Sludge Dewatering Tube Utilization - Palm Oil Hunter
Sludge Dewatering Tube Utilization - Palm Oil Hunter
Sludge Dewatering Tube Utilization - Palm Oil Hunter
1.0 Objective
1. To determine amount of Slurry POME filled in the Geo Tube
2. To determine amount of moisture contains in Slurry POME in Geo Tube.
Length : 27.5 m
Circumference : 8.8 m
Capacity : 150 MT
Designed Height of filling : 1.2 m
3.0 Methodology
a. Three 3 type of geo tube was selected with different drying period where
Geo tube No.1: 3 days of drying period (Rain Fall from 1-3 days: 0MM)
Geo tube No.2: 5 days of drying period (Rain Fall from 1-5 days: 20MM)
Geo tube No.3: 8 days of drying period (Rain Fall from 1-8 days: 41MM)
SURFACE
L h
AREA
a
b
B
Figure 1: Geo Tube Diagram with dimension
4.1 Calculation
Parameters
Parameters
Parameters:
5.1.1 Geo tube required for solid produced/Year = Total solid produced / Capacity of one Geo Tube
= 26112 / 136
= 192 bags
5.1.1 Geo tube required for solid produced/Year = Total solid produced / Capacity of one Geo Tube
= 17411.544 / 136
= 128.03 bags
≈ 130 bags