Gravimetric Hydraulics
Bench
USER GUIDE
PE/DB/1105
TQ H1 Gravimetric Hydraulic Bench
CONTENTS
Section Page
1 Introduction 1
2 Installation instructions 2
Electrical Connection 2
Filling and draining operations 3
Additional sump connection (stack pipe) 4
i
TQ H1 Gravimetric Hydraulic Bench
ii
TQ H1 Gravimetric Hydraulic Bench
1. Introduction
The TQ Volumetric Hydraulic bench H1 is a self-contained and fully mobile bench comprised of four major
parts:
i) The Sump Tank (160 Litre capacity), containing the water necessary for the experiments.
ii) The lid (or bench top).
iii) The Weigh Tank (40 Litre capacity), suspended from a bracket at the top of the sump
just under the lid.
iv) The Electric Submersible Pump held in place by a bracket in the base of the sump tank.
The H1 bench provides an accurately controlled flow of water, for use with many experiments.
The top of the H1is rigid and forms the working surfaces for several experiments in the TQ Hydraulics
range.
The principle of operation is straightforward; the user measures the time taken for the weigh tank to collect
a specific weight of water. The weight of the water is measured by a counter balanced lever and weight
system with a 3 to 1 ratio. Six weights, each 2 kg (12 kg total) allow a measurement of 36 kg water.
Page 1 of 10
TQ H1 Gravimetric Hydraulic Bench
2. Installation instructions
The Hydraulic Bench is usually despatched in its assembled condition with the exception of the drain valve.
The weight carrier, weights and drain valve are packed separately.
This manual uses symbols to attract the operators attention to particular information.
These symbols and their meanings are as follows:
Failure to carry out this instruction could cause damage to the apparatus,
CAUTION other equipment, personal property, or the environment
Electrical Connection
NOTE The colours of the wires in the mains lead supplied follow this code:
GREEN-AND-YELLOW: EARTH (E or )
BROWN: LIVE (L)
BLUE: NEUTRAL (N)
Protect the installation with a residual current circuit breaker with a trip
NOTE
current of 30 mA. The supply fuse rating must be either 5 A (for a 230 V
supply) or 10 A (for a 115 V supply).
Always isolate this equipment from the electrical supply before accessing
WARNING any of its electrical components.
WARNING Do not use this apparatus within 2.4 metres of a mains electrical outlet.
Page 2 of 10
TQ H1 Gravimetric Hydraulic Bench
a) With the help of an assistant carefully lift and remove the bench top, allowing the bench supply
hose to slide back through its hole in the bench top.
b) Place the bench top safely onto suitable supports, do not rest the bench top on its side or it may be
damaged.
3. Ensure that the sump, weigh tank and pipes are clean and free from dust.
4. Fill the sump tank with around 160 Litres of cold water to the level label (See Figure 2).
Figure 2
5. Mix the Barley Straw water treatment liquid in the correct proportion to the contents of the sump tank.
Close the bench supply (gate) valve.
6. Connect bench to the mains and start pump motor. Check hose clips for leaks.
7. Direct the supply hose into the weigh tank and slide the weigh beam stop (See Figure 5) over the
beam. Remove the weights.
8. Open the bench supply (gate) valve and fill the weigh tank with water to roughly 25 mm from the top.
9. Close the bench supply (gate) valve and check the drain valve is closed and not leaking.
10. To drain the weigh tank, depress the weigh beam above the weight hanger and slide the beam stop
away. Gently release the weigh beam and the water will commence to drain.
11. To finish draining, lift the weigh beam for 10 to 15 seconds.
Note: There will always be water in the drain valve tube and some residual water in the bottom of the
weigh tank after draining.
Page 3 of 10
TQ H1 Gravimetric Hydraulic Bench
12. Replace the bench top, the Gravimetric Bench is now ready for use.
The drain valve assembly (A) drops into the hole in the weigh tank (B) (See Figure 3).
