QA-QC Plan
QA-QC Plan
DOC.NO. XXX-QA-P-001 1 OF 84
REV. 05
CONTENTS
1.1 INTRODUCTION
1.2 C
OMPANY
QUALIT
POLICY
2.0
PROJEC
SCOPE
S
c
0
O
DOC.NO. XXX-QA-P-001
REV. 05
APPENDIXES
AL unmRrriR
APPENDIX G Audit
DOC.NO. XXX-QA-P-001 3 OF 84
REV. 05
1.1 INTRODUCTION
DOC.NO. XXX-QA-P-001
REV. 05
2.0 PROJECT SCOPE
Site Preparation:
c. Utilities :
Piping installation and testing shall be in
accordance with Client Requirements,
Standard Drawings, approved construction
drawings, and International and Industry
Standards, and specifications requirements.
Applicable References :
DOC.NO. XXX-QA-P-001
REV. 05
3.0 ORGANIZATION
> Position
> Responsibilities
> Reports to
> Expected Duties/Outputs
DOC.NO. XXX-QA-P-001
REV. 05
as necessary to maintain required QAJ QC
coverage, the Project Manager shall advise
the Client of such coverage and QA/QC
coverage at least thirty (30) days in advance
of schedules absences or changes and as
soon as possible for other changes.
- Meetings
- Reports
- Correspondence
- Records
- Site Instruction
- Request for Inspection (RFI)
DOC.NO. XXX-QA-P-001
REV. 05
and resolving problems that arise at the
interfaces between such groups.
conducted.
complaints.
profitability.
DOC.NO. XXX-QA-P-001
REV. 05
> Procedures Manual
DOC.NO. XXX-QA-P-001
REV. 05
g. During the meeting, any changes
required in relation to standard working
practices to satisfy the requirements of
the project, will be reviewed and
responsibilities assigned for the
preparation of adequate project specific
instructions, including procedures and
technical guidelines.
h. Project requirements for format of
deliverables shall be identified and
explained including, document number,
title blocks etc. where specified by THE
CLIENT as a contractual need.
DOC.NO. XXX-QA-P-001
REV. 05
> To indicate when, how, and by whom the
design process is to be carried out,
controlled and documented.
> To indicate the arrangements for the
review, verification and validation of
design output conformity to design input
requirements.
> Where applicable, the extent to which
the customer is to be involved in design
reviews and design verification.
DOC.NO. XXX-QA-P-001
REV. 05
c. The document shall be date
stamped on receipt and entered into the
corresponding log.
d. The document on issue shall be stamped
"CONTROLLED COPY".
e. Only controlled copy of the
documents shall be used for construction.
f. Photocopying of the controlled copy is
not permitted. Sufficient numbers of
controlled copy shall issue to the
construction crew to perform their job.
g. The distribution shall be made
under cover of a Document Transmittal.
h. In case of revisions, copies shall
destroy the previous issue or clearly mark
them as "SUPERSEDED".
i. Any individual assigned to have a
sensitive document (either the
original or a copy), will use it only at his
designated workstation.
j. Sensitive documents are to be kept in the
Head Office when not in actual use.
k. The project office will be locked when not
attended to. I. All originals of THE CLIENT
drawings shall be controlled in accordance
with the requirement.
DOC.NO. XXX-QA-P-001
REV. 05
Procedure: Shop Drawings
project documents:
lockable room.
> The entry to this room shall be restricted.
4.7 Purchasing
DOC.NO. XXX-QA-P-001
REV. 05
Where Company conducts verification of
materials, products or services at the
suppliers or subcontractor's premises, such
arrangements shall be clearly documented
and the result recorded. The requirements for
use of Inspection Agencies will be
documented for each project.
3.1 Responsibilities
DOC.NO. XXX-QA-P-001
REV. 05
quotation, evaluate quotations, obtain
approval to purchase and issue
Purchase Order.
3.1.3 Expediter
DOC.NO. XXX-QA-P-001
REV. 05
3.1.5 Warehouse Supervisor
a. Description of item
b. Quantity and unit
c. Technical Specifications
d. Specs stock number, if any
e. Recommendation for capital spare parts.
a. Name of Project
b. Equipment or materials description
c. Contractor's requisition number
d. Technical specifications
e. Quantity required
f. Required delivery date
g. Information regarding spare parts
data requirements and a request for cost
of capital spare parts.
h. Number of copies of Operating and
Maintenance Manuals required as well as
other 'final' documents.
i. Quality Assurance and Quality Control
requirements
j. The requirement for vendor's submittal of
all warranty and
Guarantee information k. The
requirement for vendors to use the English
language and the
Units of measure as indicated in the job
specification for all
Information submitted.
