CEP Assignment Irrigation Engineering
CEP Assignment Irrigation Engineering
CEP Assignment Irrigation Engineering
Objective: The objective of this Problem is to familiarize the students with the Cross-Drainage
works (the disposal of canal water intercepting the drainage).
Project Details: In this project students are required to Design a suitable Cross-Drainage work
as per the given data. Assume any missing data.
Given Data:
For Canal
Full Supply Discharge (FSQ) = 354 + R/5 m3/s
Bed Width = 24 m
Full Supply Level (FSL) = 207.60 + R/8 m
Canal Bed Level (CBL) = 201.4 + R/10 m
Side Slopes = 1/2H:1V
For Natural Drainage
High Flood Discharge (HFQ) = 21189 + R/8 ft3/s
Drainage Bed Level = 203.6 + R/10 m
High Flood Level (HFL) = 206.3 + R/5 m
Constraints: Complex Engineering Problem must be completed by following the given below
constraints:
● Project must be completed like a Report comprising of Chapters having Introduction,
Literature Review, Methodology/Procedure*, Results*, Conclusions and Lastly
References.
● Report must be properly Formatted (Justified using Times New Roman having size 14 for
Headings and 12 for Text)
● Project must be done in groups using group leader’s roll number.
● Calculations on excel will be encouraged.
Project Deliverables:
a. Complete Report
b. Design Calculations
c. Viva and/or Presentations.
* Must include:
Design of Canal Waterway
Design of Drainage waterway
Design of Bed levels along the Drainage trough
Design of Transitions
Design of Trough
Head loss through syphon barrels
Uplift pressure on Roof barrels
Design of Roof barrels
Uplift on Bottom floor of syphon barrels
Design of Cut-offs and Protection works for canal floor.
Marks Distribution with Linkage to CLOs: *
Sr.
Criteria Marks CLO PLO
No.
1 Problem Identification. 1 4 3
Report writing and Literature
2 1 4 3
Review.
3 Design Calculations. 1 4 3
* Assessment will be carried out through the Complex Engineering Problem’s Rubrics.
Abovementioned criteria are picked from the Rubrics.