BILL OF MATERIALS

PROJECT TITLE Proposed Single Storey Commercial Building


PROJECT CATEGORY Building
LOCATION Barangay Poblacion, Kabaca
TOTAL PROJECT COST PHP 222,719.35
Individual Item of Work
ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
4.00 Concrete Works 6.00 posts 1,875.83
A. FOOTING (1MX1M @ 20POSTS)
1.00 Materials
Portland Cement 1 10.00 bags 210.00
12mm dia grade 40 12.00 pcs 655.00
GI Tie Wire No. 16 2.00 kgs 85.00
Washed Sand 0.50 cu.m. 650.00
Washed Gravel 1.00 cu.m. 800.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
5.00 Concrete Works 6.00 columns 1,829.38
B. COLUMNS (0.30MX0.30M @ 20 columns) - ground floor
1.00 Materials
Portland Cement 10.00 bags 210.00
12mm dia grade 40 18.00 pcs 200.00
10mm dia grade 40 25.00 pcs 150.00
GI Tie Wire No. 16 3.00 kgs 85.00
Washed Sand 0.57 cu.m. 650.00
Washed Gravel 1.13 cu.m. 800.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
6.00 Concrete Works 7.00 beams 1,938.86
C. BEAMS (0.25MX0.30M)
1.00 Materials
Portland Cement 15.00 bags 210.00
12mm dia grade 40 20.00 pcs 200.00
10mm dia grade 41 28.00 pcs 150.00
GI Tie Wire No. 16 4.00 kgs 85.00
Washed Sand 0.84 cu.m. 650.00
Washed Gravel 1.67 cu.m. 800.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
6.00 Concrete Works 5.26 cu.m. 3,192.49
C. SLABS 0.125 THK(5.4MX5.9M) - Ground floor
1.00 Materials
Portland Cement 32.00 bags 200.00
10mm dia grade 41 27.00 pcs 150.00
GI Tie Wire No. 16 5.00 kgs 85.00
Washed Sand 2.63 cu.m. 650.00
Washed Gravel 5.26 cu.m. 800.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Concrete Works 30.00 m 142.57
D. ZOCALLO WORKS
1.00 Materials
Portland Cement 5.00 bags 200.00
10mm dia grade 41 15.00 lengths 150.00
GI Tie Wire No. 16 3.00 kgs 85.00
Washed Sand 0.38 cu.m. 650.00
Washed Gravel 0.75 cu.m. 700.00
Sub-total Cost

ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST


8.00 Concrete Works 90.00 sq.m 349.82
E. Walls
1.00 Materials
# of CHB(0.2x0.4x0.10THK) 900.00 pcs 12.00
Portland Cement 50.00 bags 240.00
10mm dia grade 41 35.00 pcs 150.00
GI Tie Wire No. 16 2.16 kgs 85.00
Washed Sand 5.00 cu.m. 650.00
Washed Gravel - cu.m. 800.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Tile Works 29.64 sq.m 592.41
A. TILE WORKS
1.00 Materials
(60cmX60cm)Tiles 83.00 pcs 198.00
Tile Grout 15.00 bags 75.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Form Works 882.90 bd.ft 27.30
A. Column Scaffoldings(2x3x12)
1.00 Materials
2x3x12 70.00 pcs 180.00
2x2x12 115.00 pcs 100.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Form Works 236.60 bd.ft 25.36
B. BEAM Scaffoldings
1.00 Materials
2x2x12 60.00 pcs 100.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Form Works 34.00 sq.m 145.59
C. PLYWOOD FORMS
1.00 Materials
MARINE PLYWOOD(0.5THK) 9.00 pcs 550.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Pipeline Works 18.00 m 183.33
A. WATER WASTELINE PIPELINE
1.00 Materials
4in dia. PVC Pipe 1 6.00 pcs 550.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Pipeline Works 20.00 m 13.75
B. WATERLINE PIPELINE(ground floor, 2nd floor)
1.00 Materials
1/2in dia. PVC Pipe 1 5.00 pcs 55.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Fixtures 20.00 m 300.00
A. WATERCLOSET, LAVATORY(ground floor, 2nd floor)
1.00 Materials
WATERCLOSET 1 1.00 pcs 3,200.00
LAVATORY 1.00 pcs 2,800.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Roofing Works 52.00 sq.m 594.35
A. FRAMES, ROOF
1.00 Materials
Angle Bars (1/4"x3":x3"x6m long) 6.00 pcs 1,230.00
Cee Purlins (2"x8"xx1.2mmx6m long 12.00 pcs 786.00
Rib Type Roofing (1.1mx8.7m) 6.00 pcs 2,349.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Paint 34.00 sq.m 909.00
A. Exterior Wall
1.00 Materials
6.00 pcs 1,230.00
12.00 pcs 786.00
6.00 pcs 2,349.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Electrical works 31.00 sq.m 50.87
A. Roughing-ins
1.00 Materials
Electrical conduit uPVC, 15mm dia. 14.00 pcs 58.00
RSC 20mm dia. 1.00 pcs 400.00
Entrance Cap 20mm dia. 1.00 pcs 25.00
Junction Box, "4x4" GI 4.00 pcs 20.00
Utility box, 2"x4" GI 3.00 pcs 20.00
Grounding Rod, 2.4m x 16mm dia. 1.00 pcs 200.00
Sub-total Cost

Individual Item of Work


ITEM No. DESCRIPTION QUANTITY UNIT UNIT COST
8.00 Electrical works 31.00 sq.m 283.55
B. Wires and fixtures
1.00 Materials
3.5mm2 THW wire, Stranded 180.00 m 25.00
Duplex C.O. with plate 2.00 pcs 110.00
2 gang switch with plate 1.00 pcs 150.00
Single Switch with plate 1.00 pcs 70.00
FL 1x40W inndustrial type 5.00 set 560.00
Safety switch 30A 2P 1.00 set 630.00
ELS 1x12W 2U type 1.00 set 420.00
Sub-total Cost
TOTAL COST
TOTAL COST
11,255.00

2,100.00
7,860.00
170.00
325.00
800.00
11,255.00

TOTAL COST
10,976.25

2,100.00
3,600.00
3,750.00
255.00
367.25
904.00
10,976.25

TOTAL COST
13,572.00

3,150.00
4,000.00
4,200.00
340.00
546.00
1,336.00
13,572.00

TOTAL COST
16,792.50

6,400.00
4,050.00
425.00
1,709.50
4,208.00
16,792.50

TOTAL COST
4,277.00

1,000.00
2,250.00
255.00
247.00
525.00
4,277.00

TOTAL COST
31,483.60

10,800.00
12,000.00
5,250.00
183.60
3,250.00
0.00
31,483.60

TOTAL COST
17,559.00
16,434.00
1,125.00
17,559.00

TOTAL COST
24,100.00

12,600.00
11,500.00
24,100.00

TOTAL COST
6,000.00

6,000.00
6,000.00

TOTAL COST
4,950.00

4,950.00
4,950.00

TOTAL COST
3,300.00

3,300.00
3,300.00

TOTAL COST
275.00

275.00
275.00

TOTAL COST
6,000.00

3,200.00
2,800.00
6,000.00

TOTAL COST
30,906.00

7,380.00
9,432.00
14,094.00
30,906.00

TOTAL COST
30,906.00

7,380.00
9,432.00
14,094.00
30,906.00

TOTAL COST
1,577.00

812.00
400.00
25.00
80.00
60.00
200.00
1,577.00

TOTAL COST
8,790.00

4,500.00
220.00
150.00
70.00
2,800.00
630.00
420.00
8,790.00
222,719.35