://support.f5.com/kb/en-us/solutions/public/15000/500/sol15521.html.
On systems running earlier versions of BIG-IP software, you can create and use a bootable USB
drive to rebuild the system with a clean image of BIG-IP software. This runs a disk erase operation
and removes the master boot record (MBR). For more information see
http://support.f5.com/kb/en-us/solutions/public/13000/100/sol13164.html.
To use DHCP to assign the addresses, type y when prompted about using DHCP.
To manually assign the addresses, type n when prompted about using DHCP. At the prompts, type
values for IP address (required), netmask (required), and gateway (optional).
A confirmation message displays the configured management IP address, netmask, and gateway.
4. (Optional) Type i to verify the assigned addresses.
Important: This deletes all keys and makes any previously exported keys unusable.
59
Index
Index
A
acoustic specifications 53
AC-powered equipment
guidelines 46
AC power supply
about 33
hot swapping 33
administrative environment support 49
airflow specifications 53
Alarm LED
behavior 14
alerts
clearing 13
defining custom alerts 15
altitude specifications, operational 53
Always-On Management
setting up remote SSH access 22
Always-On Management (AOM)
hostconsh 21
AOM, See Always-On Management (AOM).
AOM Command Menu
21
accessing using serial console 22
accessing using SSH 22
options for 21
AOM IP address data
removing 59
Authorization requests screen 11
Auto-MDI/MDIX 17
E
electromagnetic compatibility (EMC) certifications 52
electrostatic discharge (ESD) 25, 45
EMC certifications 52
environmental 55
See also China RoHS Directive standards.
guidelines 45
operating specifications 50
See also China RoHS Directive standards.
ESD, See electrostatic discharge (ESD).
Ethernet hub requirements 10
cables
connecting 29
CD/DVD-ROM drives
support for 10
chassis
DC power supplies 37
chassis ground
location of 9
chassis ground wire 36
Check button
clearing alerts 13
for power on 13
China material content listing, See China RoHS Directive
standards.
China RoHS Directive standards 55
clear alert operation 13
Configuration utility
licensing the platform 30
cooling system
platform 47
CPU usage screen 11
failover cable 29
fan tray
about 38
replacing the fan tray 39
FIPS cards, See hardware security module (HSM).
front mount
kit hardware 25
front-mounting kit
installing 26
D
data communications equipment (DCE) 17
G
Gigabit Ethernet 10
grounding the platform 28
ground lug
connecting to ground terminal 29
guidelines
AC-powered equipment 46
DC-powered equipment 46
environmental 45
H
halting 12
61
Index
halt operation 13
hard disk drive (HDD)
39
failure 39
identifying a faulty hard disk drive 41
replacing on a BIG-IP 10.1 and later system 40
replacing on a BIG-IP version 10.0 system 43
replacing on a BIG-IP version 10.1 or later 42
replacing on a BIG-IP version 9.x system 43
troubleshooting 39
hard drive failure
recovering on a BIG IP 10.0 system 43
recovering on a BIG IP 9.x system 43
hardware
for AC-powered equipment 46
for DC-powered equipment 46
installation planning 25
requirements for peripherals 10
hardware security module (HSM)
removing data 59
hardware specifications 49
hard-wired failover 29
hazardous substance restrictions, See China RoHS Directive
standards.
Hold mode 12
hostconsh shell
defined 21
hot swap
DC power supply 35, 37
of power supply 33
of SFP modules 49
hubs 10
I
indicator LEDs
about 13
additional status conditions 15
behavior 13
for alert conditions 14
locating 9
interface command
valid media types 19
interface media type 17
interface mode 17
interfaces
duplex mode 17
media type 17
viewing status of all interfaces using Configuration utility
17
viewing status of all interfaces using tmsh 17
viewing status of a specific interface using tmsh 16
viewing valid media types 18
Internet/Intranet protocol support 49
J
jumbo frames 49
L
LCD config menu 11
62
LCD menus
11
using 12
LCD panel
10
backlight option 11
brightness option 11
contrast option 11
control buttons 11
menus 11
pausing on a screen 12
license
configuring 30
M
MAC addresses screen 11
maintenance
AC power supply 34
DC power supply 37
fan tray 39
management interface
29
setting the gateway 12
setting the IP address 12
setting the netmask 12
management IP address
configuring using LCD panel 30
memory technologies
about 57
battery-backed volatile memory 57
non-volatile memory 57
volatile memory 57
Memory usage screen 11
N
NEBS
air temperature 45
negative pressure fan system 47
netbooting 12
network interface LEDs
appearance of 19
RJ45 19
SFP 20
network interface specifications, See optical transceiver
specifications.
network management and monitoring 49
non-volatile memory
types 57
O
optical interfaces
configuring 16
managing 16
optical transceiver specifications 20
Index
P
pinouts
for cables 20
for console port 20
for failover port 20
specifications 20
platform
about 9
airflow 47
components provided 10
cooling system 47
FIPS 9
grounding 28
installing 25
replaceable components 33
ventilation 45, 47
platform specifications
49
environmental 50
operating 50
power 51
power cable 29
power cord
adding an AC power supply 34
powering off
host subsystem 13
power on operation 13
power specifications 51
power supply
installing a DC power supply 37
replacing a DC power supply 37
replacing an AC power supply 34
wiring the DC terminal block 36
power supply LED
states 14
Product version screen 11
PXE server
installing software from 12
Q
qkview utility 29
quick-install rail kit 26
R
rack mount ears, See front-mounting brackets.
rack mounting
front mount 2526
general environmental guidelines 45
quick-install rail kit 26
screws 26
unit spacing 25
rack mounting kits
types of 25
rack rail , See rail mount.
rail lock brackets
installing 27
rail locks 27
rail mount
installing rail lock brackets 27
S
safety agency approvals 51
Screens menu 11
serial failover 29
serial port
setting baud rate 12
serial terminal
hardware installation 10, 29
server/node operating system compatibility 49
SFP hot swap 49
SFP interface LEDs 20
specifications
acoustic 53
airflow 53
altitude, operational 53
for China RoHS 55
for hardware 49
for hardware operation 50
for power 51
for system features 49
SSL
platform 9
standby mode 13
Statistics screen 11
Status LED
states 14
when intermittently blinking yellow 16
when solid green 16
when solid yellow 16
storage drives
removing sensitive data 58
switches 10
63
Index
system
resetting 21
resolving when locked up 21
System information screen 11
System menu 12
T
TMOS, See Traffic Management Operating System (TMOS).
tmsh, See Traffic Management Shell.
Traffic Management Operating System (TMOS)
relation to AOM 21
Traffic Management Shell 16
two-post rack 25
64
U
USB port
supported CD/DVD-ROM drives 10
V
ventilation 47
W
warnings
environmental 45
Web server application compatibility 49