Technical Submittal

NITOBOND AR
(Acrylic emulsion cement modifier and concrete bonding agent)

Fosam Company Limited


Head Office
telephone: fax: email:
PO Box 11081
Jeddah – 21453 +966 (12) 637 5345 +966 (12) 637 5891 fosam@fosroc.com
Saudi Arabia
C.R. No. 31273
Paid up Capital: SR3,000,000
www.fosroc.com Registered Office: Industrial Area, Phase 4, Road No. 102, Street No. 82
constructive solutions

Technical Datasheet
Nitobond AR constructive solutions

Acrylic emulsion cement modifier and concrete


bonding agent

Uses Properties

For improving and bonding floor toppings, renders and Mechanical characteristics
mortars; repair of worn, damaged or spalled concrete.
Typical improvement in mechanical properties of a 3:1
Recommended primer for the Renderoc Cementitious Repair sand/cement mortar using Nitobond AR the test methods
System. used were in full accordance with BS 6319 at 28 days - air
cured.
Advantages
Typical
Test method Control results
Single component gauged as required.
Tensile strength *
N/mm2 2.0 2.6
Simply brushed onto concrete as a primer. (BS 6319 Part 17:1985);
Flexural strength *
Provides excellent bond to concrete, masonry, N/mm2 5.8 10.2
stonework, plaster and block-board. (BS 6319 Part 3:1990):
Curing efficiency
Improves tensile and flexural properties. Allows thin (BS 7542:1992): > 55%
section applications.
* results may vary due to cement variations & w/c ratio
Compatible with all common hydraulic cements.
Application instructions
Suitable for use in Middle East conditions. Used as a
curing membrane.
Surface preparation
Is economical in use. Clean the surface and remove any dust, unsound or
contaminated material, plaster, oil, paint, grease, corrosion
Description deposits or algae. Where breaking out is not required,
roughen the surface and remove any laitence by light
Nitobond AR a modified acrylic emulsion is specially scabbling or grit-blasting.
designed for use as a bonding aid, curing agent and gauging
liquid for cementitious systems. It is resistant to hydrolysis Expose fully any corroded steel in the repair area and
and can therefore be used for external application. remove all loose scale and corrosion deposits. Steel should
be cleaned to bright condition paying particular attention to
the back of the exposed steel bars. Grit-blasting is
Technical support recommended for this process.

Fosroc offers a comprehensive range of high performance, Reinforcing steel priming


high quality construction products. In addition, Fosroc offers a
technical support package to specifiers, end-users and Apply one full coat of Nitoprime Zincrich to all exposed steel
contractors, as well as on-site technical assistance in reinforcement and allow to dry prior to continuing. If any
locations all over the world. doubt exists about having achieved an unbroken film, a
second application should be made and allowed to dry prior
Limitations to continuing.

Nitobond AR mortars, toppings and renders should not be Application of bonding aid
used when the temperature is below 5°C and falling. Neither
should they be exposed to moving water during application. The substrate should be thoroughly soaked with clean water
Exposure to heavy rainfall prior to the final set may result in with any excess removed prior to commencement of the
surface scour. If any doubts arise concerning temperature, works. Scrub Nitobond AR into the substrate, avoid
application or substrate conditions, consult the local Fosroc puddling and remove any excess. The repair mortar or
office. topping should be applied whilst the primer is still tacky.

Page 1
Nitobond AR
Curing Fire

Cure the repair mortar or topping using Nitobond AR to Nitobond AR is non-flammable.


prevent rapid loss of water. In severe drying conditions
additional curing methods may be necessary. Protect
Additional information
uncured mortar from frost and rain.

Cleaning Fosroc manufactures a wide range of products specifically


designed for the repair and refurbishment of damaged
reinforced concrete. These include hand-placed and spray
Nitobond AR should be removed from tools, equipment and
grade repair mortars, fluid micro-concretes, chemical-
mixers with clean water immediately after use. Cured
resistant epoxy mortars and a comprehensive package of
material can only be removed mechanically.
protective coatings. In addition, a wide range of
complementary products is available. This includes joint
Estimating sealants, waterproofing membranes, grouting, anchoring and
specialised flooring materials.
Supply
For further information about products, training videos or
Nitobond AR: 1, 4 and 25Litre packs publications, contact the local Fosroc office.

Coverage and yield

Nitobond AR: 6 to 8 m2 / litre as a primer


4 to 5 m2 / litre as a curing agent

Storage

Shelf life

All products have a shelf life of 12 months at 20°C if kept in a


dry store in the original, unopened containers.

Precautions

Health and safety

Cementitious mortars modified with Nitobond AR contain


cement powders which, when mixed or become damp
release alkalis which can be harmful to skin. During use
avoid inhalation of dust and contact with skin and eyes. Wear
suitable protective clothing, gloves and eye/face protection.
The use of barrier creams provide additional skin protection.
Should accidental skin contact occur, remove immediately
with a resin removing cream followed by soap and water. Do
not use solvent. In case of contact with eyes, rinse
immediately with plenty of clean water and seek medical
advice. If swallowed seek medical attention immediately - do
not induce vomiting.

Important note:
Fosroc products are guaranteed against defective materials and manufacture and are sold subject to its standard Conditions
for the Supply of Goods and Services, copies of which may be obtained on request. Whilst Fosroc endeavours to ensure that
any advice, recommendation, specification of information it may give is accurate and correct, it cannot, because it has no direct
or continuous control over where or how its products are applied, accept any liability either directly or indirectly arising from the
use of its products, whether or not in accordance with any advice, specification, recommendation of information given by it.

Fosam Company Limited


Head Office Telephone: +966 12 637 5345 Fax: +966 12 637 5891 email: fosam@fosroc.com
Post Box 11081 Regional Offices
Jeddah Sales Office Tel: (012) 608 0999 Fax: (012) 638 0693 Yanbu Tel: (014) 322 4280 Fax: (014) 391 2980
Jeddah – 21453
Jeddah Showroom Tel: (012) 665 0187 Fax: (012) 667 4844 Makkah Tel: (012) 542 0869 Fax: (012) 542 0869
Saudi Arabia Riyadh Tel: (011) 482 9303 Fax: (011) 482 7562 Medinah Tel: (014) 855 0091 Fax: (014) 855 0047
Dammam Tel: (013) 814 1282 Fax: (013) 814 1581 Jubail Tel: (013) 362 3904 Fax: (013) 362 3875

www.fosroc.com Khamis Mushayt Tel: (017) 250 0469 Fax: (017) 250 0469 CSD Tel: (012) 608 0999 Fax: (012) 638 0693
Registered Office: Industrial Area, Phase 4, Road No. 102, Street No. 82
Page 2 FO SA/NITOBOND AR/2108/16
constructive solutions

Material Safety
Datasheet
REVISION DATE 06.04.2013

SAFETY DATA SHEET


NITOBOND AR

1 IDENTIFICATION OF THE SUBSTANCE/PREPARATION AND OF THE COMPANY/UNDERTAKING

PRODUCT NO. M1703000


SYNONYMS, TRADE NAMES NITOBOND AR
APPLICATION Acrylic Primer
SUPPLIER FOSAM COMPANY LTD
Phase 4,Road 414 , Street 407
Post Box 11081 Jeddah 21453
K.S.A
+96626375345
+96626080999
+96626375891
EMERGENCY TELEPHONE +966 26375345 , +96626080999
CONTAINER SIZE 1 Ltr 4 Ltr 5 Ltr 25 Litre Pail 210 Litre Drum
MANUFACTURER Fosam Company Limited Industrial Area Phase 4 Road # 414 Street 407 Post Box 11081 Jeddah 21453
K.S.A

2 HAZARDS IDENTIFICATION

Not regarded as a health or environmental hazard under current legislation.


