Ongc B-22 Field Development Project CONTRACT NO. MR/OW/MM/B-22/19/2008 NPCC Project No. 8118
Ongc B-22 Field Development Project CONTRACT NO. MR/OW/MM/B-22/19/2008 NPCC Project No. 8118
Ongc B-22 Field Development Project CONTRACT NO. MR/OW/MM/B-22/19/2008 NPCC Project No. 8118
5 Ultrasonic Testing Welding NDT as per NDT plan API RP 2X API RP 2X lv.'C' UT reports H W RW
6 Radiographic Testing of Welding NDT as per NDT plan AWS D1.1 AWS D1.1 RT reports &
long seam of base pipe film H R R
7 Stress Relieving of the Visual AWS D1.1/ ONGC 2009F App. Procedure/ONGC Heat Chart
Flange 100% 2009F H R R
9 Paint Test Certificates Reviewal 100% ONGC – Spec . 2005 Rev. 3 ONGC – Spec . 2005 M.T.C
including addendum, Rev. 0 Rev. 3 including H R R
addendum, Rev. 0
Surface preparation Anchor Profile Random checking ONGC – Spec . 2005 Rev. 3 25-50 Microns I.R
Protective coating
including addendum, Rev. 0 H RW R
Page 1 of 6
Paint thickness( Final DFT) Digital coat measure Random checking ONGC – Spec . 2005 Rev. 3 FINAL DFT & ONGC I.R
including addendum, Rev. 0 SPEC 2005 REV.3 H RW RW
Paint thickness( Final DFT) Digital coat measure Random checking ONGC – Spec . 2005 Rev. 3 FINAL DFT (365-450 I.R
including addendum, Rev. 0 micron ) ONGC spec H RW RW
2005
3 UT of longitudinal joint of Welding NDT App. NDT PLAN API- RP-2X / 2009F API- RP-2X / 2009 F & UT Reports
H W RW
Cone AWS D1.1
4 UT of weld joints between Welding NDT App. NDT PLAN API- RP-2X / 2009F API- RP-2X / 2009F- UT reports
H W RW
cone & flange Lv.C
5 Radiographic Testing of Welding NDT App. NDT PLAN AWS D1.1/ ONGC 2009F AWS D 1.1 /ONGC RT reports &
H R R
long seam of Cone 200F RT Film
Page 2 of 6
6 Stress Relieving of the Visual App. Procedure/ONGC Heat Chart
Flange Ring of Crane Mount 100% AWS D1.1/ ONGC 2009F 2009F H R R
7
Fit up Fit up Dimensional 100% Mfg.Drawing Drawing S.I.R. H R R
8
Machining of flange overall dimensions Dimensional 100% Mfg.Drawing Mfg.Drawing F.I.R. H R R
9 Protective coating Paint Test Certificates Reviewal 100% ONGC – Spec . 2005 Rev. 3 ONGC – Spec . 2005 M.T.C
Rev. 3 including H R R
addendum, Rev. 0
Surface prepration Anchor Profile Random checking ONGC – Spec . 2005 Rev.3 25-50 micron
I.R H RW R
Paint thickness( Final DFT) Digital coat measure Random checking ONGC – Spec . 2005 Rev.3 FINAL DFT (365- 450 I.R
micron) ONGC Spec H RW RW
2005
ITEM NAME.:YOKE
SR QUANTUM OF REFERENCE ACCEPTANCE
STAGE ACTIVITY CHARACTERSTIC TYPE OF INSPECTION RECORD RE NPCC/TPI ONGC/ CA
NO. CHECK DOCUMENT NORMS
1 Material Identification & Material identification Check test where One sample per heat Mfg.Drawing Mfg.Drawing M.T.C./ Test
stamp transfer only for load Original M.T.C./ original no/ lot wise reports
bearing members approved MTC is not H W RW
available
4 Dimensional / Visual Overall dimensions dimensional Visual 100% Mfg.Drawing Mfg.Drawing F.I.R.
H RW R
checking
5 Protective coating Paint Test Certificates Reviewal 100% ONGC – Spec . 2005 Rev. 3 ONGC – Spec . 2005 M.T.C
H R R
Rev. 3
Surface preparation Anchor Profile Random checking ONGC – Spec . 2005 Rev. 3 25 to 50 microns I.R
H RW R
Paint thickness( Final DFT) Digital coat measure Random checking ONGC – Spec . 2005 Rev. 3 FINAL DFT(365-450 I.R
including addendum, Rev. 0 micron) ONGC Spec H RW RW
2005
Page 3 of 6
2 Protective coating Paint Test Certificates Reviewal 100% ONGC – Spec . 2005 Rev. 3 ONGC – Spec . 2005 M.T.C
including addendum, Rev. 0 Rev. 3 including H R R
addendum, Rev. 0
Surface preparation Anchor Profile Random checking ONGC – Spec . 2005 Rev. 3 25 to 50 microns I.R
including addendum, Rev. 0 H RW R
Paint thickness( Final DFT) Digital coat measure Random checking ONGC – Spec . 2005 Rev. 3 FINAL DFT(365-450 I.R
including addendum, Rev. 0 micron) ONGC Spec H RW RW
2005
Page 4 of 6
1 a) Gear Box M.T.C / Check Test Report / Visual 100% Mfg.Drawing/App.P.S Mfg.Drawing Test Report H R R
b) Hyd. Motor Routine&Type Test
c) Hyd. Pump Report/Calibration Report
d) Slew Ring & Its Bolt, Nuts
e) Electrical &
Instrumentation (Light
Fixtures, Panels, etc)
FACTORY ACCEPTANCE Main host & Auxiliary hoist Customer spec. 5301F -API
1 TEST & FINAL load & speed test at Various Test 100% 2C & Approved FAT Customer spec. 5301F F.I.R H W W
INSPECTION Radi as per Load chart procedure
Page 5 of 6
Final Documentation review
12 & issue of release note, -/- -/- -/- -/- -/- H H H
placement of API medallion
LEGENDS: RE : RAINA ENGINEER, CA : CERTIFICATION AGENCY, H: HOLD, W: WITNESS, R: REVIEW, RW: RANDOM WITNESS, S.I.R.: STAGE
INSPECTION REPORT, F.I.R.: FINAL INSPECTION REPORT, R.I.R.: RECEIVIING INSPECTION REPORT.PS : PURCHASE SPECIFICATION.
Notes:
1) All structural material shall not be older than 2 years by the time of final use.
2) Painting Thickness(DFT) for all the components shall be carried out at the time of FAT randomly.
3) Inspection realease note to be issued byTPI / ONGC-CA.
Page 6 of 6