4.5.1 Scope
4.5.2 Definitions
DOC.NO. XXX-QA-P-001
REV. 05
4.5.3 Summary of Spare Parts Procurement
Process
DOC.NO. XXX-QA-P-001
REV. 05
for the procurement of materials, except
where specifically noted for spare parts
procurement.
5.1 General
DOC.NO. XXX-QA-P-001
REV. 05
5.2.2 ABC Company will utilize
additional Out-of-Kingdom Procurement
Agents for the procurement of equipment
and/or materials in U.S.A., U.K. and other
European Countries.
a. M
iddle
East
Equi
pme
nt
Co,
Inc.
Post
Box
#
770
756
Hou
ston,
Texa
s,
U.S.
A.
b
.
L
i
n
d
n
e
r
C
o
n
t
r
a
c
t
L
t
d
.
2
0
4
W
o
r
p
o
l
e
R
o
a
d
W
i
m
b
l
e
d
o
n
,
L
o
n
d
o
n
DOC.NO. XXX-QA-P-001
REV. 05
c. All Requests for Quotation (RFQ) will
originate from the Procurement
Department and quotations will be
returned to same.
5.3.1 Expediter
DOC.NO. XXX-QA-P-001
REV. 05
e. Approved revisions and/or
amendments regardless of source shall
be delivered to the vendor and shall be
made a part of the Purchase Order.
5.4.2 Responsibilities
DOC.NO. XXX-QA-P-001
REV. 05
5.4.3 Purchase Order Request
5.5 Transportation
5.5.1 General
DOC.NO. XXX-QA-P-001
REV. 05
5.5.1.4 Transport will be planned and
scheduled based on information and data
provided by the Procurement Expediter.
DOC.NO. XXX-QA-P-001
REV. 05
Packages shall be numbered
consecutively starting with number 1.
Each package must contain a PACKING
LIST and a duplicate copy of the packing
list must be placed in a waterproof
envelope securely fastened to the
outside of the package.
R
E
t
e
ri
DOC.NO. XXX-QA-P-001
REV. 05
d. MATERIAL RECEIVING REPORT (MRR)
Accounting -
Original + one copy
Procurement -
One copy Filed
Office - One
copy
DOC.NO. XXX-QA-P-001
REV. 05
Also, a copy of the OS & D Report will be
forwarded to the Contractor's
Procurement Department.
5.6.3 Storage
5.6.4 Issue
DOC.NO. XXX-QA-P-001
REV. 05
6.1.2 Quotation of the Recommended
Spare Parts for each Equipment Items.
DOC.NO. XXX-QA-P-001
REV. 05
7.7 Material Receiving Report will be issued by
storekeeper who will receive the
materials on site and will notify the Main
Office in case of damage/short or not as
specified in the Purchase Order.
e
.
F
i
e
l
d
W
a
r
e
h
o
u
s
e
I
s
s
u
e
/
R
e
q
u
i
s
i
t
i
o
n
DOC.NO. XXX-QA-P-001
REV. 05
Used as request by field personnel to
withdraw material and equipment from
storage; and, as issue document to
record material and equipment which
have been issued from storage locations.
a. Expediting Report
Imported Materials
& D)
Report (Vendor
a weekly report of QC
activities.
DOC.NO. XXX-QA-P-001
REV. 05
e. Material Procurement Status Report
DOC.NO. XXX-QA-P-001
REV. 05
d. Quantity damaged, or unusable
materials, will be shown in the Materials
Receipt Inspection Report Form
d. Material items damaged, or unsuitable
during installation will be:
DOC.NO. XXX-QA-P-001
REV. 05
h. THE CLIENT will then issue the material /
item ensuring that no damage or loss of
identification is incurred during any
loading, offloading, sling or other
handling operation.
