DPR For 03-05-2019
DPR For 03-05-2019
DPR For 03-05-2019
Daily Progress R
CEEKAY ASSOCIAT
Earth work
3 MSW 3 0 7 2
4 ACC 0 0 0 0
5 Flue gas 0 0 2 0
6 TG Building 0 0 0 0
7 WEIGHING BRIDGE 0 0 0 0
8 WTP 0 0 0 0
9 PIPE RACK 0 0 0
10 RMC Plant + Misc 0 0 0 0
Transit
Excavtor Tractor trolley Breaker mixer and
Boom pump
Si.no Location
1 All sites 1 5 1 3
Total 1 5 1 3
Total Quantities(Weigh bridge, Tipping floor, MSW pit, Boiler, TG building , ACC, FGC
Quantity
Achieved Achieved
S.no Description of Work Expected Qty As per drg On Date Up to Date
1 P.C.C. 2141 2002 0.2 1648.92
2 R.C.C. 16811 16709 16.992 12860.854
3 Reinforcement work 3000 2906 0.18 2008.06
Reporting on :03-05-2019
Daily Progress Report of JUWMGL
CEEKAY ASSOCIATES PVT LTD @ GUNTUR
Quantity
PCC RCC
As per
As per drg Up to date IN % on date drg Up to date IN % on date
1 12 2 22
3 12 1 28
0 0 0 0
4 11 1 18
4 8 2 14
0 0 0 0
1 7 1 9
0 0 0 0
0 8 2 10
4
8
14 63 10 128
:-03-05-2019
Tractor
Leveller Dumper Total Total
Breaker
0 0 0 10
0 0 0 10
50 47.500 95.000 0
280 262.240 93.657 0
124 124.000 100.000 0
110 94.100 85.545 0
462 274.430 59.400 0.18
1280 648.040 50.628 0
398 398.000 100.000 0
299 149.030 49.843 0
30 10.720 35.733 0
3033 2008.060 66.207 0.18
Remark