Traffic Assignment Seee
Traffic Assignment Seee
Traffic Assignment Seee
Assign the vehicle trips shown in the following O-D trip table to the network, using the all-or-
nothing assignment technique. To summarize your results, list all of the links in the network and
their corresponding traffic volume after loading.
Highway Network:
Solution
The all-or-nothing technique simply assumes that all of the traffic between a particular
origin and destination will take the shortest path (with respect to time).
For example, all of the 200 vehicles that travel between nodes 1 and 4 will travel via
nodes 1-5-4.
The tables shown below indicate the routes that were selected for loading as well as the
total traffic volume for each link in the system after all of the links were loaded.
Nodes Link Travel
From To Path Time Volume
1 2 1-2 8 100
3 1-2,2-3 11 100
4 1-5,5-4 11 200
5 1-5 5 150
2 1 2-1 8 400
3 2-3 3 200
4 2-4 5 100
5 2-4,4-5 11 500
3 1 3-2,2-1 11 200
2 3-2 3 100
4 3-4 7 100
5 3-4,4-5 13 150
4 1 4-5,5-1 11 250
2 4-2 5 150
3 4-3 7 300
5 4-5 6 400
5 1 5-1 5 200
2 5-4,4-2 11 100
3 5-4,4-3 13 50
4 5-4 6 350
Link Volume
1-2 200
2-1 600
1-5 350
5-1 450
2-5 0
5-2 0
2-3 300
3-2 300
2-4 600
4-2 250
3-4 250
4-3 350
4-5 1300
5-4 700