CLASSIFICATION (1999/45) Not classified.

3 COMPOSITION/INFORMATION ON INGREDIENTS

COMPOSITION COMMENTS
Acrylic emulsion, water

4 FIRST-AID MEASURES

GENERAL INFORMATION
Eyes: Irrigate immediately with copious quantities of water for several minutes. Obtain medical attention if
irritation persists.
Skin: Wash thoroughly with soap and water or suitable skin cleanser as soon as possible.
Inhalation: Remove from exposure - unlikely to occur.
Ingestion: Wash out mouth with water. Obtain medical attention.

5 FIRE-FIGHTING MEASURES

EXTINGUISHING MEDIA
Suitable Extinguishing Media: Carbon dioxide, powder, foam or water fog - Do not use water jets.
Special Exposure Hazards: Material can splatter above 100°C. Polymer film can burn. Irritant fumes.
Special Protective Equipment: Self-contained breathing apparatus.

6 ACCIDENTAL RELEASE MEASURES

PERSONAL PRECAUTIONS
Wear protective gloves and, in case of splashes, goggles/face shield too.
ENVIRONMENTAL PRECAUTIONS
Prevent entry into drains, sewers and water courses.
SPILL CLEAN UP METHODS
Soak up with inert absorbent or contain and remove by best available means. Gather into containers.

7 HANDLING AND STORAGE

1/ 3
REVISION DATE 06.04.2013

NITOBOND AR
USAGE PRECAUTIONS
avoid skin and eyes contact
STORAGE PRECAUTIONS
Store in cool, dry area.

8 EXPOSURE CONTROLS/PERSONAL PROTECTION

INGREDIENT COMMENTS
No exposure limits noted for ingredient(s).
PROTECTIVE EQUIPMENT

ENGINEERING MEASURES
No specific ventilation requirement noted.

9 PHYSICAL AND CHEMICAL PROPERTIES

APPEARANCE Liquid
COLOUR Milky.
ODOUR Slight / faint.
RELATIVE DENSITY 1.08
pH-VALUE, CONC. SOLUTION 4.5 - 5.5

10 STABILITY AND REACTIVITY

STABILITY
Stable.
CONDITIONS TO AVOID
Temperatures below 2'C.
MATERIALS TO AVOID
None known.
HAZARDOUS DECOMPOSITION PRODUCTS
Thermal decomposition may yield acrylic monomers.

11 TOXICOLOGICAL INFORMATION

GENERAL INFORMATION
The following toxicological assessment is based on a knowledge of the toxicity of the product's components.
Oral LD50, rat >5000 mg/kg.
Dermal LD50, rat/rabbit >5000 mg/kg.
Health Effects
On Eyes: May cause transient irritation.
On Skin: Unlikely to irritate on brief or occasional exposure.
By Inhalation: Low volatility makes inhalation unlikely at ambient temperatures.
By Ingestion: Low order of acute toxicity. May cause irritation of mouth, throat and digestive tract.

12 ECOLOGICAL INFORMATION

MOBILITY
Mobile liquid.
BIOACCUMULATION
Not expected to be bioaccumulative
DEGRADABILITY
Inherently biodegradable.

13 DISPOSAL CONSIDERATIONS

2/ 3
REVISION DATE 06.04.2013

NITOBOND AR
DISPOSAL METHODS
Disposal must be in accordance with local and national legislation.
Unused Product: Dispose of in an approved manner. Do not empty into drains, sewers or water
courses.
Used/Contaminated Product: As for Unused product.
Packaging: May be steam cleaned and recycled.

14 TRANSPORT INFORMATION

15 REGULATORY INFORMATION

RISK PHRASES
NC Not classified.
SAFETY PHRASES
NC Not classified.
GUIDANCE NOTES
Hazard Label Data:-
This product is NOT classified as dangerous for supply
Safety Phrases: Avoid contact with skin and eyes.
In case of contact with eyes, rinse immediately with plenty of water and seek medical
advice.
EC Directives: Dangerous Substances Directive, 67/548/EEC and adaptations.
Dangerous Preparations Directive, 88/379/EEC.
Safety Data Sheets Directive, 91/155/EEC.
Statutory Instruments: Chemicals (Hazard Information and Packaging for Supply) (Amendment) Regs. 1996 (SI
1092).
Control of Substances Hazardous to Health Regs. 1994 (SI 3246).
Environmental Protection (Duty of Care) Regs. 1991 (SI 2839).
Codes of Practice: Waste Management. The Duty of Care.
The above publications are available from HMSO

16 OTHER INFORMATION

GENERAL INFORMATION
The data and advice given apply when the product is used for the stated application or applications. The product is not sold as suitable for
any other application. Use of the product for applications other than as stated in this sheet may give rise to risks not mentioned in this
sheet. The product should not be used other than for the stated application or applications without seeking advice from Fosam Company (
Fosroc).
If this product has been purchased for supply to a third party for use at work, it is the purchaser's duty to take all necessary steps to secure
that any person handling or using the product is provided with the information in this sheet.
It is the responsibility and duty of the employer to inform employees and others who may be affected of any hazards described in this sheet
and of any precautions which should be taken.
This sheet does not constitute or substitute for the users own assessment of workplace risk, as required by other health and safety
legislation.
Further copies of this Safety Data Sheet may be obtained from Fosroc Fosam Compamy.
REVISION DATE 06.04.2013
REV. NO./REPL. SDS 02
GENERATED
SDS NO. SDS M1703000

DISCLAIMER
The information on this data sheet represents our current data and is reliable provided that the product is used under the prescribed conditions and in
accordance with the application specified on the packaging and/or in the technical guidance literature. Any other use of the product which involves using
the product in combination with any other product or any other process is the responsibility of the user.
3/ 3
constructive solutions

Method Statement
Method statement constructive solutions

Application of Nitobond AR, Acrylic Emulsion Cement Modifier


and Concrete Bonding Agent

Concrete substrate priming


1 The concrete primer shall be Nitobond AR, a single component acrylic Primer.

2 The Nitobond AR shall be applied while concrete surface is damp. If the concrete surface has
dried, it shall be wetted out using a hand-held spray or by the application of clean water by brush.

