Air System Sizing Summary for ITR 87-AHU

Project Name: ITB Exhibit C 04/10/2021


Prepared by: REDCO 02:53PM

Air System Information


Air System Name ITR 87-AHU Number of zones 5
Equipment Class SPLT AHU Floor Area 793.6 m²
Air System Type VAV Location Doha, Qatar

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Peak zone sensible load
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load 203.9 kW Load occurs at Jun 2100
Sensible coil load 188.3 kW OA DB / WB 39.2 / 28.7 °C
Coil L/s at Jun 2100 12710 L/s Entering DB / WB 23.5 / 15.8 °C
Max block L/s at Jul 2100 13886 L/s Leaving DB / WB 11.2 / 10.5 °C
Sum of peak zone L/s 13892 L/s Coil ADP 9.9 °C
Sensible heat ratio 0.924 Bypass Factor 0.100
L/(s kW) 62.3 Resulting RH 47 %
m²/kW 3.9 Design supply temp. 13.0 °C
W/m² 257.0 Zone T-stat Check 5 of 5 OK
Water flow @ 5.6 K rise N/A Max zone temperature deviation 0.0 K

Supply Fan Sizing Data


Actual max L/s at Jul 2100 13886 L/s Fan motor BHP 16.21 BHP
Standard L/s 13870 L/s Fan motor kW 12.86 kW
Actual max L/(s·m²) 17.50 L/(s·m²) Fan static 500 Pa

Return Fan Sizing Data


Actual max L/s at Jul 2100 13886 L/s Fan motor BHP 16.21 BHP
Standard L/s 13870 L/s Fan motor kW 12.86 kW
Actual max L/(s·m²) 17.50 L/(s·m²) Fan static 500 Pa

Outdoor Ventilation Air Data


Design airflow L/s 0 L/s L/s/person 0.00 L/s/person
L/(s·m²) 0.00 L/(s·m²)

Hourly Analysis Program 5.11 Page 1 of 10


Zone Sizing Summary for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

Air System Information


Air System Name ITR 87-AHU Number of zones 5
Equipment Class SPLT AHU Floor Area 793.6 m²
Air System Type VAV Location Doha, Qatar

Sizing Calculation Information


Calculation Months Jan to Dec Zone L/s Sizing Peak zone sensible load
Sizing Data Calculated Space L/s Sizing Individual peak space loads

Zone Terminal Sizing Data

Reheat Zone Zone


Design Minimum Reheat Coil Htg Unit Htg Unit Mixing
Supply Supply Coil Water Coil Water Box Fan
Airflow Airflow Zone Load L/s Load L/s Airflow
Zone Name (L/s) (L/s) L/(s·m²) (kW) @ 11.1 K (kW) @ 11.1 K (L/s)
Zone 1 1519 15 11.59 0.0 - 0.0 - 0
Zone 2 7921 79 21.70 0.0 - 0.0 - 0
Zone 3 2878 29 16.73 0.0 - 0.0 - 0
Zone 4 1476 15 12.20 0.0 - 0.0 - 0
Zone 5 99 1 21.42 0.0 - 0.0 - 0

Zone Peak Sensible Loads

Zone Zone Zone


Cooling Time of Heating Floor
Sensible Peak Sensible Load Area
Zone Name (kW) Cooling Load (kW) (m²)
Zone 1 16.5 Jul 2100 1.1 131.0
Zone 2 86.0 Jul 2100 3.4 365.0
Zone 3 31.2 Jul 2100 1.7 172.0
Zone 4 16.0 Jul 2100 1.5 121.0
Zone 5 1.1 Aug 1600 0.2 4.6

Space Loads and Airflows

Time of
Cooling Peak Air Heating Floor
Zone Name / Sensible Sensible Flow Load Area Space
Space Name Mult. (kW) Load (L/s) (kW) (m²) L/(s·m²)
Zone 1
ITR 87-101 Instr.Tech Rm 1 16.5 Jul 2100 1519 1.1 131.0 11.59
Zone 2
ITR 87-102 Rack Room 1 86.0 Jul 2100 7921 3.4 365.0 21.70
Zone 3
ITR 87-103 Battery Room 1 31.2 Jul 2100 2878 1.7 172.0 16.73
Zone 4
ITR 87-104 UPS Room 1 16.0 Jul 2100 1476 1.5 121.0 12.20
Zone 5
ITR 87-112 Air Lock 1 1 0.3 Jul 1700 28 0.1 2.3 12.37
ITR 87-113 Air Lock 2 1 0.8 Aug 1600 70 0.1 2.3 30.63

