Gyandzha AB Giant Report
Gyandzha AB Giant Report
Gyandzha AB Giant Report
TOP Restrictions/Info
Procedures:
Procedure Name: SID RWY 30 Jepp[X] Host[ ] Page: 10-3B Effective: 27-OCT-2005
DEPARTURE REVIEW 2006-883
Gyandzha, Azerbaijan (UBBG)
1. Findings of review:
a. KEDAB 1B/ADVIN 1B RADAR REQUIRED
b. ED 1B NDB REQUIRED
2.3. Aircrew must review and comply with TERPS review letter
requirements.
1. Findings of review:
a. Procedure minimums:
2.1. Aircrew must review and comply with TERPS review letter
requirements.
2.2. Radar required.
Approved By:
[X] AMC/DO [ ] ACC/DO [ ] AFMC/DO [ ] AETC/DO [X] USAFE/DO
[ ] PACAF/DO [ ] AFSOC/DO [ ] AFSPC/DO [ ] AFRC/DO [ ] ANG/DO
Points of Contact
No Phone Number Data
UNCLASSIFIED LCWEB 1.14.0.0/CDB v1.8h Tue, 23 Jan 2007 17:17:22 GMT Standard Time