3 Nitobond AR shall be used directly from the drum and shall be applied to all prepared concrete
surfaces using a 25-30 mm wide standard paint brush. Special care shall be taken to ensure all
irregularities in the surface are properly coated, particularly behind steel reinforcing bars.

4 Nitobond AR shall be allowed to cure for 10-20 minutes maximum, depending on drying
conditions. The repair mortar shall be applied before Nitobond AR is dry, the optimum time being
when it becomes ‘tacky’.

5 If Nitobond AR dries before the repair mortar can be applied, a second coat shall be worked well
into the concrete surface, again by brush. This shall be allowed to cure until it becomes ‘tacky’.

Nitobond AR
A single component acrylic emulsion cement modifier and concrete bonding agent for floor toppings,
renders and mortars. it is a recommended primer for the Renderoc cementitious repair system. It is
also used as a curing membrane reducing water loss and ensuring good hydration.

Fosam Company Limited


Head Office telephone: fax: email:
PO Box 11081
+966 (12) 637 5345 +966 (12) 637 58 91 fosam@fosroc.com
Jeddah – 21453
Saudi Arabia
Certificate number IND93024

www.fosroc.com Registered Office: Industrial Area, Phase 4, Road No. 102, Street No. 82
constructive solutions

Test Reports
Date: 21 Apr. 2013
AL HOlY· SlANGER CLIENT:
FOSAM COMPANY LIMITED
(FOSROC) TWO No.: 23002741

Inv.: To Follow
=.o. BOX 11081, JEDDAH, KSA
Report No.: 51399

CHEMICAL ANAL VSIS Page : 1 of 1

"TEST REPORT ON BONDING SAMPLE"

Sample Identification NITOBOND AR


(Single Component)

Sampled By FOSROC CO. LTD.


Date Sample Received 15.04.2013
AHS Lab. Ref. No. 23002741 / 003
Required Test VOC test

I RESULTS I

Test Description Method Results

ASTM D 2369
Volatile Organic Compound (VaC), g/Iit 7
ASTM D 3960

NAE M . c.
~----'\
A. N. M. OMAR, M. Se.
Manager Assistant Manager
Materials Analysis Oept. Materials Analysis Oept.
For AL HOTY-STANGER LTD. CO. Test Method Variation: NONE
I This report relates only to the sample tested and shall only be reproduced in full with the written approval of AI Hoty-Stanger testing laboratory.

INDEPENDENT LABORATORIES & MATERIALS TESTING


P.O.BOX 1122 AL-KHOBAR 31952 - TEL: (03) 8891000 (11 LINES) / 8980958 / 8642539
Jubail Tel:(03) 341 - 6791 - Hofyf Tel: (03) 586 - 3210 - Riyadh Tel: (01) 478-4292 - Jeddah Tel: (02) 660-1924 - Yanbu Tel (04) 322-5495 - Abu Dhabi Tel (02) 5542234 - Dubai Tel: (04)3472201 - Jebel Ali Tel (04) 8818451
constructive solutions

Job References
Job References for Nitobond AR
Sorted by ascending Project Category and ascending Project Date

