Tunnel Design and Construction Practice: Technical Solutions in Swelling Ground
Tunnel Design and Construction Practice: Technical Solutions in Swelling Ground
Motivation
subject
j of the presentation:
page 2
1
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Introduction
Terminology
page 3
success of design
g and construction of a tunnel related to:
the knowledge of geological environment,
rock mass parameters, overburden thickness,
in-situ stress field, tunnel size and shape, etc.
2
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Introduction
Significance of Swelling for tunnel construction
Swelling
g is not only
y affected by
ygground conditions
page 5
swelling
g pressure in lab tests versus in-situ swelling
g pressure
quality of samples:
- avoid drying process
- avoiding volume changes
scaling effect lab / in-situ
stiffness relation tunnel lining / surrounding rock
effective water conditions
page 6
3
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Introduction
Applicability of Calculation Methods
weak point:
identification of key parameters for such swelling laws
scaling effect does not allow to use test results directly
alternatives:
use of a empirical load or volume change approaches
page 7
Historyy of Tunneling
g at Bosruck
Railway Tunnel
page 8
4
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Introduction
page 9
page 10
Historie
5
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
History
page 12
6
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
History
page 13
page 14
7
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
History
Cost overrun of 80 %
page 15
page 16
8
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Overview road tunnel Bosruck
page 17
About a month after first top heading pass first spalling occurred
to the structure
page 18
9
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Continuous rehabilitation works
page 19
Guaranteeing
g serviceability
y
FUNKKABEL
WESTULME
LICHTRAUMPROFIL FUNKKABEL
GRAZ
LINZ
2"
RKABEL
SCHLUSSFUGE
PVC - HALBSCHALE DN40 ALLE 5
LBSCHALE DN40 ALLE 5m FAHRBAHNENTWSSERUNG
TUNNELHAUPTENTWSSERUNG DN 400
DN600
FAHRBAHNAUFBAU:
TRAGSCHICHTDRAINAGE
DN200 22 00cm BETONDECKE
page 20
10
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Results of feasibility study
Original
g concept listed construction 2nd tube in 2021
page 21
page 22
11
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Geology: Haselgebirge-formation
overburden
page 23
K 10 K11
S1 S2
page 24
12
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Visualization of monitoring data
page 25
Probleme
Rock formation:
Construction deficiencies:
page 26
13
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Design methodology for Haselgebirge-formation
damages
g occurred in the 1st tube & conclusions regarding
g g the
swelling/squeezing behaviour exploited for the design and
construction of the second tube
page 27
- Shotcrete lining 8 30 cm
(chosen 18 cm)
page 28
14
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Back calculation TM 600
page 29
Construction sequences
page 30
15
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Results of back calculation
page 31
page 32
16
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Design of 2nd tube
Typical
y cross section Haselgebirge-formation
g g
- circular profile
page 33
page 34
17
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
A9 Bosruck 2nd road tunnel, Austria
Experience from Design & Construction
uncertainties
t i ti due
d tot limited
li it d kknowledge
l d
about the swelling / squeezing mechanisms
eliminated as much as possible
based on experiences gained so far in tunnelling
in the Bosruck Massiv during the last 100 years.
page 35
Project
j overview
Conclusions
page 36
18
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Project overview
First Tube:
under operation since 1980
L = 6.718 m
Second tube:
under construction since 10/2007
L = 6.586 m
page 37
page 38
19
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Project overview
Geology:
gy Molasse
page 39
Laboratoryy investigations
g for first tube
page 40
20
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Back analysis 1st tube
Invert design:
400 mm reinforced invert
Durable anchorage:
52 % typ I = 0,13 MN/m
page 41
Simulation of swelling
g behavior:
page 42
21
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Back analysis 1st tube
Simulation of swelling
g behavior
Assumptions:
Max. strain:
at center of tunnel
Strain distribution:
decreasing towards sidewall
1/3 v, max
1/2 v, max
2/3 v, max
v, max
page 43
Comparison of analyses
y / measurements
page 44
22
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Result of back analysis
max. pressure
at abutment
page 45
page 46
23
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Design Aspects 2nd tube
Sickle-shaped distribution
page 47
Profile lining
segments 27 cm
concrete 28 cm
page 48
24
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Design Aspects 2nd tube
Shield TBM
Uniform distribution
Zero at abutment
page 49
Shield TBM
Uniform distribution
Zero at abutment
page 50
25
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Design Aspects 2nd tube
Conclusion:
page 51
page 52
26
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Pfnder Tunnel 2nd road tunnel, Austria
Experience from Design & Construction
page 53
Project
j Overview
Conclusions
page 54
27
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Project Overview
page 55
Seite 56
28
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Project Overview
Seite 57
Tunnel lining
g concept
Seite 58
29
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Key Design Aspects
Geological
g /g
geotechnical model
Seite 59
Creep / squeezing
g conditions
Seite 60
30
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Key Design Aspects
high
g content of chloride
Seite 61
question:
scope:
page 62
31
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Chloride Diffusion Analysis
Physical
y Background
g
page 63
Numerical Modelling
g
32
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Chloride Diffusion Analysis
analysis
y
modelling section:
modelling section
page 65
g
geometry
y and material parameters
page 66
33
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Chloride Diffusion Analysis
time discretisation
for the first 2 years (= 730 days) only layers 3 and 4 active
page 67
Evaluation of Results
shotcrete
lining rock
page 68
34
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Chloride Diffusion Analysis
Evaluation of Results
page 69
Evaluation of Results
page 70
35
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Rock Swelling Analysis
page 71
Calculation Results
page 72
36
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Rock Swelling Analysis
Calculation Results
page 73
page 74
37
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Niagara Water Diversion Tunnel, Canada
Experience from Design & Construction
design
g swelling g pressure mayy correspond to the final
equilibrium state expected in the long term
-> swelling potential exhausted.
page 75
experiences gained in the projects can be used to make the following statements:
selecting
gppreventive construction sequences:
q
page 76
38
Tunnel Design and Construction Practice:
Technical Solutions in Swelling Ground
Conclusions
-> reason could be sample disturbance (strength, stiffness, stress state, etc.)
-> scaling factor between the macro behaviour in the rock mass and the meso behaviour
in the lab tests
tunnelling in swelling ground is not a problem that has been solved at all.
due to uncertainties in describing swelling behaviour there is a great need for research:
-> in laboratory testing (taking the long periods of observation into account)
-> developing more realistic and adequate constitutive swelling laws.
page 77
39
21/01/2011
MOVIE
1
21/01/2011
2
21/01/2011
3
21/01/2011
4
21/01/2011
5
21/01/2011
6
21/01/2011
7
21/01/2011
8
21/01/2011
9
21/01/2011
10
21/01/2011
11
21/01/2011
12
21/01/2011
13
21/01/2011
14
21/01/2011
15
21/01/2011
16
21/01/2011
17
21/01/2011
zurck
18