Details:
DOC.NO. XXX-QA-P-001
REV. 05
4.10 Process Control
DOC.NO. XXX-QA-P-001
REV. 05
Procedure: Inspection of Material
> Methods
> Techniques
> Workmanship planned or conducted
DOC.NO. XXX-QA-P-001
REV. 05
> Survey and Layout
> Prior to Closure of Form Work
> Prior to concrete placement and grouting
> Prior to asphalting
> Prior to commencement of the initial bending of epoxy
coated re bar
> Priorb. Civil Works
to closure of walls
> After preparing the bottom of foundations
> Before backfilling around structures
> After preparing the existing sub-grade
> Sand cover of "piping"
> Concrete prior to repair
> Masonry
> Foundations
> Elevations, level and piping
c. Mechanical Works
> Equipment foundations
> Location, level and alignment
> Equipment assemblies
> Functioning of controls and valves
d. Piping Works
> Qualification of Welders and RTR installers
> Fit-up and welding
> Orientation, elevation, slope etc. of installation
> Non Destructive Testing
> Pressure testing
> Repair of crack welds
> Post weld heat treatment
> Surface preparation for coating
> Pipe bending
> Piping lay-up
> Gasket installation
> Bolt torquing
> Socket weld gap and engagement
> Holiday testing
e. Electrical and Communication Works
Buried Cable
DOC.NO. XXX-QA-P- 47 OF 84
001
REV. 05
> Trench before installation of sand
pad
> Cable during placing operation
> Marker tape placement
> Underground conduit
> Trench before installation of the conduit
> Conduit before concrete
encasement including mandrel
testing
> Orange dye placement
- Manholes
case.
- Cable Testing
1) Type test
2) Witness testing (including on-
site acceptance)
3) Product verification
4) Product validation
5) Material, product, process or
personnel certification.
DOC.NO. XXX-QA-P-001
REV. 05
direct traceability to national/international
standards, or standards recognized within
the Kingdom of Saudi Arabia.
DOC.NO. XXX-QA-P-001
REV. 05
c. The approved metrology laboratory
provides calibration reports with the
following information as a minimum:
Calibration Services:
DOC.NO. XXX-QA-P-001
REV. 05
> Such an approved laboratory applies
weather resistant calibration labels with
the following information, as a minimum:
a. Report number
b. Control number of test equipment
c. Condition of equipment at time of calibration
d. Description of repair, if any
e. Calibration standards used
f. Calibration data
g- Environment condition at time of calibration
h. Calibration procedure used
i. Calibration date
j- Signature of calibration technician
DOC.NO. XXX-QA-P-001
REV. 05
d. Only "accepted" equipment and materials
shall be issued for construction activities.
Procedure: Non-conformance
DOC.NO. XXX-QA-P-001
REV. 05
Quality Manager or his designated
nominee prior to close out for the NCR.
Further copies will go to the Procurement
Department for information and a copy
will be maintained in the Project File.
g. When a non-conformance is noted
during production/construction, a NCR
will be raised by the Quality Assurance
Manager or his nominee and the
corrective action taken (see para, b) as
defined by the Discipline Manager.
h. If rework is within the specification
requirements, the rework will be carried
out as defined in the NCR. The
Engineering manager will be responsible
for defining the rework requirements.
i. If a rework is outside the specification
requirements a corrective
action request shall be raised
quarantining the item.
j. A waiver request, including the proposed
repair procedure, shall be forwarded to
THE CLIENT for their approval or
recommendations. The item will remain
quarantined until the disposition of the
corrective action has been agreed in line
with paragraph "b" of this procedure.
k. Items considered not acceptable for
correction, rework or repair shall be
tagged "REJECTED" and shall be
removed as soon as possible from the
work site and destroyed if and when
necessary. Rejected materials shall be
kept in a suitable and properly delimited
segregation area until their final
destination has been decided.
I. The QC Inspector shall inspect all rework
against the original standards or
specifications and the original
acceptance criteria shall be used to verify
the acceptability of the rework. The NCR
will then be signed-off when found to be
acceptable. If the item has been rework,
the rework procedures will be noted on
the NCR.
m. All information's relevant to rejected
materials shall be noted for materials
reconciliation purposes. The Project
quality Assurance Manager shall ensure
the follow-up of the corrective action. The
Quality Assurance Manager may check
on the remedial or corrective action
completion by a check visit on site or
through notes from the concerned
responsible personnel informing him on
the achievement of the action.
n. The Quality Organization shall maintain
records of all nonconformance and
corrective action forms, this shall include:
> Objective evidence or remedial
actions to substantiate that
corrected / reworked items have
been re-inspected and/or re-
tested according to applicable
procedures.
o. In case of re-occurrence of specific
nonconformity (trend), the Quality
organization shall provide for auditing of
the activity. Audit Report, and if
necessary, corrective Action Request
shall be issued in this respect.
p. All NCR's will be filed and maintained for
each project. These NCR's will form a
part of the project quality records.
