Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

LOG Book

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 17

Pimpri Chinchwad Education Trust’s

Pimpri Chinchwad Polytechnic


(NBA Accredited and ISO 9001:2008 Certified Department)

Department of Mechanical Engineering


CAPSTONE PROJECT LOG
BOOK
2019-20
Group No.:

Title of the Capstone project:

Name of the Guide:

Mechanical Engineering Department Page 1


Content

Sr. No. Unit Page No.

1 Vision & Mission of Institute 3

2 Vision & Mission of Department 3

3 Student Details 4

4 Index for Evaluation 5

5 Activity Report 6

Mechanical Engineering Department Page 2


Vision and Mission
Institute Vision:

The institute envisages to be one among first top ten institutions and an autonomous institute in the state of
Maharashtra offering demand driven skill development program inclusive of Diploma in Engineering and
consistent high degree of professional development of students leading to successful career.

Institute Mission:

 To educate and train students in Engineering and Technology domains.


 To prepare them for successful employment in industry / business, self-enterprise,
 Higher education by providing quality system based teaching and learning processes.
 To identify themselves as good individuals, professionals and responsible citizens.

Program Vision

To be the centre for excellence in skill development and professional development for manufacturing sector
and promote the students for enhanced employment / entrepreneurship and life-long learning.

Program Mission

 To offer diploma in mechanical engineering through effective teaching and learning methods.
 To develop professional skills, commitment and discipline among the students.
 To develop employability and entrepreneurship qualities in students.
 To make students responsible citizens to serve society for its betterment

Mechanical Engineering Department Page 3


Students Details:-
Group No. :

Group Members Contact Number E-Mail Id

1)

2)

3)

4)

Name of the Guide :

Email ID :

Mobile No. :

Sponsoring Organization
(If applicable) :

Address:

Sign of Guide Sign of HOD

Mechanical Engineering Department Page 4


INDEX

Marks
Sr.No. Particular Date Dated Sign
12/07/2019
1 Activity Report-1

2 Activity Report-2 26/07/2019


09/08/2019
3 Activity Report-3
30/08/2019
4 Activity Report-4
13/09/2019
5 Activity Report-5
27/09/2019
6 Activity Report-6

TOTAL

Average

Mechanical Engineering Department Page 5


Activity Sheet (Fortnight Report-1) (First Week)
Date: 28/06/2019 - 05/07/2019 (First Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 6


Activity Sheet (Fortnight Report-1)(Second Week)
Date: 05/07/2019–12/07/2019 (Second Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 7


Activity Sheet (Fortnight Report-2) (First Week)
Date: 12/07/2019–19/07/2019 (First Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 8


Activity Sheet (Fortnight Report-2) (Second Week)
Date: 19/07/2019–26/07/2019 (Second Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 9


Activity Sheet (Fortnight Report-3) (First Week)
Date:26/07/2019–02/08/2019 (First Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 10


Activity Sheet (Fortnight Report-3) (Second Week)
Date: 02/08/2019-09/08/2019 (Second Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 11


Activity Sheet (Fortnight Report-4) (First Week)
Date: 09/08/2019–16/08/2019 (First Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 12


Activity Sheet (Fortnight Report-4) (Second Week)
Date: 23/08/2019– 30/08/2019 (Second Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 13


Activity Sheet (Fortnight Report-5) (First Week)
Date: 30/08/2019– 06/09/2019 (First Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 14


Activity Sheet (Fortnight Report-5) (Second Week)
Date: 06/09/2019 – 13/09/2019 (Second Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 15


Activity Sheet (Fortnight Report-6) (First Week)
Date: 13/09/2019 –20/09/2019 (First Week)

Points Discussed:

Remarks

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 16


Activity Sheet (Fortnight Report-6) (Second Week)
Date: –20/09/2019-27/06/2019(Second Week)

Points Discussed:

Remarks:

Sign Of Group Members Sign of Guide:


1. 3.
2. 4.

Mechanical Engineering Department Page 17

You might also like