Hourly Analysis Program 5.11 Page 2 of 10


Air System Design Load Summary for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jun 2100 HEATING DATA AT DES HTG
COOLING OA DB / WB 39.2 °C / 28.7 °C HEATING OA DB / WB 10.6 °C / 6.0 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 490 m² 8643 - 490 m² 2927 -
Roof Transmission 794 m² 22293 - 794 m² 3645 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 19 m² 575 - 19 m² 342 -
Floor Transmission 743 m² 0 - 743 m² 998 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 9 m² 381 - 9 m² 0 -
Overhead Lighting 11904 W 11903 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 84550 W 84546 - 0 0 -
People 5 359 301 0 0 0
Infiltration - 8158 14547 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 5% 13686 742 0% 0 0
>> Total Zone Loads - 150544 15590 - 7913 0
Zone Conditioning - 149515 15590 - -447 0
Plenum Wall Load 0% 0 - 0 0 -
Plenum Roof Load 0% 0 - 0 0 -
Plenum Lighting Load 0% 0 - 0 0 -
Return Fan Load 12710 L/s 11878 - 139 L/s -2777 -
Ventilation Load 0 L/s 0 0 0 L/s 0 0
Supply Fan Load 12710 L/s 11878 - 139 L/s -2777 -
Space Fan Coil Fans - 0 - - 0 -
Duct Heat Gain / Loss 10% 15054 - 10% 791 -
>> Total System Loads - 188325 15590 - -5210 0
Central Cooling Coil - 188325 15591 - -5210 0
>> Total Conditioning - 188325 15591 - -5210 0
Key: Positive values are clg loads Positive values are htg loads
Negative values are htg loads Negative values are clg loads

Hourly Analysis Program 5.11 Page 3 of 10


Zone Design Load Summary for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

Zone 1 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 2100 HEATING DATA AT DES HTG
COOLING OA DB / WB 39.7 °C / 28.7 °C HEATING OA DB / WB 10.6 °C / 6.0 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 56 m² 1147 - 56 m² 335 -
Roof Transmission 131 m² 3643 - 131 m² 602 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 0 m² 0 - 0 m² 0 -
Floor Transmission 131 m² 0 - 131 m² 134 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 1965 W 1965 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 6550 W 6550 - 0 0 -
People 4 287 240 0 0 0
Infiltration - 1390 2358 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 5% 1498 130 0% 0 0
>> Total Zone Loads - 16481 2728 - 1070 0

Zone 2 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 2100 HEATING DATA AT DES HTG
COOLING OA DB / WB 39.7 °C / 28.7 °C HEATING OA DB / WB 10.6 °C / 6.0 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 198 m² 3636 - 198 m² 1181 -
Roof Transmission 365 m² 10151 - 365 m² 1677 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 6 m² 195 - 6 m² 113 -
Floor Transmission 365 m² 0 - 365 m² 444 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 5475 W 5475 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 54750 W 54748 - 0 0 -
People 1 72 60 0 0 0
Infiltration - 3873 6569 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 5% 7815 331 0% 0 0
>> Total Zone Loads - 85965 6961 - 3414 0

Hourly Analysis Program 5.11 Page 4 of 10


Zone Design Load Summary for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

Zone 3 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 2100 HEATING DATA AT DES HTG
COOLING OA DB / WB 39.7 °C / 28.7 °C HEATING OA DB / WB 10.6 °C / 6.0 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 110 m² 1867 - 110 m² 654 -
Roof Transmission 172 m² 4783 - 172 m² 790 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 5 m² 140 - 5 m² 81 -
Floor Transmission 121 m² 0 - 121 m² 200 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 2580 W 2580 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 17200 W 17199 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 1825 3096 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 5% 2839 155 0% 0 0
>> Total Zone Loads - 31234 3251 - 1725 0

Zone 4 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Jul 2100 HEATING DATA AT DES HTG
COOLING OA DB / WB 39.7 °C / 28.7 °C HEATING OA DB / WB 10.6 °C / 6.0 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 117 m² 1905 - 117 m² 696 -
Roof Transmission 121 m² 3365 - 121 m² 556 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 5 m² 140 - 5 m² 81 -
Floor Transmission 121 m² 0 - 121 m² 208 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 0 m² 0 - 0 m² 0 -
Overhead Lighting 1815 W 1815 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 6050 W 6050 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 1284 2178 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 5% 1456 109 0% 0 0
>> Total Zone Loads - 16014 2287 - 1541 0

Hourly Analysis Program 5.11 Page 5 of 10


Zone Design Load Summary for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

Zone 5 DESIGN COOLING DESIGN HEATING


COOLING DATA AT Aug 1600 HEATING DATA AT DES HTG
COOLING OA DB / WB 45.7 °C / 29.9 °C HEATING OA DB / WB 10.6 °C / 6.0 °C
OCCUPIED T-STAT 22.0 °C OCCUPIED T-STAT 21.1 °C
Sensible Latent Sensible Latent
ZONE LOADS Details (W) (W) Details (W) (W)
Window & Skylight Solar Loads 0 m² 0 - 0 m² - -
Wall Transmission 10 m² 167 - 10 m² 61 -
Roof Transmission 5 m² 94 - 5 m² 21 -
Window Transmission 0 m² 0 - 0 m² 0 -
Skylight Transmission 0 m² 0 - 0 m² 0 -
Door Loads 4 m² 142 - 4 m² 68 -
Floor Transmission 5 m² 0 - 5 m² 13 -
Partitions 0 m² 0 - 0 m² 0 -
Ceiling 9 m² 435 - 9 m² 0 -
Overhead Lighting 69 W 69 - 0 0 -
Task Lighting 0W 0 - 0 0 -
Electric Equipment 0W 0 - 0 0 -
People 0 0 0 0 0 0
Infiltration - 65 83 - 0 0
Miscellaneous - 0 0 - 0 0
Safety Factor 10% / 5% 97 4 0% 0 0
>> Total Zone Loads - 1069 87 - 163 0

