Calculations for hook supports check:

Design data:
Force acting = 15 kN
Thickness of roof slab, D = 250 mm
Unit weight of water, ɣw = 9.81 kN/m3
fc' = 25 N/mm2
fy = 420 N/mm2
Clear cover (C.C.) = 25 mm
Diameter of bar = 12 mm
Factor of safety, Φ = 0.75
Length of the weld = 200 mm

UPN 50 x 500

100 100

20 mm dia rod

15 kN

Weld strength:
AISC-13th edition, ɸ Rn = ɸ Fw Aw
Steel construction Nominal strength, Fw = 0.6 FEXX
manual, FEXX (For E70 electrode weld) = 482.63 N/mm2
Chapter - J.2.4 Effective area, Aw = 0.707 t le

Considering 8 mm thick fillet weld


ɸ Rn = ɸ Fw Aw
=
Err:511
= 245.68 kN
Therefore ɸ Rn = 245.68 kN > 7.5
SAFE

Punching shear:

Channel section
50
mm
Concrete slab

500 mm

Effective depth, d = 219 mm


bo = 1976 mm

Vc = (1/3) fc' bo d
= 721.24

ɸ Vc = 0.75x721.24
Page 1 of 2
DATE
Aug-15
Designed UMA
LIFT SHAFT - HOOK SUPPORTS
Checked GP
REFERENCE CALCULATIONS OUTPUT
= 540.93 kN > 15
SAFE