DOC.NO. XXX-QA-P-001
REV. 05
q. All NCR's, including THE CLIENT issued
NCR, will be logged in the non-
conformance report register by the
Quality Assurance Manager or his
designated representative.
DOC.NO. XXX-QA-P-001
REV. 05
c. The preventive action taken shall
be suitable to magnitude the problem.
d. The analysis of preventive action
taken shall be reviewed in the
subsequent management review
meeting.
Procedure: Handling
a. Selected employees are instructed,
as required; in proper methods of
material handling before any actual
handling of material occur.
b. To prevent damage during
materials handling, the following devices
may be used:
> Dollies
equipment
Procedure: Storage
Procedure: Preservation
DOC.NO. XXX-QA-P-001
REV. 05
b. Meat sensitive items shall be stored
under temperature control.
c. Materials provided with
preservatives during storage shall be
verified for proper packing and storage.
d. The material controller, based in
input from the equipment supplier, will
prepare and maintain a list of all
equipment subject to preservation,
including frequency and the type of
preservation to be used. Condition of
equipment and material in storage will be
checked periodically to prevent
deterioration and identify nonconforming
conditions.
Procedure: Preservation
DOC.NO. XXX-QA-P-001
REV. 05
e. No corrections shall be made after
the client has signed off a document.
f. The document shall be filed in
accordance with individual discipline or
activity.
g. The documents shall be compiled on
standard box 2" or 3".
h. An index shall be prepared on top of the
file.
Procedure: Storage
DOC.NO. XXX-QA-P-001
REV. 05
All audits will be executed by Quality
Assurance (QA) personnel not directly
responsible for the area being audited or by
an approved third party agency. Audits shall
be performed in accordance with pre-
established written procedures and
checklists.
DOC.NO. XXX-QA-P-001
REV. 05
requirements as well as the audit history.
The date on review shall be recorded on
the Audit Schedule. The General
Manager shall authorize any significant
changes to the Audit Schedule.
DOC.NO. XXX-QA-P-001
REV. 05
unscheduled audit. When completed the
unscheduled audit shall also be shown
on the Audi Schedule as having taken
place.
DOC.NO. XXX-QA-P-001
REV. 05
> Audit report status log
> Audit schedule
> Corrective
action request
status log
Procedure: Audit
Follow-up and
Close-out
4.19 Training
DOC.NO. XXX-QA-P-001
REV. 05
Special attention shall be given to the initial
training of new employees, or employees
assigned to new tasks while gaining the
required levels of proficiency.
4.20 Servicing
DOC.NO. XXX-QA-P-001
REV. 05
APPENDIX A
a
g
e
r
e
c
I
n
d
i
C
E
p
e
p
e
r
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
JOB DESCRIPTION
Duties/Output:
DOC.NO. XXX-QA-P-001
REV. 05
APPENDIX B
MANAGEMENT STANDARDS
Standard -1 - Introduction
Standard -2 - Quality Management System
Standard -3 - Leadership and Corporate Management
Standard -4 - People Management
Standard -5 - Facilities Management
Standard -6 - Selling Goods Services
Standard -7 - Buying Goods and Services
Standard -8 - Design and Development (Not Applicable)
Standard -9 - Planning For Quality Operational Control
Standard -10 The Continued Improvement Process
DOC.NO. XXX-QA-P-001
REV. 05
APPENDIX C
QUALITY CONTROL PROCEDURE
II. QUALITY CONTROL PROCEDURES
QA-WIP-1-001 = Scaffolding
QA-WIP-1-002 = Rigging
QA-WIP-2-001 = Excavation, Trenching, Backfilling and C