Project Title Sector Segment Main Contractor Country Quantity Units Date
CONSTURTION OF JUBAIL UNIVERSITY, ROYAL AL KIFAH CONTRACTING
EDUCATION Saudi Arabia 110 25 L 2016 -2017
MARDUMAH RC- C32 COMISSION CO
TECHNICAS REUNDERS /
FADHLI GAS PROGRAM – PACKAGE 2 OIL & GAS SAUDI ARAMCO AL MUHAIDIB, BABTAIN, Saudi Arabia 80 25 L 2016 - 2017
EARTH GIFT CO
TECHNICAS REUNDERS /
FADHLI GAS PROGRAM – PACKAGE 2 OIL & GAS SAUDI ARAMCO Saudi Arabia 630 4L 2016 - 2017
AL NABA CONTRACTING
SENDAN
SABIC – SHUTDOWN & MAINTENANCE PETROCHEMICAL INDUSTRIAL Saudi Arabia 69 25 L 2015 – 2017
INTERNATIONAL CO
SENDAN
SABIC – SHUTDOWN & MAINTENANCE PETROCHEMICAL INDUSTRIAL Saudi Arabia 36 4L 2015 – 2017
INTERNATIONAL CO
MANARAH AL JUBAIL
SABIC – SHUTDOWN & MAINTENANCE PETROCHEMICAL INDUSTRIAL Saudi Arabia 1,122 4L 2015-2017
CONST CO. LTD
KIL JIN KANG &
SABIC – IBN SINA PAMMA PROJECT PETROCHEMICAL INDUSTRIAL PARTNERS Saudi Arabia 90 4L 2015 – 2017
CONSTRUCTION
POWER PLANT PP14 Utilities SAUDI ARCHIRODON Saudi Arabia 138 25 LITRES 2015 to 2017
RIYADH METRO PROJECT Transport BACS Saudi Arabia 383 25 Litres 2015 to 2017
RIYADH METRO PROJECT Transport BACS Saudi Arabia 198 4 litres 2015 to 2017
RIYADH PUBLIC TRANSPORT CONTROL Saudi Arabia
Utilities Saudi Lebanese Tarouk 358 4 Litres 2015 to 2017
CENTRE
POWER PLANT PP14 Utilities SAUDI ARCHIRODON Saudi Arabia 138 25 LITRES 2015 to 2017
RIYADH METRO PROJECT Transport BACS Saudi Arabia 383 25 Litres 2015 to 2017
RIYADH METRO PROJECT Transport BACS Saudi Arabia 198 4 litres 2015 to 2017
RIYADH PUBLIC TRANSPORT CONTROL
Utilities Saudi Lebanese Tarouk Saudi Arabia 358 4 Litres 2015 to 2017
CENTRE
SAUDI ARAMCO – RASTANURA PLANT M.S. AL SUWAIDI
OIL & GAS SAUDI ARAMCO Saudi Arabia 124 4L 2015 - 2017
SHUTDOWN & MAINTENANCE INDUSTRIAL SERVICES
WATER & NABIL A. ABU NAHYA &
MARAFIQ MAINTENANCE WORK - CANAL UTILITIES Saudi Arabia 283 4L 2015 - 2017
POWER PART. CO
ROYAL MODERN ARAB
MARINE & PROTECTION WORK – RC – C36 UTILITIES Saudi Arabia 1080 4L 2015 - 2016
COMISSION CONSTRUCTION CO
S.K. ENGINEERING &
WASIT GAS PLANT - WGPP OIL & GAS SAUDI ARAMCO Saudi Arabia 650 4L 2015-2016
CONSTRUCTION CO
CONSOLIDATED
WASIT GAS PLANT - WGPP OIL & GAS SAUDI ARAMCO CONTRACTORS CO. Saudi Arabia 135 25 L 2015 - 2016
(CCC)
EASTERN CEMENT
EASTERN CEMENT FACTORY CEMENT PLANT INDUSTRIAL Saudi Arabia 12 25 L 2016
FACTORY
SAUDI ARAMCO – ABU ALI SUBSTATION UTILITIES POWER AL NABA CONTRACTING Saudi Arabia 195 4L 2015
ABDULLAH KHALIFA &
SABIC – SHUTDOWN & MAINTENANCE PETROCHEMICAL INDUSTRIAL Saudi Arabia 116 4L 2015
SONS GROUP
CONSTURTION OF JUBAIL UNIVERSITY, ROYAL AL KIFAH CONTRACTING Saudi Arabia
EDUCATION 30 4L 2015
MARDUMAH RC- C32 COMISSION CO
PACKAGE 4: SHAYABAH IGHC (INLET GAS Power Oil, Gas,
Utilities SAMSUNG Engineering Saudi Arabia 160 Litres 18/09/2014
HANDLING CAPACITY) Coal
Power Hydro &
G S Contracting Saudi Arabia 10 Packs 17/09/2014
Wave
NEW KING ABDUL AZIZ INTERNATIONAL
Transport Airports SBG-ABCD Saudi Arabia 4 Packs 17/09/2014
AIRPORT DEVELOPMENT (PHASE1)
Public &
JUBAIL INDUSTRIAL COLLEGE C57 Buildings Institutional Al Naba Contracting Saudi Arabia 30 Packs 15/09/2014
Buildings
Chemicals &
AL HASSA SILOS Industrial OCRIM Saudi Arabia 5 Packs 13/08/2014
Process
RABIGH II INDEPNDENT WATER,STEAM Power Oil, Gas,
Utilities G S Contracting Saudi Arabia 50 Drums 22/07/2014
AND POWER PROJECT ( IWSPP) Coal
PACKAGE 4: SHAYABAH IGHC (INLET GAS
Industrial Oil & Gas SAMSUNG Engineering Saudi Arabia 200 Litre(s) 10/03/2014
HANDLING CAPACITY
KAPSARC Buildings Commerical SK Saudi Arabia 100 Pack 15/01/2014
2,500 Litre(s) 3/12/2013
YASREF-MC5 Industrial Oil & Gas ABV Rock Saudi Arabia 2,700 Litre(s) 19/08/2013
FERDAN TOWER Buildings Commerical Tarouk Saudi Arabia 10 Drums 11/07/2013
THUMAMA TUNNEL Transport Road Dar Al-Riyadh Saudi Arabia 8 Pails 11/07/2013
RABIGH II REFINING & PETROCHEMICAL Chemical &
Industrial GS Saudi Arabia 270 Litre(s) 9/07/2013
PROJECT Process
1,375 Litre(s) 2/07/2013
HARAMAIN HIGH SPEED RAILWAY STATION
Transport Rail Yapi Merkezi Saudi Arabia 3,190 Litre(s) 10/06/2013
-MADINAH
KNOWLEDGE ECONOMIC CITY VILLA –
Buildings Residential Al Dar Alarabia Co Saudi Arabia 5,900 Litre(s) 10/06/2013
MADINAH
SANG AL HASSA Buildings Residential Arabtec Saudi Arabia 5,000 Litre(s) 1/04/2013
1,250 Litre(s) 5/02/2013
PACKAGE 1: SHAYABAH INLET AND GAS
Industrial Oil & Gas SAMSUNG Engineering Saudi Arabia 2,900 Litre(s) 4/02/2013
TREATMENT FACILITY
Chemical &
SADARA- MFC Industrial Dealim Saudi Arabia 400 Litre(s) 4/02/2013
Process
WASIT GAS PLANT Industrial Oil & Gas SK Engineering Saudi Arabia 12,500 Litre(s) 4/02/2013
JSDP Utilities Water Nesma Saudi Arabia 2,500 Litre(s) 22/01/2013
HARAMAIN HIGH SPEED RAILWAY STATION
Transport Rail Yapi Merkezi Saudi Arabia 4,725 Litre(s) 27/11/2012
-MADNAH
HARAMAIN RAILWAY MADINH Transport Rail AL Rajhi - Al arrab JV Co Saudi Arabia 1,500 Litre(s) 27/11/2012
WATER STRATEGIC TANK (AZIZYA) Utilities Water Aziz Co Saudi Arabia 750 Litre(s) 27/11/2012
5,750 Litre(s) 26/11/2012
SHAYBAH NGL PROJECT Industrial Oil & Gas Samsung Saudi Arabia 4,000 Litre(s) 15/10/2012
YANBU II - POWER & WATER PROJECT Utilities Water SARCO Saudi Arabia 400 Litre(s) 13/10/2012
SHAYABAH NGL PROJECT Industrial Oil & Gas Samsung Saudi Arabia 8,125 Litre(s) 15/09/2012
GOSI TWIN TOWERS Buildings Commerical Nesma & Partners Co Saudi Arabia 400 Packs 9/07/2012
SADARA PETROCHEMICAL COMPLEX Industrial Oil & Gas Dealim Saudi Arabia 400 Litre(s) 6/06/2012
Power Oil, Gas,
RAS AL KHAIR POWER PLANT Utilities CCC Saudi Arabia 200 Litre(s) 24/04/2012
Coal
INDUSTRIAL WATER TREATMENT PLANT-II Utilities Water SETE ENERGY Saudi Arabia 750 Litre(s) 3/04/2012
MOHAMED AL-MOJIL
YERP - EPCS 6 Industrial Oil & Gas Saudi Arabia 40 Litre(s) 3/04/2012
GROUP
Sepco 3 Saudi Arabia 200 Litre(s) 12/02/2012
IBN RUSHD EXPANSION PROJECT Industrial Clean Industries CTCI Saudi Arabia 60 Litre(s) 9/01/2012
125 Litre(s) 4/09/2011
Power Oil, Gas,
RABIGH POWER PLANT Utilities Sepco 111 Saudi Arabia 200 Litre(s) 11/04/2011
Coal
ARAFAT-MINA(AL MASHAER) RAIL WAY Transport Rail CHINA RAIL WAY CO. Saudi Arabia 10,000 Litre(s) 31/01/2011
MANIFA Industrial Oil & Gas JGC Saudi Arabia 408 Litre(s) 25/01/2011
Chemical &
SUWAIDI GENERAL MAINTINANCE Industrial Sabic Saudi Arabia 200 Litre(s) 25/01/2011
Process
KING ABDULLAH FINANCIAL DISTRICT Buildings Residential SBG - PBAD Saudi Arabia 100 Can 28/12/2010
Public &
PRINCESS NOURA UNIV. FOR WOMEN Buildings Institutional CCC JV. ELSEIF Saudi Arabia 600 Can 28/12/2010
Buildings
Commerical SBG - PBAD Saudi Arabia 10 Cans 17/10/2010
El-Seif Saudi Arabia 90 Cans 17/10/2010
56,439 Litre(s) 9/10/2010
244 Can 5/09/2010
425 Can 5/09/2010
El-Seif Saudi Arabia 75 Cans 5/08/2010
1,080 Cans 5/08/2010
2,425 Litre(s) 8/07/2010
SABIC HOUSING PROJECT PHASE "2" Buildings Residential PROJECT BUILD CO. Saudi Arabia 250 Litre(s) 8/07/2010