Hourly Analysis Program 5.11 Page 6 of 10


System Psychrometrics for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

June DESIGN COOLING DAY, 2100

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 39.2 0.02059 0 400 0 0
Vent - Return Mixing Outlet 23.5 0.00803 12710 790 - -
Central Cooling Coil Outlet 11.2 0.00762 12710 790 188325 15591
Supply Fan Outlet 12.0 0.00762 12710 790 11878 -
Cold Supply Duct Outlet 13.0 0.00762 12710 790 - -
Zone Air - 22.8 0.00803 12710 790 149515 15590
Return Plenum Outlet 22.8 0.00803 12710 790 0 -
Return Fan Outlet 23.5 0.00803 12710 790 11878 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.206 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2944.1 W/(L/s)
Site Altitude = 9.8 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 16457 Cooling 16289 22.8 1385 798 0 0
Zone 2 85928 Cooling 85486 22.8 7266 791 0 0
Zone 3 31182 Cooling 30971 22.8 2633 787 0 0
Zone 4 15991 Cooling 15813 22.8 1345 783 0 0
Zone 5 986 Cooling 956 22.7 82 789 0 0

Hourly Analysis Program 5.11 Page 7 of 10


System Psychrometrics for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

WINTER DESIGN HEATING

TABLE 1: SYSTEM DATA

Dry-Bulb Specific Sensible Latent


Temp Humidity Airflow CO2 Level Heat Heat
Component Location (°C) (kg/kg) (L/s) (ppm) (W) (W)
Ventilation Air Inlet 10.6 0.00393 0 400 0 0
Vent - Return Mixing Outlet 32.2 0.00299 139 800 - -
Central Cooling Coil Outlet 1.1 0.00299 139 800 5210 0
Supply Fan Outlet 17.7 0.00299 139 800 2777 -
Cold Supply Duct Outlet 13.0 0.00299 139 800 - -
Zone Air - 15.7 0.00299 139 800 447 0
Return Plenum Outlet 15.7 0.00299 139 800 0 -
Return Fan Outlet 32.2 0.00299 139 800 2777 -

Air Density x Heat Capacity x Conversion Factor: At sea level = 1.207; At site altitude = 1.206 W/(L/s-K)
Air Density x Heat of Vaporization x Conversion Factor: At sea level = 2947.6; At site altitude = 2944.1 W/(L/s)
Site Altitude = 9.8 m

TABLE 2: ZONE DATA

Zone Terminal Zone


Sensible Zone Zone Zone CO2 Heating Heating
Load T-stat Cond Temp Airflow Level Coil Unit
Zone Name (W) Mode (W) (°C) (L/s) (ppm) (W) (W)
Zone 1 -1070 Deadband 61 16.3 15 800 0 0
Zone 2 -3414 Deadband 256 15.7 79 800 0 0
Zone 3 -1725 Deadband 91 15.6 29 800 0 0
Zone 4 -1541 Deadband 34 14.9 15 800 0 0
Zone 5 -163 Deadband 5 17.3 1 800 0 0

Hourly Analysis Program 5.11 Page 8 of 10


System Psychrometrics for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

Location: Doha, Qatar


Altitude: 9.8 m.
Data for: June DESIGN COOLING DAY, 2100

1. Central Cooling Coil Outlet


2. Supply Fan Outlet
3. Duct Heat 0.024
4. Room Air
5. Return Fan Outlet
0.022
0.020

Specific Humidity ( kg/kg )


0.018
0.016
0.014
0.012
0.010
1 2 3 4 5
0.008
0.006
0.004
0.002
0.000
0 5 10 15 20 25 30 35
Temperature ( °C )

Hourly Analysis Program 5.11 Page 9 of 10


System Psychrometrics for ITR 87-AHU
Project Name: ITB Exhibit C 04/10/2021
Prepared by: REDCO 02:53PM

Location: Doha, Qatar


Altitude: 9.8 m.
Data for: WINTER DESIGN HEATING
0.020
1. Central Cooling Coil Outlet
2. Supply Fan Outlet
3. Duct Heat
4. Duct Heat 0.018
5. Room Air
6. Return Fan Outlet
0.016

Specific Humidity ( kg/kg )


0.014

0.012

0.010

0.008

0.006

1 3 5 2 6 0.004

0.002

0.000
0 5 10 15 20 25 30 35
Temperature ( °C )

Hourly Analysis Program 5.11 Page 10 of 10