QA-WIP-2-002 = Demolition
QA-WIP-2-003 = Base Course and Asphalt Concrete Pav
QA-WIP-2-004 = A/G Steel Piping Valve Appurtenances
QA-WIP-2-005 = U/G Water System (UPVC/PVC and Fitt
QA-WIP-2-006 = Sanitary Sewer System ( UPVC/PVC)
QA-WIP-2-007 = Raw Water System ( PVC Pipes and Fit
QA-WIP-2-008 = Fire Water System ( RGS Pipes)
QA-WIP-2-009 = Landscaping
QA-WIP-3-001 = Concrete Formwork
QA-WIP-3-002 = Concrete Reinforcement
QA-WIP-3-003 = Construction, Expansion and Contractio
QA-WIP-3-004 = Cast-in Place Concrete
QA-WIP-4-001 = Concrete Masonry Units and Plastering
QA-WIP-5-001 = Space Frame Installation
QA-WIP-8-001 = Hollow Metal Doors and Frames
QA-WIP-8-002 = Aluminum Windows
QA-WIP-8-003 = Gypsum Boards, Studs and Runners
QA-WIP-8-004 = Glazing
QA-WIP-8-005 = Suspended Acoustical Ceiling
QA-WIP-9-001 = Metal Stud Framing System
QA-WIP-9-002 = Gypsum Wallboard System
QA-WIP-9-003 = Ceramic Tiles and Accessories
QA-WIP-9-004 = Suspended Acoustical Ceiling
QA-WIP-9-005 = Carpeting
QA-WIP-9-006 = Painting
QA-W IP-14-001 = : Elevators and Escalators
QA-WIP-15-011 = Air Handling Unit / Air Cooled Condensi
QA-WIP-15-012 = Exhaust Fan
QA-WIP-16-001 = Electrical Works -General
QA-WIP-16-002= Raceways
QA-WIP-16-003= Underground Electrical Services
QA-WIP-16-004= Wire and Cables
QA-W IP-16-005 = = Cabinets, Boxes, Auxiliary Gutters and
QA-W IP-16-006 = = Panel boards
:
QA-W IP-16-007 = Over Current Protective Devices
DOC.NO. XXX-QA-P-001
REV. 05
QA-WIP-16-008 = Grounding
QA-WIP-16-009 = Exterior Lighting
QA-WIP-16-010 = Building Lighting
QA-WIP-16-011 = Telephone
/Communication System
QA-WIP-16-012 = Substation Equipment
DOC.NO. XXX-QA-P-001
REV. 05
APPENDIX D
INSPECTION AND TEST PLANS
ITP-C-2-001 Excavation, Trenching, Backfilling and Comp
ITP-C-2-002 Demolition
ITP-C-2-003 Base Course, Sub-base and Asphalt Concret
ITP-C-2-004 A/G Steel Piping
ITP-C-2-005 U/G Oily Water System (UPVC/PVC Pipes a
ITP-C-2-006 Sanitary Sewer System (UPVC/PVC)
ITP-C-2-007 Raw Water System (PVC Pipes and Fittings)
ITP-C-2-008 Fire Water System (RGS Pipes)
ITP-C-2-009 Landscaping
ITP-C-3-001 Concrete Formwork
ITP-C-3-002 Concrete Reinforcement
ITP-C-3-003 Construction, Expansion, Expansion & Contr
ITP-C-3-004 Cast-In Place Concrete
ITP-C-4-001 Concrete Masonry Units and Plastering
ITP-C-5-001 Space Frame Installation
ITP-C-8-001 Hollow Metal Doors and Frames
ITP-C-8-002 Aluminum Windows
ITP-C-8-003 Gypsum Boards, Studs and Runners
ITP-C-8-004 Glazing
ITP-C-8-005 Suspended Acoustical Ceiling
ITP-C-9-001 Metal Stud Framing System
ITP-C-9-002 Gypsum Wallboard System
ITP-C-9-003 Ceramic Tiles and Accessories
ITP-C-9-004 Suspended Acoustical Ceiling
ITP-C-9-005 Carpeting
ITP-C-9-006 Painting
ITP-C-14-001 Elevators and Escalators
ITP-C-15-001 Air Handling Unit/Air Cooled Condensing Un
ITP-C-15-002 Exhaust Fan
ITP-C-16-001 Electrical Works
ITP-C-16-002 Raceways
ITP-C-16-003 Underground Electrical Services Exhaust Fan
ITP-C-16-004 Wires and Cables
ITP-C-16-005 Cabinets, Boxes, Auxiliary Gutters & Wire wa
ITP-C-16-006 Panel Boards
ITP-C-16-007 Over Current Protective Devices
ITP-C-16-008 Grounding
ITP-C-16-009 Exterior Lighting
ITP-C-16-010 Building Lighting
ITP-C-16-011 Telephone and Communication System
ITP-C-16-012 Sub Station Equipment
DOC.NO. XXX-QA-P-001
REV. 05
APPENDIX E
INSPECTION
AND TEST
CHECKLIST
PE
NDI
XF
OR
GA
NI
ZA
TI
ON
AL
CH
AR
T
DOC.NO. XXX-QA-P-001
REV. 05
A
L
I
Report