STANDARD OPERATING PROCEDURE

For TURBINE ROLLING

THERMAX POWER
(O&M )
Site Name: Allied Blenders & Distillers Pvt. Ltd.

Standard Operating Procedures

For TURBINE ROLLING

TL-SOP-

Date:

Page 1 of 4
STANDARD OPERATING PROCEDURE
For TURBINE ROLLING

1. SUMMARY OF THE OBJECTIVE


This document explains the safe, sequential Steps of before turbine rolling start up procedure.

SCOPE
This SOP is applicable for Recommendation or any improvement in the maintenance of the
equipment.
SAFTEY PPE’s TO BE USED:

Safety helmet
Safety shoes
Safety goggles
Safety Hand Gloves
Apron
Ear Muffs

2. SAFE OPERATING CHECKS

Sr. No. EQUIPMENT CHECKLIST UOM ACTUAL STATUS

YES NO

1 Start Lube oil pump

2 Lube oil temperature ⁰C

3 Lube oil filter DP Kg/cm2

4 STG bearing oil flow ensure in glass OK

5 Main oil tank level mm

6 Get dry steam from main steam line


drain
A Steam line trap – 1 Close

B Steam line trap – 2 Close

C Steam line drain valve – 1 Close

D Steam line drain valve – 2 Close

E Steam line trap by pass valve – 1 Close

F Steam line trap by pass valve – 2 Close

Page 2 of 4
STANDARD OPERATING PROCEDURE
For TURBINE ROLLING

G At the time of MSSV opening after & before Kg/cm2


steam line pressure if required.

H Closed MSSV integral valve After open


MSSV

J Warm-Up vent open & keep constant feed flow TPH


by the operation of start-up vent

7 Main steam line drain valve – 1 Open

8 Main steam line trap bypass drain valve -1 Open

9 Main steam line drain valve – 2 Open

10 Main steam line trap bypass drain valve – 2 Open

11 TSSV Close

12 TSSV by pass valve Close

13 Warm-Up vent valve Open

14 ESV Close

15 ESV inlet drain valve Open

16 Casing drain valve Open

17 Chamber drain valve Open

18 PRDS line drain valve Open

19 PRDS Safety valve Healthy

20 Lube oil cooler cooling water inlet valve Open

21 Lube oil cooler cooling water outlet valve Open as


per
temperature

22 Lube oil cooler oil valve Open

23 Gen. Air cooler cooling water inlet valve Open

24 Gen. Air cooler cooling water outlet valve Open

25 Availability of cooling tower fan 1

26 Availability of ACW pump 1&2

Page 3 of 4
STANDARD OPERATING PROCEDURE
For TURBINE ROLLING

27 ACW suction valve Open

28 Availability of lube oil pump AOP & EOP

29 All oil pumps suction & discharge valve Open

30 Availability of oil vapors fan 1

31 TGP emergency stop push button Should be


Release

1. Name of Field Engineer:


Signature :
Department :
Contact No. :
Permit Details:

2. Name of Control Room Engineer:


Signature :

3. Name of Shift Incharge:


Signature:

Page 4 of 4