The rubber seal, plus the weight of the valve assembly when filled with water, ensure a good seal.
The Gravimetric bench H1 is not suitable for accurately measuring flow rates above 2 kg per second.
This is mainly due to the capacity of the weigh tank and the increased turbulence at higher flow rates,
which will give false readings.
Page 4 of 10
TQ H1 Gravimetric Hydraulic Bench
b) A stack pipe from the sump is secured next to the normal delivery pipe, held in place with a plastic
clip and worm drive hose clip.
c) Remove the worm drive clip and slide the pipe through the hole in the tank and out of the plastic
clip. The stack pipe can now be connected to the external circuit.
Note: The outlet can be connected with the sump tank full of water if the connection can be made above
the level of the sump tank water.
Page 5 of 10
TQ H1 Gravimetric Hydraulic Bench
The precision weighing unit of the TQ Hydraulic Bench, which has a 3:1 arm ratio, is designed for accurate
measurement of large quantities of water up to a maximum of 36 kg.
Before continuing with any experimental work on the bench, students should familiarise themselves with
the following technique:
4. Allow the weigh beam to return to its lower position with only the weight carrier on (see Figure 6).
Slide the weigh beam stop above the weigh beam.
Page 6 of 10
TQ H1 Gravimetric Hydraulic Bench
Figure 6
Figure 7
Figure 8
Page 7 of 10
TQ H1 Gravimetric Hydraulic Bench
8. When the mass of water collected balances the mass of the weight hanger, the beam will rise again to
the horizontal position (See Figure 9). At this instant, stop the timer and record the timing interval.
Figure 9
a) Drain
b) Press down on A
c) Slide stop away
d) Release arm gently and remove
weights
e) Lift at B to complete draining for 10 -
15 seconds
Figure 10
10. To drain weigh tank, depress weigh beam above weight hanger and slide weigh beam stop away.
Gently let weigh beam rise until it stops against the sump tank. Remove the weights and the tank will
continue draining. As the weigh beam returns to the horizontal, lift it for 10 - 15 seconds to drain final
amount from weigh tank (See Figure 10).
Note: With the supply (gate) valve fully open, a flow of 30 kg in 30 seconds is usual and is the acceptable
test at the factory.
Page 8 of 10
TQ H1 Gravimetric Hydraulic Bench
General
Periodically inspect electrical leads and connections for wear and that all warning labels are in position
and readable.
Every 3 to 4 months drain the sump tank and wipe clean with a damp lint-free cloth. Refill with clean
water and stain and deposit inhibitor.
Where heavy contamination has taken place on the tanks, a proprietary household cleanser may be
used if applied sparingly. (It is advisable to try the chosen cleanser on a small area before applying all
over).
Specific Faults
PUMP OVERHEATS: Check for sufficient water in the sump tank and that the
pump is not running dry.
1. The water level in the sump tank. Excessive noise coming from the pump section is one sign of a
low water level. Refill the tank if necessary.
2. Blockages of the bench (gate) supply valve. Remove the bench top and the flexible plastic supply
pipe at the valve and visually check for blockages.
Page 9 of 10
TQ H1 Gravimetric Hydraulic Bench
The bench supply valve is a commercial gate valve. Figure 11 shows the internal details of the valve. Cure
slight leaks as follows:
1. Remove the Hand wheel retaining nut and the Hand wheel.
2. Slacken and remove the cap nut. The gland-packing ferrule will now be exposed. The head of the
ferrule should be about 2 mm clear of the thread. If this is not the case, simply refitting and tightening
the cap nut may correct the leak. However, if the ferrule is flush with the thread, then the gland needs
repacking. To do this:
a) Remove the existing packing and repack with either replacement nylon 0 rings or packing cord.
b) Refit the gland ferrule and nut, ensuring the gland ferrule has enough clearance to tighten the
packing when the nut is refitted.
Page 10 of 10