Public &
KING SAUD UNIVERSITY - GIRLS Buildings Institutional SBG - PBAD Saudi Arabia 30 Cans 7/07/2010
Buildings
1,100 Cans 7/07/2010
Public &
KING ABDULLAH UNIVERSITY (KAUST) Buildings Institutional Saudi Binladen Group Saudi Arabia 1,250 Litre(s) 4/07/2010
Buildings
Abdul Ali Al Ajami Co. Saudi Arabia 8 Litre(s) 12/05/2010
1,200 Can 4/04/2010
Daelim S.A Saudi Arabia 120 pail 11/03/2010
JUBAIL COMMERCIAL PORT Transport Marine Al Saad general Cont Saudi Arabia 775 Litre(s) 10/03/2010
Public &
KFU - INFRA STRUCTURE PH 3,4 Buildings Institutional FEMCO Saudi Arabia 8 Pack 19/01/2010
Buildings
OYOUN BRIDGE Transport Road Ahmed Binali Co. Saudi Arabia 12 Pack 18/01/2010
60 Litre(s) 18/11/2009
Power Oil, Gas,
FARAS PWR PLANT Utilities Al Toukhi Saudi Arabia 200 Litre(s) 17/11/2009
Coal
HASA-RING ROAD PRJ. Transport Road Al Ajmi co ltd Saudi Arabia 20 Litre(s) 17/11/2009
Public &
Al Arrab (KFU-Admn
KFU - ADMN BLDG. Buildings Institutional Saudi Arabia 16 Litre(s) 17/11/2009
Bldg.)
Buildings
30 Pails 17/11/2009
Public &
KFU - GIRLS EDUCATIONAL COLLAGE - B32 Buildings Institutional Abdullah Al Khodari Saudi Arabia 12 Litre(s) 16/11/2009
Buildings
Public &
KING SAUD UNIVERSITY FOR HEALTH
Buildings Institutional Saudi Bin Laden ABCD Saudi Arabia 4 Litre(s) 16/11/2009
STUDIES
Buildings
1,040 Cans 16/11/2009
WATER AUTHORITY PROJECTS Utilities Water Civil Works Co. Saudi Arabia 4 Litre(s) 16/11/2009
790 Cans 6/10/2009
RAS TANURA DHT - ARAMCO Industrial Oil & Gas Samsung Saudi Arabia 11 Packs 16/09/2009
KING FAHD CAUSEWAY AUTHORITY Transport Road NA Saudi Arabia 4 Pack 15/09/2009
Power Oil, Gas, AL-MASHARIQ TRADING
SEC-EOA POWER PALNTS Utilities Saudi Arabia 2 Packs 15/09/2009
Coal & CONTRACTING CO.
Public &
KSU Buildings Institutional Saudi Bin Laden ABCD Saudi Arabia 4 Litre(s) 12/07/2009
Buildings
Public &
Al Arrab Contraction
KFU ADMIN BUILD & MASJID Buildings Institutional Saudi Arabia 16 Litre(s) 23/06/2009
Company
Buildings
King Fahd Causeway
Rail Saudi Arabia 4 Litre(s) 23/06/2009
Authority
ALGUAWIBIASH INTERACTION Transport Road Abdul Aali Al Najmi Saudi Arabia 4 Litre(s) 13/05/2009
KFDP Industrial Oil & Gas CCC Saudi Arabia 100 Pack 11/05/2009
40 Litre(s) 11/05/2009
12 Packs 11/05/2009
88 Pails 11/05/2009
30 Packs 12/04/2009
SAUDI KAYAN PETROCHEMICAL COMPLEX Industrial Oil & Gas FLUOR Saudi Arabia 200 Packs 12/04/2009
QURAYYAH COMBINED CYCLE POWER Power Oil, Gas,
Utilities Arabian Bemco Saudi Arabia 155 Bags 8/04/2009
PLANT Coal
KHAFJI FIELD DEVELOPMENT
Industrial Oil & Gas CCC Saudi Arabia 100 Packs 28/03/2009
PROJECT(KFDP)
KHURAIS CENTERAL PROCESSING
Industrial Oil & Gas Hyundai Engineering Saudi Arabia 200 Packs 28/03/2009
FACILITIES - GAS CONTRACT
KHURAIS WATER FACILITIES Industrial Oil & Gas Snamprogetti Saudi Arabia 200 Litre(s) 28/03/2009
Public &
KFU COLLEGE OF SCIENCE Buildings Institutional APTC Saudi Arabia 4 Litre(s) 21/02/2009
Buildings
Public &
KING SAUD MEDICAL UNIVERSITY Buildings Institutional Saudi Bin Laden Saudi Arabia 24 Litre(s) 21/02/2009
Buildings
NATIONAL GUARD HOUSING REPAIR
Buildings Residential Al Dahari Group Saudi Arabia 120 Litre(s) 21/02/2009
WORK
AL - FAWARES MALL Buildings Commerical Shubeily Est. Saudi Arabia 1 Units 11/02/2009
AL-MANEA DOCTORS ACCOMODATION Buildings Residential Nas Al Khaleej Saudi Arabia 2 Units 11/02/2009
VILLA REPAIR PROJECT Buildings Residential Samer Al Mahesh Saudi Arabia 5 Units 11/02/2009
10 Packs 10/02/2009
WIPS - SHEDGUM & UTHMINYA Industrial Oil & Gas MMG Saudi Arabia 30 Packs 10/02/2009
400 Liters 13/05/2008
BERRY ARAMCO Industrial Oil & Gas Gama Saudi Arabia 1,200 Litre(s) 11/05/2008
40 Cans 6/05/2008
60 Cans 6/05/2008
WAISA ABUGHNI Utilities Water CWC Saudi Arabia 2 Can 27/04/2008
HAWIYAH Industrial Oil & Gas Snamprogetti Saudi Arabia 100 Can 15/04/2008
JGC Saudi Arabia 250 Cans 15/04/2008
KHURSANIYA GAS PLANT Industrial Oil & Gas Snamprogetti Saudi Arabia 100 Pack 13/04/2008
KHURAIS PROJECT - KCC Industrial Oil & Gas Snamprogetti Saudi Arabia 4 Pack 9/04/2008
KHURAIS WATER INJECTION FACILITIES
Industrial Oil & Gas Snamprogetti Saudi Arabia 700 Pack 9/04/2008
AND UTILITIES
150 Pack 8/04/2008
55 Pack 8/04/2008
150 Cans 8/04/2008
Power Oil, Gas,
MARAFIQ-IWPP Utilities Hyundai Saudi Arabia 100 Units 5/04/2008
Coal
20 Can 31/03/2008
KHURAIS WATER INJECTION FACILITIES &
Industrial Oil & Gas Snamprogetti Saudi Arabia 30 Liters 26/03/2008
UTILITIES
SHAYBA CPF Industrial Oil & Gas Nesma Saudi Arabia 40 Can 25/03/2008
Techint / Bechtel Saudi Arabia 100 Can 24/03/2008
SHAYBA NGL/CPF Buildings Residential Haif Contracting Saudi Arabia 25 Can 24/03/2008
Snamprojetti Saudi Arabia 50 Can 23/03/2008
Technip / Bechtel /
Saudi Arabia 500 Can 23/03/2008
Snamporojetti
300 Can 23/03/2008
HAIWAYH GAS PLANT Industrial Oil & Gas JGC Saudi Arabia 50 Pack 22/03/2008
KHURAISE PROJECT Industrial Oil & Gas Snamprogetti Saudi Arabia 4 Litre(s) 15/03/2008
AL ANDALUSE MALL Buildings Commerical Mubark Al-Guthmi Saudi Arabia 150 4 litre tins 8/11/2007
CCC-KGP Saudi Arabia 20 Can 23/07/2007
120 Can 23/07/2007
Haif Contracting Saudi Arabia 40 Can 22/07/2007
AL-HUGAYYET TOWER Buildings Commerical ATCO Saudi Arabia 100 Can 21/07/2007
300 Can 18/07/2007
Saudi Techint Limited Saudi Arabia 50 Cans 18/07/2007
500 Can 18/07/2007
SHAYBA NGL Buildings Residential Haif Contracting Saudi Arabia 25 Can 18/07/2007
UTHMAINY OIL PLANT Industrial Oil & Gas Metal Services Saudi Arabia 15 Pack 17/01/2007
HAIWAH GAS PLANT Industrial Oil & Gas Snamprogetti/JGC/F.M.Q Saudi Arabia 100 pail 16/01/2007
Can 16/01/2007
IMPROVEMENT OF AL-JAMMARAT BRIDGE
Transport Road Saudi Binladen Group Saudi Arabia 1,200 Litre(s) 7/10/2006
AND SURROUNDING AREA
250 Cans 3/10/2006
HAWIYAH NATURAL GAS PLANT Industrial Oil & Gas Snamprogetti Saudi Arabia 100 Cans 2/10/2006
JGC Saudi Arabia 100 Cans 2/10/2006
WAISA ABU GHANI Utilities Water C.W.C. Saudi Arabia 2 pail 2/10/2006
100 Cans 25/09/2006
Technip/Bechtel Saudi Arabia 100 Packs 25/09/2006
Public &
Construction &
KING ABDULAZIZ MILITARY SCHOOL Buildings Institutional Saudi Arabia 170 4 Litre Pack 2/11/2004
Supervision
Buildings
26/10/2004
BERRI Industrial Oil & Gas Technip Saudi Arabia 1,000 Litre(s) 11/09/2004
BERRI QATIF FACILITIES Industrial Oil & Gas Technip Saudi Arabia 200 Litres 6/09/2004
800 Litre(s) 1/09/2004
1,800 Litre(s) 27/03/2004
Buildings Commerical Technip Saudi Arabia 800 Litre(s) 16/12/2003
(IAP) JEDDAH INTERNATIONAL AIRPORT
Transport Airports Hute-Sete Limited Saudi Arabia 1,000 Litre(s) 27/10/2003
NORTH TERMINAL
JEDDAH AIRPORT (IAP) Transport Airports Huta-Sete Limited Saudi Arabia 2,000 Litre(s) 27/10/2003
KAAIA - JEDDAH Transport Airports Safari Company Limited Saudi Arabia 45 Cans 27/10/2003
SHARBATLY BUILDING Buildings Commerical Isam Kabbani - CRES Saudi Arabia 2,800 Litre(s) 2/10/2000
constructive solutions

