Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Suresh Kumar K: QA/QC Engineer-MEP

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Curriculum Vitae SURESH KUMAR K

QA/QC Engineer-MEP
| Mobile: +91-9444428585 | Email : suresh4engineer@outlook.in

OBJECTIVE:
To be able belong in a reputable and respected company, seeking a better job
opportunity which qualification, professional talent and achieve excellence in the field
by applying acquired knowledge, experience and determination to one's duty.
Personal Details
PROFILE SUMMARY:
Name :SURESHKUMAR
➢ I have Total 7-years’ experience in QA/QC Engineer as well as T&C Quality
engineer, Quality management system, MEP project quality assurance and
Father Name : KANDASAMY
control in Building project & metro project.

Mother Name : PADMAVATHI


➢ Presently Employed in Rizzani de eccher S.p.A, qatar under Q-Rail Project
(Qatar University & Lusail Metro Station).
Age : 30 Years Scope: Quality control related to Construction & Testing and
commissioning activities for MEP works, Quality assurance related
Marital Status : Married work for method statement, ITP preparationl and QRP-Quality Record
Package and T&C Test packs preparation.
Nationality : Indian
➢ Previously working in Larsen & Toubro- E&A, Doha qatar under Q-Rail project
D.O. B : 24.06.1988 (Total 8 Station)
Scope: Quality control related to Construction & Testing and
commissioning activities for MEP works, Quality assurance related
Language : English, Tamil,
work for method statement, ITP preparation, O&M manual, Training
Telugu
manual and QRP-Quality Record Package and T&C Test packs
preparation, Internal Audit.
Present Address:

Building No: 123, Street 901, ➢ IRCA Certified Lead Auditor ISO9001:2015-QMS-Quality Management
Al Thummama,Doha, Qatar System.

EDUCATIONAL SUMMARY:
Permeant Address:
❖ Bachelor’s degree of Electrical & Electronics Engineering
1/624, Jeyaramnagar, MEPCO Schlenk Engineering College, India (Anna university) in the
Aruppukottai-TK, year 2008 -2011
Virudhunagar- Dist., Madurai
Tamilnadu, India ❖ Diploma in Electrical and Electronics Engineering
Sri Sowdambika Polytechnic College, India in the year 2005-2008
Passport Details:

Passport No :J6939922 QUALITY CERTIFICATE:


Place of Issue :Madurai
Date of Expiry:19.07.2021 Certified Lead Auditor: IS0 9001:2015 (QUALITY MANAGEMENT SYSTEM)
with IRCA approval Certificate.
FAMILIAR STANDARD:
Qatar Residence Details:
➢ ISO 9001:2015 QMS Requirement BS Standard
Qatar ID : 28835661859 ➢ NEBB Procedural Standards (Seventh Edition)
Date of Expiry :25/11/2019 ➢ NFPA 70 -National Electrical Code.
NOC : Available ➢ NFPA 72 -National Fire Alarm Cod
➢ Qatar Construction Standard “QCS- 2014”.
➢ DEWA-Regulations-Electrical-Installations-2017-Edition in UAE
➢ “KAHRAMAA” standards in Qatar
WORK
EXPERIENCE: Job Responsibility:

Experience-1: • Performed internal Audit as per Quality Plan and PQP &
Prepared KPI in every monthly.
Company Name: • Installation test and design criteria will be verified
Rizzani De Eccher S.p.A, Qatar • To verify the Pre-commissioning test as per Approved MES
• Preparation of Cable testing along with Calibrated equipment
Project: Qatar Metro Project • Earthing megger test perform prior to startup the equipment
(Redline North Elevated & At • Testing results are will be verified based on design criteria
Grade) • Verify the Testing equipment calibration before starting the test
• Hydro testing will be performed as per MES
Duration : 1 Years & 1Months • Prior to commission the pump, through system test results will
(Dec 2016 – Aug 2017), be verified
(Jan 2019 – Till working) • Coordinating with O&M Manual personals to confirm the T&C
spare parts listing
Position : QA/QC Engineer
• Final Preparation document like that Quality record package &
T&C Test Pack
• Prepared Quality Management System documentation is
properly managed, updated, communicated within T&C
organization
• Provide and maintain Staff training to T&C teams as per
approved T&C Training manual
• Preform and support to represent the Project during quality
assurance audits conducted by client, management or
regulatory agencies
• Recorded and maintaining the Register for inspection request,
Non-conformance, NCR and failures/anomalies raised during
T&C activates
• Support to prepare the Test readiness reviews (TRR) for system
and subsystem in anticipation of the T&C activities including all
the necessary documentation and evidences related to each
TRR.
• Prepared and timely closed T&C Punchlist and Maintain Master
punch list register.
• Performed testing and commissioning activates (FAT- Factory
acceptance Test, IRN - Installation Release Note, PSAT- Partial
Stand Test, SAT- Stand Alone Test &SIT- System Integration Test)
Job Responsibility:
Experience-2:
• Establishment of project quality plan, projectspecific Quality
assurance procedures, method statements, ITP's,Quality check
Company Name:
lists.
Larsen & Toubro- E&A, Qatar
• Establishment& Implement as per Project Quality Plant.
• Material Quality Assurance & control, Installation/testing
Project: Qatar Metro Project
inspection and approval.
(Redline North Elevated & At
• All Inspection to be Done as per Approval ITP's and Method
Grade)
statement.
Duration:1 Years & 5months • Prepare Key Performance Indicators (KPI)and maintain Quality
(Aug 2017- Jan 2019) Register.
• Coordination with the Supervisory Consultant (PMC) to carry
Position: Sr. Engineer QA/QC out inspection/testing of the completed works.
• Raise and coordinate the closure of NCR's in a timely manner.
• Prepare and submits Request for Inspection (RFI)on Completed
work to client for their approval.
• All installation of electrical activates co-ordinate with BIM
module & mechanical service.
• Establishment& Implementation of ISO 9001:2015.
• Continuous ImprovementActivates for Quality, Corrective
action.
• Knowledge of industry code and standards related to Electrical
installation and testing (QCS-2014, KAHARAMAA
Standards,NFPA 70&72)
• Prepare Daily QA/QC report for Inspection, T&C Inspection,
Non-conformance and Observation.
• Prepare Inspection & Document for Each Testing Commission
phase (FAT, PSAT, SAT, SIT) Provide and maintain Staff training
to T&C teams as per approved T&C Training manual
• Preform and support to represent the Project during quality
assurance audits conducted by client, management or
regulatory agencies
• System integration testing will be monitored along with BACS
contractor.
• Preform actives for investigate and closeout customer
complaints and non-conformance issues related to T&C
activates.
• Recorded and maintaining the Register for inspection request,
Non-conformance, NCR and failures/anomalies raised during
T&C activates.
• Support to prepare the Test readiness reviews (TRR) for system
and subsystem in anticipation of the T&C activities including all
the necessary documentation and evidences related to each
TRR.
• Prepared and timely closed T&C Punchlist and Maintain Master
punch list register.
Experience-3: Job Responsibility:

• Participate in development of the commissioning plan, roles and


Company Name:
responsibilities. implement commissioning plan
Sun Industrial Automation &
• Responsible for providing construction site engineering resources
Solution, Chennai, India
and expertise during construction phases of the project.
• Resolve issues in Electrical drawings and specifications by
Project:TWAD (Water Supply &
conferring with the consultants.
Water Treatment)
• Monitor the implementation of project construction to ensure its
Duration:4 Years & 9Months compliance
(Jan 2012-Oct 2016) • with the plans, specifications, and contract provisions.
• Installation of 3 core 240 sq.mm 11kv, XLPE power cable laying
Position: Electrical Engineer and cable jointing and termination
• Installation of 4 core 95Sq.mm,50Sq.mm,16sq.mm LV cable
laying cable jointing and termination
• Installation, Testing and Commissioning of lighting system feeder
pillars
• 33KV switch-yard equipment’s as- Isolator with Earth-Switch, SF6
circuit Breakers,
• Transformers, Lightning Arrester etc.
• Handling erection and commissioning of equipment, Plant
machineries and systems
• mainly connecting MCC Panel to the machine.
• Cable sizing and schedules, SLD and wiring diagram.
• Installation, Commissioning and Testing of LV & HV Switchgears
and Motors (6.6KV,
• 1000HP) & (11KV, 720HP).
• Responsible for implementation of 5S activities and other TPM
related activities.
• Knowledge of PLC, SCADA and Building Automation Control
System

DECLARATION:

I hereby solemnly affirm that all the details provided above are true to my
knowledge and belief. I shall carry myself in a manner that lends dignity to
the organization and worthy enough of the person.

Place: India Signature

Date: (Suresh Kumar)

You might also like