Quotation For Screeding 3
Quotation For Screeding 3
Quotation For Screeding 3
Chairman
Apapa Local Government Council
QUOTATION FOR SCREEDING AND PAINTING
STAIRCASE
Description Qty Rate Amount
1. Cement for Screeding the wall staircase 7 bags 3,200 22,400.00
2. P.O.P Paint to missing cement 17 drums 8,500 144,500.00
3. Top bond to add with paint 8 gallons 7,000 56,000.00
4. Sand paper the wall 15 yards 500 7,500.00
5. Paint the ceiling white emulsion 4 drum 9,000 36,000.00
6. Undercoat the wall with Emulsion 4 drums 9,000 36,000.00
7. Finishing the wall with Satin 7 drum s 37,000 259,000.00
8. Paint the Burglary with Block gloss 5 gallons 8,500 42,500.00
9. Gold Paint for the ring on Burglary 2 gallon 13,000 26,000.00
10. Thinner for missing Gloss 3 gallon 5,000 15,000.00
644,900.00
CHAIRMAN WING
1. Cement for Screeding the wall 6 bags 3,200 19,200.00
2. P.O.P for Screeding the wall 12 drums 8,500 102,000.00
3. Top Bond to add with paint 5 gallons 7,500 37,500.00
4. Sand paper for the wall 12 yards 550 6,600.00
5. Undercoat the wall before paint satin 10 drums 8,500 85,000.00
6. Paint the burglary with white gloss 4 gallons 8,000 32,000.00
6. Finishing the wall with Satin 6 drums 37,000 222,000.00
8. Thinner for missing gloss paint 3 gallons 5,500 16,500.00
520,800.00
VICE CHAIRMAN WING
1. Cement for Screeding the wall 6 bags 3,200 19,200.00
2. Paint P.O.P for Screeding the wall 12 drums 8,500 102,000.00
3. Top Bond for mixing paint 6 Gloss 8,500 51,000.00
4. Sand paper the wall before painting 10 yards 4,500 45,000.00
5. Undercoat the wall before painting 8 drums 8,500 68,000.00
6. Finishing the wall with Satin 6 drums 37,000 222,000.00
507,200.00
TOTAL 1,672,900.00
Plus 11% Percent 152,082.00
Transport 40,000.00
GRAND TOTAL 1,864,982.00
……………………………..
Mr. J. O Abolarinwa Adesogan
Project Director