Approvals
Pöyry Switzerland Ltd.

SALINE WATER CONVERSION CORPORATION


RABIGH-JEDDAH/ MAKKAH AL MOKARRAMAH WATER TRANSMISSION SYSTEM
PROJECT no. 20212

Project Technical Specifications Compliance

Materials no :MA-C-039_B

Place of Application : Concrete surfaces that have airbubbles (bug-holes)


Location : Rabigh-Jeddah/Makkah Al-Mokarramah Water Transmission System Project
Manufacturer : Fosam Company Limited (FOSROC)
Address : P.O.Box 11081 Jeddah 21453
Supplier : Fosam Company Limited (FOSROC)
Address : P.O.Box 11081 Jeddah 21453

Compliance
S. No. Description Submittal Specifications Project Specifications Remarks
Status

"Volume IX -C07 Concrete and Reinforcement


Nitobond AR-Acrylic emulsion cement modifier and
Section 4.4.3, page 59 : Air bubbles (Bug-holes) shall
water based concrete bonding agent, a recommended
be Submitted for
1 Nitobond AR primer for cementitious repair system. fully compliance
filled with a ready mixed, resin modified sand-cement approval
mortar of same colour as the concrete."
BONG KYUNG CONSTRUCTION CO., LTD.
P.O. BOX 44371 Jeddah 21581 K.S.A. - TEL: 00%6-2-6945%1 1 FAX: 00966-2-69493
Contract Title : Construction of Residential BulIdings In HAIl AL-AZIZIAH 1
Contract No. : PIC F-8136
SUBMITTAL FORM
[ IShop drawings [ 1 I Material [ I Others Date: 22-Jan-17
( 1 I Approval [ I Verification ( I Information Contractor
TS-F8136-MAT-AR-022Rl
( I Record [ I Deviation ( I Others submittal #:
ATTENTION: ENGR. MANGOROBONG BAUL PIRlNO
EWRNo. :
For RCIMSC : Authorized Representative
( I First Submittal [ 1 I Re- Submittal Previous
60529
CSGLog #:

Contractotl§ C e \ l n "Havln~i:fiecked this submittal, we certifY that it conforms to the req


Cb.., ~Doc~hts in all respects, except otherwise indicated herein."
1l'1'1.-I ;' ,,.. ~ked by:
cciOn Co. \.:,U ' ngineer Signed by: JTl!OIeCIl\M

Date:

CE
Cost

(A) Work May proceed I Re-submittal not required. Incorporate comments and proceed.
I Re-submittal required. Incorporate comments. Don't proceed
I Submittal Incomplete. Complete & re-submit again.
I (0) DIsapproved I Submittal inconsistent with contract.
I Acceptable with no comments ATTACHMENTS:
....
I Accepta ble with minor comments .... I Engineering Review Comments Sheets.
~
I Unacceptable 1 Rejected ~WR List of Submitted Materials indicating the review status
I Other comments:; See below submitted materials.
I Contractor Drawing submittal sheet(s) indicating status of
submitted drawlng(s).
ts.

