Right Factorz Projects PVT LTD Checklist For Cable Installation
Right Factorz Projects PVT LTD Checklist For Cable Installation
Right Factorz Projects PVT LTD Checklist For Cable Installation
Checked
by Inspected
Sr. No. Item Description Contractor by TCE
(Tick) (Tick)
CABLE INSTALLATION
Name
Designation
Signature &
Date
RIGHT FACTORZ PROJECTS PVT LTD SECTION: FORMAT
Checked by Inspected
Sr. No. Item Description Contractor by TCE
(Tick) (Tick)
Generally confirming to
cable tray notes an details
as per
1.2 specification no. __________________________________________
Availability of necessary
tools / tackles for
1.5 fabrication of cable trays /
1.6 Erection
Name
Designation
Signature &
Date
RIGHT FACTORZ PROJECTS PVT LTD SECTION: FORMAT
TCE-HW-ELV-001
Checklist for Panel/Rack Installation
SHEET:1 of 1
Checked by Inspected
Sr. No. Item Description Contractor by TCE
(Tick) (Tick)
Name Plate details are checked with the latest IFC Drawing
1.1 and found OK.
1.2 Factory test reports are found OK.
Switchgear installation is carried out as per the approved
1.3 Method of Statement.
Visual Inspection done for any transportation damages and
1.4 damages are not found.
1.5 Foundation checks done for level and found OK.
1.6 Base frames are fixed.
Panel/Rack are installed in sequence as per the latest IFC
1.7 drawing.
Name
Designation
Signature &
Date
RIGHT FACTORZ PROJECTS PVT LTD SECTION: FORMAT
Checked by Inspected
Sr. No. Item Description Contractor by TCE
(Tick) (Tick)
1.1
Loop checked for cables .
1,2
Junction box installed properly .
1.8
Speaker Installed aesthetically .
Name
Designation
Signature &
Date
RIGHT FACTORZ PROJECTS PVT LTD SECTION: FORMAT
Checked by Inspected
Sr. No. Item Description Contractor by TCE
(Tick) (Tick)
1.1
Loop checked for cables .
1,2
Junction box installed properly .
1.10
Devices Installed aesthetically .
Name
Designation
Signature &
Date