Date:
. L \

t\ 'f' lo'Qo

.. ................ '-., ...


......... ..".--a .. ,.....w..I ~ ....... .,.,.... II" ~wIda""~~ 1Ws 1IpfN. . . . . . . ..c 1M ~. _
~ ~
......... ., . . . . . . . c.-.a -.. _prb. .4. ....... ...,..... . . . . . . . . . ., . . c.................. -v _ _

ADOmONAL COMMENTS:

Project FIle No.:


EWR No.: 1 CSG Log: R<:&tg~. Authorized Represen e
Ref. Number Date
1; J~ ----<­
CC: RF 1 Chrono
NUMBER: Y02-03-00-06/03
DATE OF ISSUtOl/~1L-4_3_5_ _ _ _ _ _ _ _ _ _ _---l

EWR LIST OF SUBMITTED MATERIALS


(NOT APPLICABLE TO DRAWING)

CONTRACT No: PIC F-8136 EWR No. c- G1G7t


REFERENCE TO
REVIEW
ITEM No. DESCRIPTION CONTRACT
STATUS
DOCUMENT

A. Approval of Materials

Waterproofing System for Fire Water Tank and Pump Room

1. Brushbond(Cementltlous Material) Section 099726 A


Acrylic Polymer Modified Protective Coating. part 2.1A

2. Nltocote EP405 Section 099726


(Epoxy Paint Finish after Application of Cementitious Material)
Non Toxic Epoxy Resin Protective Coating.

3. Nitomortar TC2000 Section 099726


Crack sealers in aggressive environment. part 2.1C ..... if"

RC ~1 I Z-.e JWi \ ,1
REVIEWED DATE
The review and/or release for construction/Installation shall not be construed as
relieving Seller/Contractor of any obligation or responsibilities with respect to these
FOSAM COMPANY UMrrED (FOSRC
documents or the items to be furnished/installed/constructed by Seller/ Contractor
MANUFACTURER/SUPPUER OF WA pursuant thereto
CONCRETE REPAIR MATERIAlS The review status is given conditionally upon your P ~ O ~ I (drawing) (document)
P.O. Box 1043 (sample) being within the scope of the Contract and at h dditional cost and time to
Yanbu Kilo 4, Jeddah Road K.S.A. the Royal Commission

Tel.: +966 14 3224280

~ORK MAY PROCEED


Fax.: +96614 3912980
(No Comments)
o WORK MAY PROCEED - MINOR COMMENTS
Contact Person:
(Changes to Incorporated)

Engr. Motaz .rlza@fosroc.com


o WORK MAY PROCEED EXCEPT AS NOTED

Mobile: +966 55 304 7853


(Resubmttal Required)

Email: Motaz.Rawagah@Fosroc.col
o DISAPPROVED - WORK MAY NOT PROCEED
(Resubmltal Required)

CSG REVIEW STATUS k CSG LOG No .G 1G74


REViEW STATUS
J
No. Y02 -03-00-06/0 5 DATE OF ISSUE 01/06/1435
. 1,

A- WORK MAY PROCEED - NO (


B- WORK MAY PROCEED - MINvT'n ... ,_mnvH;''' I.r
C- WORK MAY PROCEED EXCEPT AS NOTED (Resubmittai Required)
D- DISAPPROVED - WORK MAY NOT PROCEED (Resubmittal Required)

CONTRACTOR: BONGKYUNG CONSTRUCTION COMPANY UMrrED


SUMITIAL NO.: TS-F8136-MAT-AR-022Rl
DATE: 22-Jan-17
constructive solutions

Case Histories
CASE STUDY

Constructive solutions
Hail STP Expansion II
Hail - Saudi Arabia

CLIENT
Ministry of Water
CONTRACTOR vv
Civil Works Company
SECTOR
Utilities
DATE
2011

PRODUCTS
PRODUCTS
 Supercast Waterstop
 Nitoflor
SupercastSLSW30
3000
 Nitoprime
Reebol 25
 Concure WB309
THE PROJECT  Conbextra GP
 Conbextra TS
Hail STP expansion II established to cover the continual growing of the urban and  Renderoc TG
industrial activities in the area, and as a part of the comprehensive system of  Nitobond AR
treatment and disposing the sewage and storm water. The STP was built based  Renderoc LA
on the latest technologies in the field and under direct supervision from the  Nitobond EP
directorate of water in Hail province, which has many successful experiences  Nitomortar ELS
with Fosroc’s products in many similar projects like in Al Hemyma strategic wells  Nitoseal 220
and water tanks and the first STP in Hail as well.  Nitocote EPS
 Thioflex 600
THE SOLUTION
Fosroc has submitted its integrated systems for the sewage treatment plants
from the waterproofing solutions to the protective coatings and hereunder some
of the solutions:
 The pure PVC waterstops and swellable bars (Supercast Waterstops and
SW30) as part of the waterproofing.
 Reebol and Concure WB309 in the surfaces treatment.
 Conbextra GP and TS in grouting.
 Renderoc TG, LA and Nitomortar TC2000 for concrete repairs.
6000 LM of Waterstops and swellable
 Nitomortar ELS as an epoxy lining mortar. bars
 Nitoseal 220 as a special sealant for the sewage treatment plants.
 Nitocote EPS to protect the reinforced concrete structures.
 Thioflex 600 for the odor control system.

THE BENEFITS
The complete proven quality systems have placed Fosroc’s in a leading position in
this project, where the integrated service has demonstrated to the client,
consultant and the contractor the extent of Fosroc’s commitment in the solution
provided.
96,000 m2 the total area for the epoxy
polysulfide
T: +966
T: +966 12 6080999
12 6080999 F: +966
F: +966 12 6380693 E: enquiry@fosroc.com
12 6380693 E: enquiry@fosroc.com
Address:
Address: Jeddah
Jeddah Industrial
Industrial Area Area
PhasePhase 4, Road
4, Road 414, Street
414, Street 407, Jeddah
407, Jeddah – Saudi
– Saudi Arabia
Arabia www.fosroc.com
CASE STUDY

Lanco Budhil Hydro


Power Private Limited

Bharmour,
Himachal Pradesh

“Excellent Work within


schedule”
Brig. Shivinder Singh Sirohi

General Manager

PRODUCTS
 Renderoc RG
 Renderoc S2
 Cebex 100
 Renderoc Plug
 Nitobond AR

Repair in Head Race Tunnel CLIENT


Lanco Budhil Hydro Power
Private Limited
THE PROJECT
SECTOR
Lanco Budhil Hydro Power The Head race Concrete Tunnel of Hydro Power Project
the project suffered damages on
Project the base and the wall due to COUNTRY
movement of heavy boulders along India
Capacity : 70 (2x35) MW with the water. The Customer has
: Chamba district of taken the Shut down for the project DATE
Location
Himachal Pradesh, India to enable repair of Project. The 23.04.2014
Status : Commissioned on 30th Time period available for the work
May 2012
was for 30 days from the date of
Shut down and the actual working
Budhil was registered as a Clean time available for the work was 20
Development Mechanism (CDM) project
with United Nations Framework days only. We had serious issue
Convention on Climate Change (UNFCCC) with making the Material available
on 2 June 2009.
at site which was approx. 800 KM
from site. The second issue was due
to heavy damage of the Concrete
there was heavy inflow of water
and before any repair work can be
Plant Village Thalla, P.O. Ghared,
Office Tehsil Bharmour, taken up the water inflow was to be
District Chamba 176 315 stopped. We also had the challenge
Himachal Pradesh, India
Phone No. + 91-1895-225337
of shifting of Material as we had to The diversion of Water to enable
Email shift the material manually for 3.5 the repair activity.
info.power@lancogroup.com KM.
THE SOLUTION
Grouting of cracks in the concrete

Grout with Cement admixed with Non-Shrink additive Cebex 100

Procedure

Drilling holes in the concrete using pneumatic drill in a grid pattern at


required spacing as per site conditions but in no case exceeding 1m center
to center at 45°.
Packers were fixed in the holes drilled using a single component rapid
setting compound Renderoc Plug.
Eroded Concrete Surface
before repair  Grouting operation is carried out through the next packers till the
entire area is covered.
 The grouting holes shall be finished by removing the packers and
finishing flush with the surface.

Repair of eroded Concrete Surface.

Repair higher than 15 mm the repair was carried out by providing and
applying the General purpose, non-shrink, cementitious micro-concrete
Renderoc RG and In area where the repair thickness was less than 15 mm
Renderoc S2 was used.

Surface after repair.


THE BENEFITS
The time period to execute the work was very less, only 20 days was available to
complete the Work. Fosroc with High early strength repair products Renderoc RG
and Renderoc S2 was able to provide solution for the Problem. The experienced
and trained applicator M/s. Suri Construction was able to successfully complete
the work as required by the Owner.

FOR MORE INFORMATION


Fosroc Chemicals India Pvt. Ltd.
D-166, Sector 10,
Noida – 201301

Phone

+91-120 4270620/21/23

www.fosroc.com
Case History constructive solutions

 Project :Princes Noura University for Women

 Client : Ministry of High Education

 Consultant : Dar AL Handasa

 Contractor : AXAL Arabia

 Location : Exit 8- Near of airport gate

 Products : Nitomortar PE
Nitotile XS
Nitobond AR

 Execution : December 2008


Date

IMAGE
image of structure after completion
Background:

The project calls for Princes Nora University for


Women location in Riyadh.
Saudi Bin laden Group (ABCD) company main
contractor –Division was awarded the subcontractor
AXAL Saudi Arabia EST. for construction to make 12
buildings there ,in December 2008 , with actual value
33 billion . Construction is in a progress and expected to
be completed in January 2011.

Constructive Solutions

Fosroc introduced constructive solutions for the marbles


were been in walls and stairs
The main specifications was to provide suitable
materials cementitious based to adhere with high
performance . with a high bond strength to concrete
IMAGE through used acrylic bonding material at a thickness of
image of structure after completion 10 mm, our choice went to Nitotile XS, this is Polymer-
modified, one component, high performance,
waterproof tile adhesive
and Nitobond AR Acrylic emulsion cement modifier
and concrete bonding agent
The main objective was to produce a strong material to
adhere with concrete without any de-bonding
* the contractor have to different choices for the
adhesion issued to achieve the main purpose
FOSROC PRODUCT APPLICATION

Fosam Co. Ltd. Tel: +966 2 60 80 999 Fax: +966 2 66 75 891 E-mail: Fosam@Fosroc.com
(Saudi Fosroc)
Regional Offices
Head Office Jeddah Sales Office Tel: (02) 6080999 Fax: (02) 635 3330 Yanbu Tel: (04) 322 4280 Fax: (04) 391 2980
Post Box 11081 Jeddah Showroom Tel: (02) 665 0787 Fax: (02) 667 4884 Makkah Tel: (02) 542 0869 Fax: (02) 542 0869
Riyadh Tel: (01) 482 9303 Fax: (01) 482 9303 Medinah Tel: (04) 845 1767 Fax: (04) 846 3195
Jeddah – 21453 Dammam Tel: (03) 847 2929 Fax: (03) 847 1582 Jubail Tel: (03) 362 3904 Fax: (03) 362 3875
www.Fosroc.com Saudi Arabia Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469
FOSROC PRODUCT APPLICATION

Fosam Co. Ltd. Tel: +966 2 60 80 999 Fax: +966 2 66 75 891 E-mail: Fosam@Fosroc.com
(Saudi Fosroc)
Regional Offices
Head Office Jeddah Sales Office Tel: (02) 6080999 Fax: (02) 635 3330 Yanbu Tel: (04) 322 4280 Fax: (04) 391 2980
Post Box 11081 Jeddah Showroom Tel: (02) 665 0787 Fax: (02) 667 4884 Makkah Tel: (02) 542 0869 Fax: (02) 542 0869
Riyadh Tel: (01) 482 9303 Fax: (01) 482 9303 Medinah Tel: (04) 845 1767 Fax: (04) 846 3195
Jeddah – 21453 Dammam Tel: (03) 847 2929 Fax: (03) 847 1582 Jubail Tel: (03) 362 3904 Fax: (03) 362 3875
www.Fosroc.com Saudi Arabia Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469
FOSROC PRODUCT APPLICATION

Fosam Co. Ltd. Tel: +966 2 60 80 999 Fax: +966 2 66 75 891 E-mail: Fosam@Fosroc.com
(Saudi Fosroc)
Regional Offices
Head Office Jeddah Sales Office Tel: (02) 6080999 Fax: (02) 635 3330 Yanbu Tel: (04) 322 4280 Fax: (04) 391 2980
Post Box 11081 Jeddah Showroom Tel: (02) 665 0787 Fax: (02) 667 4884 Makkah Tel: (02) 542 0869 Fax: (02) 542 0869
Riyadh Tel: (01) 482 9303 Fax: (01) 482 9303 Medinah Tel: (04) 845 1767 Fax: (04) 846 3195
Jeddah – 21453 Dammam Tel: (03) 847 2929 Fax: (03) 847 1582 Jubail Tel: (03) 362 3904 Fax: (03) 362 3875
www.Fosroc.com Saudi Arabia Khamis Mushayt Tel: (07) 250 0469 Fax: (07) 250 0469

You might also like